Frank Sartor MP, Minister for Planning has determined the following major development proposals:

  • DA-197-7-2005-i
  • Title: DA-197-7-2005-i – Warehouse and Distribution Facility, Fairfield East
  • Approved: 30 December 2005
  • Description: The construction and operation of a warehouse and distribution facility.
  • Location: 52-88 Lisbon Street, Fairfield East
  • LGA: Fairfield
  • Capital cost of development: $35 million
  • F/T Operational Positions: 180
  • Further inquiries: Caitlin Bennett - (02) 9228 6471
  • Details: Instrument of Consent
  • MOD No: 97-7-2005 DA No: 381-8-2003
  • Title: 2 TO 8 STOREY MIXED USE RESIDENTIAL BUILDING
  • Approved: 28 December 2005
  • Description: Construction of a two to eight storey mixed use residential apartment building comprised of 123 units, 17 commercial suites, 1 restaurant/café; parking for 232 spaces; 141 lot strata subdivision; plus landscaping, associated site works, associated amenities and facilities.
  • Location: Lot 14 (DP 270113) ‘Bellagio’ 9 Bayswater Drive, Homebush Bay.
  • LGA: Auburn Council
  • Details: Conditions - Planning Report
  • MOD No: 72-05-2005 DA No: 234-05-2003
  • Title:MOD 72-05-2005 to modify DA 234-05-2003 in the following manner:
  • Refused: 28 December 2005
  • Description: Modification to the approved configuration and number of suites on Level 6.
  • Location: Lot 5/1040822, Cnr Martin and Fawcett Streets, Ballina
  • LGA: Ballina Shire Council
  • Details: Determination Notification; Planning Report
  • MOD No: 98-7-2005 DA No: 513-12-2003
  • Title: 4 INTERCONNECTED MIXED USE RESIDENTIAL BUILDINGS
  • Approved: 28 December 2005
  • Description: Four (4) interconnected mixed use residential flat buildings ranging in height from 2 to 8 storeys comprising 170 residential apartments; 3 commercial / retail units; 288 car spaces; 1 car wash bay; landscaping, associated site works, associated amenities and site facilities; and; 173 lot strata subdivision and common property.
  • Location: Lot 21 (subdivision of Lot 9 in DP 270320) ‘Valencia’ 4 The Crescent, Homebush Bay.
  • LGA: Auburn Council
  • Details: Conditions - Planning Report
  • DA No: 40-3-2005
  • Title: DEMOLITION OF BUILDING 34, CONSTRUCTION OF NEW BUILDING TO CARRY OUT EXISTING WORKSHOP USES, FOX STUDIOS AUSTRALIA
  • Approved: 22 December 2005
  • Description:
    1. demolition of the existing Kurrajong Pavilion;
    2. earthworks to level and compact materials on site;
    3. construction of a new purpose built workshop comprising 3 separate tenancies with mezzanine levels in Units 1 and 3, terraces on the northern side, roller shutters and a large truck turning area on the north eastern side;
    4. the building will have a maximum height of RL 61.50 and a total floor area of 3,335 square metres;
    5. the building will comprise a steel workshop, paint/plaster workshop and construction workshop with purpose-built spray painting booths;
    6. replacement of existing retaining wall to the west of the subject site with a new wall of identical height and construction of a balustrade for pedestrian safety;
    7. stablisation of the rock face along the northeast perimeter wall of the Fox Studios Australia site;
    8. removal of seven poplar trees along the northeast boundary and replacement with seven deciduous trees;
    9. additional planting of two deciduous trees in the northern corner of the site;
    10. planting of four new trees along the boundary with Aussie Stadium;
    11. planting of four new trees along the rear of Building 33, on the upper terrace;
    12. removal of four trees along the existing boundary between Building 34 and Building 33 to allow for the construction of the retaining wall, and replacement with new trees; and
    13. planting of eleven new trees and under-storey shrubs on either side of the Burma Stair above the upper terrace of the Burma Gardens.
  • Location: Lot 51 DP 1041134
    Building 34, Working Studio Precinct, Fox Studios Australia
  • LGA: City of Sydney
  • Capital cost of development: $5,200,000
  • F/T Construction Jobs: 40
  • F/T Post Construction Jobs: 50
  • Details: Final Conditions and Determination - Planning Report
  • Title: Tugun Bypass
  • Approved: 21 December 2005
  • Description: construction and operation of a 7 km long, 4 lane restricted access motorway between Kennedy Drive, Tweed Heads (NSW) to Stewart Road interchange (Qld) and crossing through Commonwealth land (Gold Coast Airport). Two sections are located within NSW (total approximately 2.5 km) which are subject to this approval.
  • Location: Tweed Heads (NSW) to Currumbin (QLD)
  • LGA: Tweed Shire
  • Capital cost of development: $360,000,000
  • F/T Construction Jobs: up to 200
  • Details: Instrument PDF
    Director General's Report PDF
    Dec 1
    Dec 2
    Department of Lands
    Department of Natural Resources
    Department of Primary Industries PDF
    Compensatory Habitat Package
    Instrument - Attachment 1 (SoC)
  • DA Number: DA-282-11-2004-i
  • Title: Australian Bay Lobster Aquaculture Facility
  • Approved: 21 December 2005
  • Description: An application was made by Australian Bay Lobster Producers Pty Ltd for the construction and operation of a commercial bay lobster aquaculture facility and associated seawater supply works at Cudgen
  • LGA: Tweed
  • Capital Cost of Development: $18 million
  • F/T Construction Jobs: 200 operation, 25 construction
  • Details: Assessment Report - Conditions of Consent
  • DA 128-5-2005
  • Title: Lynwood Quarry, Marulan
  • Approved: 21 December 2005
  • Applicant: Readymix Holdings Pty Ltd
  • Description: The development of a hard rock quarry and associated processing and transportation facilities.
  • Location: Hume Highway and Stoney Creek Road, Marulan – about 1 kilometre west of Marulan.
  • LGA: Goulburn Mulwaree
  • Details: Development Consent; Assessment Report
  • DA-103-5-2005
  • Title: Ulan Coal Mine - Alterations and Additions
  • Approved: 21 December 2005
  • Description: Several alterations and additions to the Ulan coal mine, which include:
    • extending the existing open cut mine about 180 metres to the west of its approved limits;
    • relocating the approved but not constructed Ulan West surface infrastructure;
    • upgrading the coal handling, storage and train loading facilities;
    • constructing the Ulan West services corridor; and
    • extending the hub stockpile.
  • Location: 45 kilometres north-east of Mudgee
  • LGA:Mid-Western Regional Council
  • Capital cost of development: $67 million
  • F/T Construction Jobs: 96 full-time jobs for 2 years
  • Details: Instrument of Consent, Assessment Report, Applicant's Response to Submissions
  • DA No: 246-10-2004
  • Title: Staged Consent for four residential towers with mixed used at ground level.
  • Approved: 21 December 2005
  • Description:
    1. Four towers identified as:
      1. North Buildings (A and B)
      2. Centre buildings (C and D)
      3. Centre building (E)
      4. South building (F)
    2. land uses of "residential", "live work", "community facility", "childcare centre" and "retail",
    3. land uses totalling no more than 685 units (inclusive of 673 residential units, 6 "live/work" units, 4 retail units (if all proposed retail uses are consistent with relevant provisions of the SOPA Masterplan), 1 childcare centre and 1 community facility) with,
    4. a maximum number of 1360 bedrooms for residential development (including all "live/work" units),
    5. a total Gross Floor Area of no more than 79 053 square metres with floor plates as described in condition A10,
    6. car parking with a total number of vehicles not exceeding 930 spaces.
  • Location: Lot 3 of unregistered plan, Australia Avenue, Sydney Olympic Park as identified in survey plan (drawing number 31462-23 dated 21.9.2004, prepared by Frank M Mason & Co Pty Limited)
  • LGA: Auburn Council
  • Capital cost of development: 190,000,000
  • Details: Consent; Planning Report
  • DA No: 192-8-2004
  • Title: "The Dolphin", Harrington Waters Estate, Harrington
  • Approved: 21 December 2005
  • Description: 3 x 4 storey serviced apartment buildings (Blocks A, B and C) comprising a total of 54 units, with basement car parking, landscaping and associated site works on land within the 'resort precinct' of the Harrington Waters Estate.
  • Location: Lot 4146 in DP 1045068 and Part Lot 320 in DP 1045068
  • LGA: Greater Taree City Council
  • Capital cost of development: $17.31 Million
  • Details: Determination - Planning Report
  • MPA 1-9-2004
  • Title: Amendment to Sydney Olympic Master Plan
  • Approved: 21 December 2005
  • Applicant: Sydney Olympic Park Authority
  • Description: Amendments made to the Sydney Olympic Park Master Plan as described in the Sydney Olympic Master Plan amendment 2, 2005.
  • Location: Land identified within the Sydney Olympic Master Plan (may 2002).
  • LGA: Auburn
  • Details: Notice Of Determination & Planning Report
  • DA 504-00
  • Title: Clarence Coal Mine Extension
  • Approved: 19 December 2005
  • Description: The Development involves the expansion of the Clarence underground coal mine including:
    • extending the existing mine into a number of new mining lease areas to the south, west and east of the existing mine;
    • mining using two levels of extraction, namely first workings and partial extraction;
    • continuing to extract coal from the mine at a rate of up to 3 million tonnes per year; and
    • operating the mine extension for a period of 21 years.
  • Location: Clarence Coal Mine, approximately 10km east of Lithgow, NSW
  • LGA: Lithgow
  • F/T Post Construction Jobs: approximately 80 people
  • Details: Instrument of Consent - Assessment Report
  • 77-3-2002
  • Title: 162 lot subdivision, clearing of vegetation, filling, construction of roads and associated infrastructure, conservation zones and open space; construction of a bridge.
  • Approved: 17 December 2005
  • Description:
    1. Torrens title subdivision comprising 159 residential allotments, 2 integrated housing allotments and 1 allotment to accommodate an Aboriginal Cultural and Retail facility;
    2. Clearing of vegetation;
    3. Filling and earthworks;
    4. Provision and construction of roads and associated infrastructure, conservation zones and open space; and
    5. Construction of a bridge over the on-site creek in order to link George Bass Drive with the proposed development site.
  • Location: Lot 2 DP 1016146, George Bass Drive, (Barlings Beach) Tomakin
  • LGA: Eurobodalla Shire Council
  • Capital cost of development: $20,000,000
  • Details: Instrument of Consent and Conditions - Issues Summary for Minister - Ministerial Submission - Planning Report
  • 132-5-2005
  • Title: Telecommunication Facility
  • Approved: 17 December 2005
  • Description: Installation of a telecommunication facility comprising: a) one (1) x 43 metre high slimline monopole structure; b) three (3) cross polar panel antennas (each 2.7 metres long) turret mounted on the monopole at an elevation of EL 40.0m; c) one (1) parabolic radio communications dish (60mm in diameter) mounted lower on the pole; d)one (1) phase 7.5 (3m x 2.5m) equipment shelter coloured 'Merino' on elevated platform; and e) a cable ladder support adjacent to the base of the monopole.
  • Location: Lot 1 in DP 997897, 17 Fullerton Cove Road, Fullerton Cove
  • LGA: Port Stephens
  • Capital cost of development: $100,000
  • F/T Construction Jobs: 0.2
  • F/T Post Construction Jobs: 0.01
  • Details: Planning report ( PDF file, Final conditions ( PDF file.
  • Mod 172-11-2005
  • Title: Dunmore Quarry
  • Approved: 12 December 2005
  • Description: Construction of staff amenities building.
  • Location: Lo1 DP 21375, Tabitta Road, Dunmore
  • LGA: Shellharbour
  • Details: Assessment report , Notice of modification
  • DA 86/2720
  • Title: Penrith Lakes Scheme - Proposed Land Rehabilitation using Dynamic Compaction
  • Approved: 11 December 2005
  • Description: Use of Dynamic Compaction to rehabilitate a 10.8 hectares site within the Penrith Lakes Scheme
  • Location: Penrith Lakes Scheme.
  • LGA: Penrith
  • Capital cost of development:
  • F/T Construction Jobs:
  • F/T Post Construction Jobs:
  • Details: Notice of the modification of consent Assessment Report
  • DA 86-4-2004
  • Title: Three (3) lot residential subdivision
  • Date of Refusal: 8 December 2005
  • Description: Three (3) lot residential subdivision
  • Location: Lot 30 DP 263231
  • LGA: Shoalhaven
  • Details: Planning Report , Refusal Determination
  • DA No: 105-5-2005
  • Title: Demolition of existing, and construction of new residence
  • Approved: 8 December 2005
  • Description: Demolition of an existing one storey dwelling and the construction of a new two storey residence, rear deck and in ground swimming pool.
  • Location: Lot 5 DP 233157, 1096 Middle Head Road, Mosman
  • LGA: Mosman
  • Capital cost of development: $600,000
  • Details: Planning report , Notice of determination
  • DA 102-05-2005
  • Title: Demolition and construction of a two storey building
  • Approved: 7 December 2005
  • Applicant:
  • Description: Demolition of existing single storey dwelling and concrete driveway on the site and construction of new two storey residence building.
  • Location: Lot 4 DP 233157, 1095 Middle Head Road, Mosman
  • LGA: Mosman Municipal Council
  • Capital cost of development: $850,000
  • Details: Planning report , Notice of determination
  • DA No: 97-4-2005
  • Title: Demolition of existing dwelling and construction of new two storey residence
  • Approved: 7 December 2005
  • Description: Construction of a new two-storey building including: a) On ground level: three secondary bedrooms; one bathroom; one laundry; one rumpus room; one art room; one store room; a cover rear terrace; entry area and water feature and double garage – b) On first level: one study; one WC; kitchen and pantry; open plan living/dining area and associated deck are, walk-in-wardrobe room, laundry chute, ensuite and spa; and terrace over garage; – c) Outdoor pool and associated tiles area; – d) New concrete driveway; – e) New landscape works; and – f) Drainage works in accordance with the site stormwater concept plans.
  • Location: Lot 103 DP 1064882, 8 Markham Close, Mosman
  • LGA: Mosman Municipal Council
  • Capital cost of development: $1,200,000
  • Details: Planning report , Notice of determination
  • Lake Illawarra Entrance Works (Stage 2)
  • Approved: 7 December 2005
  • Applicant: Lake Illawarra Authority
  • Description: Construction of a breakwater/training wall on the northern side of the Lake Illawarra entrance; extension of the existing southern breakwater; dredging of a substantial channel within the lake's entrance; sand nourishment of Warilla Beach utilising the dredged material from the entrance; and creation of a small bird habitat island.
  • Location: Lake Illawarra, 8 kilometres south of Wollongong
  • LGA: Wollongong and Shellharbour LGAs
  • Capital cost of development: $4 million
  • Details: Director-General's Report and Conditions of Approval, Appendix A (Performance Indicators), Appendix B (Impact on Windsurfing/Wavesailing)
  • DA No: 21-2-2005
  • Title: Construction of 2 Bunkroom Cabin at Wallum Cottages
  • Approved: 6 December 2005
  • Description: 2 Bunkroom Cabin at Lot 4 DP 259465
  • Location: Lot 4 DP 259465 No. 1060 Point Plomer Road, Crescent Head
  • LGA: Kempsey
  • Capital cost of development: $25,000
  • Details: Instrument of Conditions - Planning Report
  • MOD No: 162-10-2005, DA No: 11-1-2004
  • Title: Quarterdeck Activity Centre
  • Approved: 6 December 2005
  • Description: MOD 162-10-2005 to modify DA 11-1-2004 in the following manner: Delete pergola adjoining the northern side of the approved tennis court, and; Add floor space of (2.9 x 3.2) square metres over an approved void space at the western end of the building located at the southern end of the existing tennis courts.
  • Location: Lot 8 DP 270320, 1 The Crescent, Homebush Bay
  • LGA: Auburn
  • Details: Planning report , Notice of determination
  • DA No: 181-8-2004
  • Title: Demolition of Cottage & Construction of 6 Apartments
  • Approved: 6 December 2005
  • Description: Construction of a 4-Storey Residential Flat Building containing 6 Apartments over 2 Levels of Basement Car Parking with 14 Car Spaces and Strata Subdivision
  • Location: Lot 2 DP 15998 90 Magnus Street, Nelson Bay
  • LGA: Port Stephens Council
  • Capital cost of development: $2.5 million
  • Details: Determination - Planning Report
  • DA No. 175-7-2005-i
  • Title: Use of Existing Warehouse for the Collection, Storage and Transfer of Chemcial Waste
  • Approved: 5 December 2005
  • Applicant: Chemsal Pty Ltd
  • Description: Changes to the type, volume and storage time of chemical wastes at an existing warehouse in Wetherill Park.
  • Location: Lot 7 DP 788089, 12 Bushells Place, Wetherill Park.
  • LGA: Fairfield
  • Capital cost of development: $12,000.00
  • F/T Post Construction Jobs: 13
  • Details: Notice of determination
  • DA No: 170-7-2004
  • Title: IMPROVEMENTS TO CARAVAN PARK INCLUDING DEMOLITION OF OLDER BUILDINGS, CONSTRUCTION OF NEW BUILDINGS AND REORGANISATION OF SERVICES
  • Approved: 4 December 2005
  • Description: The removal of the existing car park and the construction of a new car park and new office/residence adjacent to the new entry road;
    • The demolition of the existing office/manager's residence, and:
    • The staged demolition of two existing amenities blocks
    And; (2) The construction of:
    • An entry/exit point on Murramarang Road and a new entry road into the park together with control by way of boom gates;
    • A central community facilities building with restaurant, bar and meeting areas;
    • An indoor swimming pool with associated gymnasium.
    • A theatre building
    • A building for children's play and activities together with an adjoining playground;
    • An office/residence, and
    • Basketball courts
  • Location: Lot 1 DP 579750
    381 Murramarang Rd, Bawley Point, Shoalhaven, 2539
  • LGA: Shoalhaven City Council
  • Capital cost of development: $2.9 million
  • Details: Standard Conditions; Planning Report
  • MOD No: 151-9-2005, DA No: 80-4-2004
  • Title: Construction of three retail/commercial office buildings, subdivision of land into 4 separate parcels, associated basement parking, basement public car parking, wind turbine zones, landscaping and public improvement works
  • Approved: 1 December 2005
  • Description: MOD 151-9-2005 to modify DA 80-4-2005 as following: Inclusion of an atrium at the western end of building 5. This will involve the removal of the "shaped edges" and balconies to the building's western end and the provision of a recessed glazed element between the wings with two sliding door openings to Marshall Road; Provisions of foot bridges within the atrium at levels 3 - 6; Alterations to the south west fire stairs to exit at grade and rationalisation of the levels in the north west public stair; Deletion of the stairs in the through site link and the widening of the ramps; Deletion of the indoor / outdoor planters and the addition of a wide central access stair to connect Marshall Road with the proposed atrium; The use of the western end of level 1 as a cafeteria (re located from ground level).The cafeteria includes a street front component to Herb Elliot Drive; The inclusion of a new storage area within the ground level; Design amendments to the basements to improve the efficiencies of the car parking. This results in a loss of 10 spaces; Design amendments to the facades of the building to fit with the comments of the SOPA Design Review Panel; Amendments to the soft landscaping to the interface area between site 5 and the Heritage precinct.
  • Location: Part Lot 79 DP 875562, Lot 50 DP 104552, Lot 6002 DP 1063407 - Sites 5 Dawn Fraser Avenue, Sydney Olympic Park NSW 2127
  • LGA: Auburn
  • Details: Planning report , Notice of determination
  • DA 104-5-2005
  • Title: Ultra Fine Coal Recovery Project
  • Approved: 30 November 2005
  • Description: The proposal involves the construction and operation of:
    • a coal flotation facility located near the Hunter Valley Operations (HVO) mining complex, coal handling and preparation plant (CHPP);
    • a dewatering facility located near the Bayswater Power Station;
    • a 12 km dual pipeline connecting the HVO CHPP with the coal flotation facility and the coal flotation facility with the dewatering facility; and
    • a 180m long conveyer to transfer ultra fine coal from the dewatering facility to Macquarie Generation’s existing coal conveyers.
  • Location: Near the Bayswater Power Station and the Hunter Valley Operations mining complex in the Hunter Valley.
  • LGA: Singleton and Muswellbrook
  • Details: Instrument of Consent - Assessment Report
  • DA No. 98/35
  • Title: Modification of the Hillgrove Mine Development Consent
  • Approved: 25 November 2005
  • Applicant: New England Antimony Mines NL. Consent currently held by Straits (Hillgrove) Gold Pty Limited
  • Description: The modification allows the relocation of the approved Tailings Storage Facility 2 about 70 mentres to the north and away from the escarpment of Bakers Creek Gordge.
  • Location: Hillgrove Mine is located approximately 30 kilometres east of Armidale in the New England Region of NSW.
  • LGA: Armidale Dumaresq Council
  • Details: Notice of Modification and Consolidated conditions of consent
  • MOD No: 144-9-2005, DA No:230-5-2003
  • Title: Modifications to awnings
  • Approved: 19 November 2005
  • Description: Mixed Use development consisting of 4 multi-storey buildings and associated facilities:Building A1: 7 storey apartment building containing 26 residential apartments, 361m2 ground floor retail space and 93 basement car parking spaces; Building A2: 5 storey apartment building containing 24 apartments, 650m2 ground floor retail space and shared basement car parking with Building A1; Building B1: 9 storey apartment building containing 41 residential apartments, 497m2 ground floor retail space and 108 basement car parking spaces; Building B2: 6 storey apartment building containing 44 apartments, 646m2 ground floor retail space and shared basement car parking with Building B2; temporary 200 space car park; 2 lot subdivision; and associated rights of way
  • Location: Honeysuckle Drive, Newcastle (Buildings A1, A2, B1, B2)
  • LGA:Newcastle
  • Details: Planning report, Notice of consent
  • DA No. 143-6-2005
  • Title: Erection of two apartment buildings containing 372 residential apartments, childcare centre for 40 children, car parking for 483 vehicles and associated strata subdivision
  • Approved: 17 November 2005
  • Description: Six interconnected residential buildings comprising no more than 307 units and a Gross Floor Area of no more than 32,283.2 square metres; (2) basement car parking of no more than 413 cars; (3) a childcare centre accommodating no more than 40 children, and (4) subdivision (including strata subdivision).
  • Location: Lot 12 DP 1062326 Mary Street, Rhodes
  • LGA: City of Canada Bay
  • Capital cost of development: $93,000,000
  • Details: Planning report , Notice of determination
  • MOD No: 141-9-2005 DA No: 99-3-2003
  • Title: MOD 141-9-2005 to modify DA 99-3-2003 in the following manner:
  • Approved: 16 November 2005
  • Description: Amend Condition D6 to extend the hours of construction regarding approved development
  • Location: Lot 3, 8 and Part Lot 7 in DP 1047108, 1 Mary Street, Rhodes
  • LGA: City of Canada Bay
  • Details: Conditions - Planning Report
  • MOD No: 143-9-2005 DA No: 375-12-2001
  • Title: MOD 143-9-2005 to modify DA 375-12-2001 in the following manner:
  • Approved: 16 November 2005
  • Description: Delete Condition 12.7.1 and insert new condition regarding car parking provision
  • Location: Parts Lots 19 and 20 in DP 1049524, 1 Mary Street, Rhodes
  • LGA: City of Canada Bay Council
  • Details: Conditions - Planning Report
  • MOD No: 149-9-2005 DA No: 99-3-2003
  • Title: MOD 149-9-2005 to modify DA 99-3-2003 in the following manner:
  • Approved: 16 November 2005
  • Description: Amend Condition E8 regarding approved development and delete Condition E8(2)
  • Location: Lots 3, 8 and part Lot 7 DP 1047108, 1 Mary Street, Rhodes
  • LGA: City of Canada Bay
  • Details: Conditions - Planning Report
  • 21-1-2004
  • Title: DETERMINATION OF DEVELOPMENT APPLICATION NO. DA 21-1-2004 UNDER SECTIONS 80(4) AND (5) OF THE ENVIRONMENTAL PLANNING AND ASSESSMENT ACT 1979
  • Approved: 16 November 2005
  • Description: Residential Development; Bulk earthworks / excavations, basement car parking and strata subdivision of 145 apartments with 15,954 square metres GFA from initial stratum subdivision of 4 lots that are a hotel / function facility; 7 local shops, residential apartments and residential serviced apartments
  • Location: Lot 62 DP 1048445
  • LGA: City of Canada Bay Council
  • Capital cost of development: $34,000,000
  • F/T Construction Jobs: 150
  • F/T Post Construction Jobs: 35
  • Details: Instrument of Consent
  • MOD 129-8-2005
  • Title: Dartbrook Coal Mine Section 96(2) Modification
  • Approved: 16 November 2005
  • Applicant:
  • Description: Approval was provided for the: establishment of four new Run-of-Mine (ROM) coal stockpiles; expansion of the existing emergency ROM coal stockpile at the Dartbrook Coal Handling and Preparation Plant; underground tailings disposal in the Wynn Seam goaf area; and operation of a Nitrogen Injection Plant over the Kayuga Seam mine workings.
  • Location: Dartbrook Coal Mine, Stair Street, Muswellbrook.
  • LGA: Muswellbrook and Upper Hunter
  • Capital cost of development:
  • Details: Notice of Modification of Consent , Consolidated Conditions of Consent and Assessment Report
  • DA No. 134-04-00
  • Title: Modification of Development Consent for the Blayney Concentrate Dewatering Facility
  • Approved: 16 November 2005
  • Description: The modification involves: Installing a new opening in the northern wall of the Blayney Concentrate Dewatering and Loading Facility; and Partly enclosing the existing opening on the eastern wall of the building.
  • Location: Blayney
  • LGA: Blayney Shire Council
  • Details: Consolidated Conditions of Consent
  • MOD No: 115-11-2005, DA No: 388-8-2003
  • Title: Mixed use building
  • Date of refusal: 16 November 2005
  • Description: Residential building comprising 42 units, local shops and childcare centre
  • Location: Lot 22 DP 624240, 2-4 Walker Street, Rhodes
  • LGA: City of Canada Bay
  • Details: Planning report , Notice of determination
  • DA No. 139-6-2005-i
  • Title: Upgrade and Expansion of the Cold Mill and Pickle Line at the Port Kembla Steelworks
  • Approved: 9 November 2005
  • Applicant:
  • Description: Upgrade of Cold Mill and Pickle Line to convert 850,000 tonnes of hot rolled coil to higher value products. Existing capacity is 504,000 tonnes.
  • Location: Lot 1 DP 606434, 1 Five Island Road, Port Kembla Steelworks, Wollongong
  • LGA: Wollongong
  • Capital cost of development: $78,000,000
  • F/T Construction Jobs: 250
  • Details: Notice of Determination Planning Report
  • DA No. 113-5-2005-i
  • Title: Reline of No.5 Blast Furnace at the Port Kembla Steelworks
  • Approved: 9 November 2005
  • Applicant:
  • Description: Reline and clean of the No.5 Blast Furnace at the Port Kembla Steelworks.
  • Location: (Lot 1 DP 606434) 1 Five Islands Road, Port Kembla Steelworks, Wollongong
  • LGA: Wollongong
  • Capital cost of development: $154,000,000
  • F/T Construction Jobs: 800
  • Details: Notice of determination , Planning report
  • DA 88-4-2005
  • Title: East Boggabri Coal Mine
  • Approved: 9 November 2005
  • Description: The proposal includes: constructing on-site infrastructure (including a run-of-mine (ROM) coal crushing and screening plant, coal loading bin, offices and workshops); constructing off-site infrastructure (coal haul road on private lands and upgrading of Council roads); extracting up to 12.4 million tonnes of ROM coal, using open cut mining methods, at a maximum rate of 2.0 million tonnes a year; crushing and screening coal on site before transporting it by road to the Whitehaven Siding Coal Handling and Preparation Plant at Gunnedah; receiving and emplacing of about 70,000 tonnes of coal rejects a year from the Whitehaven Siding Coal Handling and Preparation Plant; receiving and using gravel for the construction of roads; and progressively rehabilitating the site.
  • Location: Maules Creek and Goonbri Roads, East Boggabri, about 15 kilometres northeast of Boggabri.
  • LGA: Narrabri and Gunnedah.
  • Details: Instrument of Consent , Assessment Report and Assessment Report Appendix B.
  • DA 36-3-2005
  • Title: Tourist Accommodation
  • Approved: 5 November 2005
  • Description: Construction of a 3 storey tourist accommodation building comprising 15 units ans 16 basement car parking spaces
  • Location:Part 3 Lot 3 DP 758571 & Part 4 Lot 3 DP 758571, 17-19 Kingscliff Street, Kingscliff
  • LGA: Tweed
  • Capital cost of development: $3,000,000
  • Details: Notice of determination
  • DEVELOPMENT APPLICATION – SCA 5-9-2005
  • Title: Subdivision Certificate Application SCA 5-9-2005
  • Approved: 3 November 2005
  • Description: Four (4) lot subdivision including residue lot
  • Location: Lot 40 DP 873840 – 161 Golf Links Road, Woodford Island
  • LGA: Clarence Valley Council
  • Details: Subdivision Certificate Determination - Subdivision Certificate Report
  • DA 105/90
  • Title: Glennies Creek Colliery – Section 96(2) Modification
  • Approved: 1 November 2005
  • Description: Approval was provided for:
  • an increase of run of mine coal production from 3 million to 4.5 million tonnes per year;
  • continuing use of existing mine-related infrastructure, facilities and services;
  • additional surface facilities at the existing pit top area including:
  • various demountable buildings;
  • sealed extension of the car park;
  • storage compound;
  • additional underground water supply tanks; and
  • extension of the existing electrical substation;
  • ballast delivery and stockpile area at the Forest Road Ventilation Shaft for underground road maintenance activities; and
  • various administrative changes to the conditions of consent to improve the regulation of the mine.
  • Location: 10 kilometres northwest of Singleton in the Upper Hunter Valley
  • LGA: Singleton
  • Details: Notice of Modification of Consent - Consolidated Conditions of Consent - Consolidated Conditions of Consent RTF - Assessment Report
  • DA 50-3-2005
  • Title: Antiene Rail Coal Unloader
  • Approved: 7 November 2005
  • Description: Rail unloading facility to supply up to 15 million tonnes of coal per year to the Bayswater Power Station. The development includes the construction and operation of: " a new rail loop off the Main Northern Rail Line at Antiene; an unloading hopper and associated facilities (including minor maintenance, fuel storage and refuelling facilities); and an overland conveyer to transport coal to the Bayswater Power Station.
  • Location: Off Antiene Road approximately 8 km south of Muswellbrook, NSW.
  • LGA: Muswellbrook
  • Capital cost of development:
  • Details: Assessment Report Instrument of Consent
  • DA 247-10-2004
  • Title: Lot 14 DP 243348, Sapphire Coast Road, Tura.
  • Approved: 1 November 2005
  • Description: 2 lot rural residential subdivision
  • Location: Lot 14 DP 243348, Sapphire Coast Road, Tura.
  • LGA: Bega Valley Shire Council
  • Details: Planning report , Instrument of Consent
  • DA 266-11-2004
  • Title: Tourist Accommodation
  • Approved: 1 November 2005
  • Description: Tourist accommodation incorporating 20 motel units, 4 serviced apartments, 1 managers unit and ground floor café with basement car parking for 32 cars.
  • Location:Lot 1 DP 859856 11-13 Park Street, Evans Head
  • LGA: Richmond Valley
  • Capital cost of development: $4 000 000.00
  • Details: Planning report , Notice of determination
  • DA 241-9-2004
  • Title: Two (2) lot subdivision
  • Approved: 1st November 2005
  • Description: Two (2) lot Torrens title subdivision
  • Location: Lot 2 in DP 748915
  • LGA: Tweed Shire Council
  • Details: Planning report , Notice of determination
  • DA 94-4-2004
  • Title: Calga Sand Quarry Extension
  • Approved: 28 October 2005
  • Description: The Development involves the expansion of the Calga Sand Quarry including:
  • extracting a total of 5.5 million tonnes of friable sandstone;
  • processing the sand in one of two processing plants;
  • importing materials (including soils, fine aggregates and excavated sandstone) for blending with extracted sand;
  • transporting up to 400,000 tonnes of sand and sand products per year by road to markets; and
  • progressively rehabilitating the site, to support ongoing agricultural land use.
  • Location: Calga Sand Quarry, approximately 1.7km northwest of the Calga interchange on the F3 Freeway, NSW
  • LGA: Gosford
  • Details: Instrument of Consent - Assessment Report
  • DA 279-11-2004
  • Title: Lots 2 & 5 DP 270062 Plantain Road, Korora, Coffs Harbour
  • Approved: 28th October 2005
  • Description: Stage 1: subdivision by boundary adjustment of community development lots 2 and 5 in DP 270062.
    Stage 2: severance, (from lots 2 & 3 of DP 270062, SP 36059 and SP 47296) of community development lot 5 in DP 270062, to convert that lot into a Torrens title lot shown as "residual" on Russell Brownett Calnan plan ref 8528/DA/st1.
    Stage 3: subdivision of lot 5 in DP 27062 to create public reserves and a public road as shown on Russell Brownett Calnan plan ref 8528/DA/st1 also a strata development lot as shown on Russell Brownett Calnan plan "surveyors reference 04/22-85281 sheets 1-5, "
    Stage 4: staged construction of eighty five (85) residential dwellings, and one (1) dwelling in a building also containing a general store and restaurant and staged strata subdivision.
  • Location:Lots 2 & 5 DP 270062 Plantain Road, Korora, Coffs Harbour
  • LGA: Coffs Harbour
  • Capital cost of development: $9.6m
  • Details: Planning report , Instrument of consent
  • DA 158-6-2004
  • Title: Two (2) lot rural residential subdivision
  • Refusal: 27 October 2005
  • Description: Two (2) lot rural residential subdivision
  • Location: Lot 52 DP 791141, 3 Panorama Drive, Diamond Beach
  • LGA: Greater Taree City Council
  • Details: Planning report , Notice of determination
  • DEVELOPMENT APPLICATION – 137-6-2004
  • Title: 4 lot rural residential subdivision
  • Refused: 26 October 2005
  • Description: 4 lot rural residential subdivision which will require access and clearing a large portion of the land
  • Location: Lot 2, DP 250022 Lot 2 Cullendulla Drive, Long Beach 2536
  • LGA:
  • Details: Refusal Determination - Planning Report
  • DA 74-3-2005
  • Title: Improvements to existing Caravan Park
  • Date of refusal: 26 October 2005
  • Description: Improvements to existing Caravan Park including 223 new dwelling sites and associated amenities and an upgraded wastewater treatment system.
  • Location: Lots 66, 67 & 68 DP 751388 and Lot 1 DP 823611, 286 O'Keefe's Lane, Palmers Island
  • LGA: Clarence Valley
  • Capital cost of development: $2.9 million
  • Details: Planning report , Reasons for refusal
  • DA 68-3-2005
  • Title: Mobile Telecommunications Facility
  • Approved: 25 October 2005
  • Description: Installation of a mobile phone (CDMA) and RFS/Council telecommunications facility adjacent to the existing Currarong RFS Station. The proposed concrete monopole (30m) will replace the existing lattice tower (15m) utilised by the RFS for hose drying and flag flying purposes. Shoalhaven City Council and the NSW RFS have agreed to install telecommunications infrastructure on the facility as part of an arrangement with Telstra.
  • Location: Fishery Road, Currarong
  • LGA: Shoalhaven
  • Capital cost of development: $150,000
  • F/T Construction Jobs: 2
  • F/T Post Construction Jobs: 0.5
  • Details: Planning report , Notice of determination
  • DA 161-7-2005
  • Title: Newpac No. 1 Colliery Product Coal Stockpiles
  • Approved: 25 October 2005
  • Description: The Development involves the establishment of additional coal stockpiling facilities and associated infrastructure on a site to the west of the Ravensworth coal preparation plant and rail terminal, which is located to the west of the Newpac No. 1 Colliery.
  • Location: Approximately 500 metres west of the Ravensworth Coal Terminal, Ravensworth, NSW.
  • LGA: Singleton
  • Details: Instrument of Consent - Assessment Report
  • DA-259-10-2004
  • Title: 3 Lot Subdivision
  • Approved: 24 October 2005
  • Description: Subdivide Lot 103 DP 708345 in Glenella Road, Batehaven, into three residential lots, with the following areas: Lot 1 - 1.12ha; Lot 2 - 7490sq.m; Lot 3 - 6890sq.m
  • Location: Lot 103 DP 708345, 107 Glenella Road, Batehaven
  • LGA: Eurobodalla Shire Council
  • Capital cost of development: $15,000
  • Details: Planning report , Notice of Determination
  • MODIFICATION APPLICATION – 133-8-2005 MOD No: 133-8-2005 DA No: 398-11-2000
  • Title: Construction of Honeysuckle House in two stages
  • Approved: 21 October 2005
  • Description: MOD 133-08-2005 to modify DA 398-11-2000 the following manner: § Amend General Condition 1 regarding approved development
  • Location: Lot 1112 / DP 883474 Honeysuckle Drive Newcastle Development
  • LGA: Newcastle
  • Details: Conditions - Planning Report
  • DA No 20-1-2004
  • Title: Construction of 5 tourist apartments
  • Refused: 21st October 2005
  • Description: Demolish existing dwellings and construction of 5 tourist apartments with underground parking for 7 cars.
  • Location: Lot B in DP 390332, 17 Fegan Street, Huskisson
  • LGA: Shoalhaven
  • Capital cost of development: $800,000
  • F/T Construction Jobs: 6
  • F/T Post Construction Jobs: 2
  • Details: Determination - Planning Report
  • MOD No: 135-8-2005, DA No: 146-6-2004
  • Title: Multi-unit housing development
  • Approved: 21 October 2005
  • Description: MOD 135-8-2005 to modify DA 146-6-2004 the following manner: Amend conditions B26 and F13 regarding approved development.
  • Location: 12-16/DP3055, 11/DP1005127, A+B/337971, 1/DP914191, B/DP326955 9-25 Tryon Rd, Lindfield
  • LGA: Ku-ring-gai Council
  • Details: Instrument of consent - Planning report
  • MOD 59-4-2005 modifying DA 82-4-2004
  • Title: Lot 2 DP 1062056, Lyons Road, Sawtell
  • Approved: 20 October 2005
  • Description: Amend conditions to allow the staging of the subdivision.
  • Location: Lot 2 DP 1062056, Lyons Road, Sawtell
  • LGA: Coffs Harbour
  • Details: Final conditions - Modifications report
  • MP Number: MP 51-11-2004
  • Title: Adoption of Master Plan MP 51-11-2004
  • Date of Approval: 18 October 2005
  • Description: Development of tourist, residential and recreational facilities on the residual lands surrounding the Pacific Bay Resort, Coffs Harbour.
  • Location: Lot 4 DP 1052296, Pacific Highway, Coffs Harbour
  • LGA: Coffs Harbour
  • Details: Instrument of Adoption - Planning Report
  • DA Number: 156-7-2005
  • Title: Internal demolition and fit out for office use
  • Date of Approval: 17 October 2005
  • Description: Demolition of existing internal fit out previously used by the Conservatorium of Music of New South Wales and construction of a new fit out to be used as office space at Bay 3 and Bay 4, Level 1 Locomotive Workshop, Australian Technology Par, Eveleigh.
  • Location: Lot 42 DP 877901 Bay 3 & 4, Level 1 Locomotive Workshop, Australian Technology Park
  • LGA: City of Sydney
  • Capital Cost of Development: $275,000
  • Details: Notice of Determination - Planning Report
  • MOD No: 146-9-2005, DA No: 230-5-2003
  • Title: Erection of four mixed use buildings
  • Approved: 15 October 2005
  • Description: MOD 146-9-2005 to modify DA 230-5-2003 in the following manner: Amend condition A1 (1) describing the approved development as including "10 three-bedroom apartments" to read "9 three-bedroom apartments"; Amend condition B31 Monetary Contributions to reflect the above.
  • Location: Lot 12 in DP 883474, 3 Honeysuckle Drive, Newcastle
  • LGA: Newcastle
  • Details: Planning report , Notice of consent
  • DA No. 374-11-00-MOD1
  • Title: Modification of the Syerston Nickel Cobalt Project
  • Approved: 15 October 2005
  • Applicant: Ivanplats Syerston Pty Limited
  • Description: The proposed modification involves increasing the nickel cobalt ore processing rate from 2.3 to 2.5 million tonnes a year, removing the metals refinery from the processing facility and increasing the limestone quarry’s extraction rate from 6000,000 to 790,000 tonnes a year.
  • Location: The mine and processing facility is located approximately 4.5 kilometres north-west of the village of Fifield and 45 kilometres north-east of Condobolin.
  • LGA: Lachlan, Forbes and Parkes
  • Details: Consolidated Consent - Assessment Report
  • MOD No: 145-09-2005, DA No: 232-05-2003
  • Title: Lee Wharf foreshore public domain works, harbour foreshore promenade, timber boardwalk and pontoon, landscaped public open space.
  • Approved: 15 October 2005
  • Description:Public Domain Works: Harbour Foreshore Promenade, Demolition of existing dilapidated remnants of wharf structure and sea wall, Timber boardwalk, Timber pontoon/floating walkway, Landscaping of Public Open Space. MOD 145-09-2005 to modify DA 232-05-2003 the following manner: amend condition A2 regarding approved development
  • Location: Part Lot 51 DP 1036132 Lee Wharf Foreshore, Newcastle
  • LGA: Newcastle
  • Details: Planning report Final conditions
  • DA No 234-9-2004
  • Title: Subdivision
  • Approved: 15 October 2005
  • Description: Two (2) lot rural residential subdivision
  • Location: Portion 134 DP 752130, Comben Lane, Bermagui
  • LGA: Bega
  • Details: Conditions - Planning Report
  • DEVELOPMENT APPLICATION – 114-4-2002
  • Title: Subdivision of land for residential allotments – Stage 3 Naval stores site, Spurway Street, Ermington
  • Approved: 15 October 2005
  • Description: Staged subdivision of lot 1006 in DP 1040571 into 190 residential allotments;
  • Construction of the portion of the collector road (Central Avenue) from the extension of River Road to the western end of Creek Park;
  • Construction of local roads 1st, 2nd, 3rd, 4th, 5th, 6th, 9th (connecting to Silverwater Road), 10th, 11th and 12th Street;
  • Construction of a major stormwater system for the site incorporating water quality ponds within the proposed Navy Park;
  • Construction of a large park (Broadoaks Park) for informal active and passive recreation;
  • Construction of three small parks (pocket parks);
  • Landscaping of small section of the foreshore park (River Park) contained within site;
  • and
  • Provision of infrastructure within Stage 3 (electricity, stormwater, sewer, telecommunications).
  • In addition to the following off site works:
  • Landscaping of the Silverwater Road embankment; and
  • Landscaping and drainage works to the strip park along the foreshore (River Park).
  • Location: Lot 1006, DP 1040571, Spurway Street, Ermington
  • LGA: Parramatta City Council
  • Details: Conditions - Planning Report
  • DA No 223-9-2004
  • Title: Subdivision of 3 existing lots to create 3 lots
  • Approved: 15 October 2005
  • Description: Development described in Condition A1, Part A, Schedule 2
  • Location: 83 Herman Lane & Emigrant Point Road, Pimlico, Ballina Lot 4 DP 740725, Lot 55 DP 755731, Lot 1 DP 185226
  • LGA: Ballina
  • Details: Conditions - Planning Report
  • DA 120-5-2005
  • Title: Construction of a new four storey commercial building
  • Approved: 15 October 2005
  • Description: Construction of a new four storey commercial building with associated car parking and landscaping at 8 Parkview Drive, Sydney Olympic Park.
  • Location: Lot 812 DP 1012563, 8 Parkview Drive, Sydney Olympic Park (Quad 4)
  • LGA: Auburn
  • Capital cost of development: $15,000,000
  • Details: Conditions - Planning Report
  • DA No: 311-12-2004
  • Title: Four (4) lot rural subdivision and one (1) residue lot
  • Approved: 15 October 2005
  • Description: Four (4) lot rural subdivision of the subject site into Lot 1 (8.9ha), Lot 2 (9.6ha), Lot 3 (8.1ha), Lot 4 (9.9ha) and a residue lot.
  • Location: Lots 4, 102, 105, 110, 110 DP 565825 Tathra, Bermagui Road
  • LGA: Bega Valley Shire Council
  • Details: Determination and Conditions - Planning Report
  • DA No: 232-9-2004
  • Title: Six (6) lot subdivision
  • Date of Approval: 15 October 2005
  • Description:Six (6) lot subdivision, Lot 6 DP 609457, Lot 6 DP 814992, Lot 1 DP 256511, Lot 9 DP 883087, Lot 1 DP 1064289, Lot 1 DP 128120, Lot 1 DP 242491, Lot 45 DP 755731 and Lot 1 DP 772978
  • Location: Ballina
  • LGA: Ballina
  • Details: Planning Report - Intrument of consent - Conditions
  • DA Number: DA 4
  • Title: Penrith Lakes Scheme – Camenzuli Property
  • Date of Approval: 13 October 2005
  • Description: Proposed sand extraction and rehabilitation within Lot 2 DP617921 (the ‘Camenzuli property’), Penrith Lakes Scheme.
  • Location: Camenzuli Property, Penrith Lakes Scheme.
  • LGA: Penrith
  • Details: Notice of the modification of consent - Assessment Report
  • DA Number: DA-494-11-2003-i
  • Title: Port Botany Expansion (Stage 1)
  • Date of Approval: 13 October 2005
  • Description: the construction and operation of a new container terminal and associated infrastructure at Port Botany to increase the available container throughput capacity at the port to 3.2 million TEUs (twenty foot equivalent units). The Stage 1 approval of the port expansion consists of:
    Extension of the existing Brotherson Dock North container terminal covering approximately 51 hectares, including reclaiming 46 hectares of land through dredging.
    Provision of supporting infrastructure including road, rail and terminal facilities; and, Enhancement of the public and ecological areas adjacent to the proposed new container terminal.
  • Location: Land Described as:
    Lot 2 DP 1009870, Lot 6 DP 1053768, Lots 301 & 302 DP 712992, Part of Crown Reserve R91288, Lots 203 & 205 DP 712991 and Lot 401 DP 816961,
  • LGA: Botany Bay
  • Details: Instrument of Consent - Department’s Recommendation - Primary Submission to Commission of inquiry - Reply Submission to Commission of inquiry
  • DA Number: 295-12-2004
  • Title: Two (2) lot subdivision
  • Date of Approval: 7 October 2005
  • Description: Two (2) lot rural residential subdivision
  • Location: Lot 50 DP 847756
  • LGA: Coffs Harbour City Council
  • Details: Conditions - Planning Report
  • DA Number: DA-75-4-2005
  • Title: Camden Gas Project - Stage 2 Sugarloaf Farm.
  • Approved: 7 October 2005
  • Applicant: Sydney Gas (Camden) Operations Pty Ltd
  • Description: The proposed construction and operation of 7 coal bed methane wells and associated infrastructure on Sugarloaf Farm. Connection of the wells to the Stage 2 Camden Gas Project and production of methane gas.
  • Location:Lot 2 DP 842735 (Wells SL1, SL2, SL3, SL5, gas gathering system and access roads) - Lot 3 DP 1007066 (Wells SL4, SL6, SL7, gas gathering system and access roads) - Lot 2 DP 717439 (gas gathering system and access roads) - Lot 3 DP 622362 (gas gathering system) - Lot 58 DP 632328 (gas gathering system) - Lot 200 DP 1046336 (access roads) -
  • LGA: Campbelltown
  • Details: Development Consent - Assessment Report
  • DA Number: 288-11-2004
  • Title: Subdivision of existing lot into 2 lots
  • Date of Approval: 7 October 2005
  • Description: Subdivision of existing lot into 2 lots and reconstruction and sealing of the existing gravel access right of way.
  • Location: Lot 2 DP 573249 Hunter Close, Sapphire
  • LGA: Coffs Harbour
  • Details: Determination - Planning Report
  • DA Number: 310-12-2004
  • Title: Subdivision
  • Date of Refusal: 7 October 2005
  • Description: Five (5) lot rural residential subdivision
  • Location: Lot 1 DP 986116 and Lot 22 DP 252308, Tinonee Road, Mondrook
  • LGA: Greater Taree City Council
  • Details: Refusal - Planning Report
  • MP No 37-9-2005
  • Title: Request to waive Master Plan requirement.
  • Refused: 5 October 2005
  • Description: Request to waive the Master Plan requirement for land on which a five (5) lot rural residential subdivision is proposed.
  • Location: Lot 1 DP 986116, Tinonee Road, Mondrook
  • LGA: Greater Taree City Council
  • Details: Refusal - Planning Report
  • DA Number: DA 250-10-2004-i
  • Title: Woodlawn Wind Farm
  • Date of Approval: 4 October 2005
  • Description: To construct a 50 MW (25 X 2 MW turbine) wind farm with the capability to provide 140 000 MWh of electricity per year. The development also includes an underground electrical cable network, linking each turbine to a substation, an electrical substation, a site control room/facilities building, a 66kV overhead transmission line (approximately 3.7 km in length), and a viewing platform.
  • Location: The development is located on two adjacent properties, Woodlawn and Pylara, off Collector Road near Tarago, approximately 50 km north-east of Canberra and approximately 37 km south of Goulburn.
  • LGA: Goulburn Mulwaree Council, Palerang Council
  • Details: Instrument of Approval and Conditions - Planning Report
  • MP No: 43-10-2004
  • Title: Adoption of Master Plan MP 43-10-2004
  • Approved: 30 September 2005
  • Description: Sepp 71 master plan for a 68 lot rural residential subdivision of land at Manor Road, Harrington.
  • Location: Lots 1 & 2 DP 621005 and Lot 31 DP 847223 at Manor Road, Harrington
  • LGA: Greater Taree City Council
  • Details: Instrument of Adoption - Planning Report
  • DA Number: 253-10-2004
  • Title: Subdivision and creating of dwelling
  • Date of Approval: 27 September 2005
  • Description: Subdivision to create two additional lots and erection of two and three bedroom dwellings
  • Location: Lot 4 DP 1016359, 3023 Princess Highway, Millingandi
  • LGA: Bega Valley
  • Capital Cost of Development: $450,000
  • Details: Conditions and Consents - Planning Report
  • DA Number: 167-7-2005-i
  • Date of Approval: 27th September 2005
  • Description: Remediation of Contaminated Land at 95 Bay Road, Waverton
  • Location: 95 Bay Road, Waverton
  • LGA: North Sydney
  • Capital Cost of Development: $220,000
  • Construction Jobs: 0.8
  • Details: Instrument of Consent
  • DA Number: 101-5-2005
  • Title: SUBDIVISION CERTIFICATE APPLICATION No. 06-09-2005: SITE –Honeysuckle Drive, Newcastle
  • Date of Approval: 27 September 2005
  • Description: Three lot Stratum subdivision.
  • Location: Lot 4 DP 883474 and Lot21 DP1051525, Lee Wharf, Honeysuckle Drive, Newcastle.
  • LGA: Newcastle
  • Details: Standard Certificate - Planning Report
  • DA Number: MOD 2-1-2004-i
  • Title: Use of Alternative Fuels at the New Berrima Cement Works
  • Date of Approval: 26 September 2005
  • Description: Use of alternative fuels in the cement making process at the Blue Circle Southern Cement Works in New Berrima.
  • Location: Taylor Avenue, New Berrima
  • LGA: Wingecarribee Shire Council
  • Details: Conditions - Planning Report Independent Advice
  • DA Number: not applicable
  • Title: Sandgate Rail Grade Separation
  • Date of Approval: 26 September 2005
  • Description: The proposal comprises two new coal lines to pass under a new flyover along the eastern side of the existing main lines to connect to existing coal lines leading to Kooragang Island. The proposed alignment of the new coal lines require extension of the Wallsend Road bridge and Sandgate Station footbridge, and relocation of a passenger shelter on Sandgate Station. Environmental enhancement works, streetscape enhancements in and around Astra Street and installing rail signalling facilities also form part of the proposal.
  • Location: The proposal is located at Sandgate between Newcastle and Maitland. Works associated with the proposal extend approximately two kilometres north and one kilometre south of Sandgate Railway Station and largely within the rail corridor.
  • LGA: Newcastle
  • Details: Instrument - Report
  • DA Number: Mod 96-7-2005
  • Title: Jimmys Beach Sand Nourishment Project
  • Date of Approval: 24 September 2005
  • Description: The proposed modification involves changing the method of extracting the sand from the Yacaaba Isthmus (from a scraper to a dredge/cutter) and transporting it to Jimmy’s Beach (from trucks using local roads to a temporary pipeline along the shore).
  • Location: Jimmy’s Beach and Yacaaba Isthmus on the northern side of Port Stephens
  • LGA: Great Lakes
  • Details: Notice of Modification - Consolidated Consent
  • DA Number: 272-11-2004
  • Title: Rural Residential Subdivision
  • Date of Approval: 23 September 2005
  • Description: Create One Additional Rural Consessional Lot.
  • Location: Lot 10 and Lot 11 DP 810369
    101 Millingandi Road, Pambula
  • LGA: Bega Valley
  • Details: Determination - Planning Report
  • DA Number: 199-8-2004
  • Title: Waiver to prepare master plan MP 24-12-2003
  • Date of Approval: 23 September 2005
  • Description: Subdivision into thirty eight (38) residential lots and a public reserve lot in two (2) stages
  • Location: Candlagan Drive Broulee Beach
    Part Lot 2 DP 1037342
  • LGA: Eurobodalla Shire Council
  • Details: Instrument of Consents - Planning Report
  • DA Number: 421-9-2003
  • Title: Construction of tourist apartments
  • Date of Refusal: 23 September 2005
  • Description: Demolish existing dwelling and construction of 8 tourist apartments and manager’s residence
  • Location: Lot 260 and 261 DP 755967, 18 & 20 Princess Highway, Ulladulla
  • LGA: Shoalhaven City Council
  • Details: Determination - Planning Report
  • DA Number: 54-3-2004
  • Title: 3 STOREY MIXED COMMERCIAL AND TOURIST FACILITY
  • Date of Approval: 23 September 2005
  • Description: COMPRISING THIRTY TWO RESIDENTIAL UNITS, FORTY SEVEN SERVICED APARTMENTS AND COMMERCIAL DEVELOPMENT
  • Location: Lot 1 & Lot 202 DP 743509 Meares Place, KIAMA NSW 2533
  • LGA: Kiama Municipal Council
  • Capital Cost of Development: $13 000 000.00
  • F/T Construction Jobs: 75
  • Details: Conditions - Planning Report
  • DA Number: DA No. 39-3-2005
  • Title: Building B 7- Additions and Modifications
  • Date of Approval: 23 September 2005
  • Description: Additional level and additions to the roof plant level containing 11 serviced apartments, new swimming pool, extension of the balconies on the south west corner of building and the basement car park and other minor modifications to approved building B7.
  • Location: Lot 4 DP 883474 and Part Lot 21 DP 1051525 Honeysuckle Drive, Newcastle
  • LGA: Newcastle City Council
  • Capital Cost of Development: $6,300,000
  • Details: Conditions - Planning Report
  • DA Number: 142-6-2004
  • Title: Four additional tourist units to the existing seven holiday units
  • Date of Approval: 23 September 2005
  • Description: Development described in Condition A1, Part A, Schedule 2
  • Location: Lot 5 DP 252782 and Lot 6 DP 758258 22 Camperdown Street, Coffs Harbour
  • LGA: Coffs Harbour City Council
  • Details: Conditions - Planning Report
  • DA Number: 108-5-2004
  • Title: Subdivision
  • Date of Approval: 23 September 2005
  • Description: Consolidation and Re-subdivision of 4 lots to 3
  • Location: Lot 1 DP 722686; Lot 11 DP 740282; Lot 23 DP 236679 and Lot 168 DP 753168 The Lakes Way, Pacific Palms
  • LGA: Great Lakes
  • Details: Determination - Planning Report
  • DA Number: 14-1-2005
  • Title: Two (2) Lot Residential Subdivision
  • Date of Refusal: 23 September 2005
  • Description: Two lot torrens title subdivision of a property located at 74 Old Princes Hwy, South Narooma. The Proposed lots have the following areas: Lot 201 - 5500 metres squared & Lot 202 - 3.8ha. Acess is via an 8 metre wide R.O.W from the Old Princes Hwy.
  • Location: No.74 Old Princes Highway, Narooma Lot 20 DP1068832
  • LGA: Eurobodalla
  • Details: Determination - Planning Report
  • DA Number: 13-1-2005
  • Title: Two (2) lot subdivision
  • Date of Approval: 23 September 2005
  • Description: Two (2) lot subdivision
  • Location: Lot 101 DP 776881, Lot 101 Grandfathers Gully Road, Lilly Pilly
  • LGA: Eurobodalla Shire Council
  • Details: Conditions - Planning Report
  • DA Number: 383-8-2003
  • Title: 2 lot subdivision.
  • Date of Refusal: 23 September 2005
  • Description: Two lot torrens subdivision of rural residential land
  • Location: Lot 560 George Bass Drive, Surf Beach
  • LGA: Eurobodalla
  • Details: Refusal Determination - Planning Report
  • DA Number: 224-09-2004
  • Title: Two (2) Lot Subdivision
  • Date of Approval: 23 September 2005
  • Description: Subdivision of existing land parcel into two lots
  • Location: Paines Road, Ashby - Lot 1121 DP 730289
  • LGA: Clarence Valley Council
  • Details: Conditions - Ministerial Submission - Planning Report
  • DA Number: 77-4-2005
  • Title: Demolition of timber wharf
  • Date of Approval: 23 September 2005
  • Description: Demolition of remaining timber wharf structures and piles 0-17 & 42-48 of Lee Wharf, Newcastle. The timber is proposed to be re-used where possible in the proposed Maritime Centre nearby.
  • Location: Lot 51 DP 1036132 Honeysuckle Drive, Newcastle
  • LGA: Newcastle
  • Capital Cost of Development: $100,000
  • Construction Jobs: 0.6
  • Details: Conditions - Planning Report
  • DA Number: 212-9-2004
  • Title: Demolition of existing jetties and construction of a new marina
  • Date of Approval: 23 September 2005
  • Description: (1) Demolition of the four (4) existing jetties; (2) The construction of finger wharves consisting of marina style concrete pontoons, comprising a 3 metre wide main walkway and three (3) x 2.4 metre wide fingers; and mooring piles, gangways and ramps, for up to seven (7) vessels; and (3) the relocation and use of the steel pontoon currently used by the vessel William the Fourth.
  • Location: Part Lot 51 DP 1036132, Merewether Street Finger Wharves, Newcastle
  • LGA: Newcastle
  • Capital Cost of Development: $738,000
  • Details: Instrument of Consent - Planning Report
  • DA Number: 22-2-2005
  • Title: Landscaping of public domain and reconstruction of seawall
  • Date of Approval: 23 September 2005
  • Description: Landscaping of the public domain between the newly developed Harbour Square to the east and the Lee Wharf Development’s site to the west and reconstruction of approximately 36 metres of seawall between Lee Wharf Shed A (Maritime Centre) and the lee Wharf Development’s site to the west.
  • Location: Lot 51 & 53 DP 1036132, Lot 7 DP 883474, Honeysuckle Drive, Newcastle
  • LGA: Newcastle
  • Capital Cost of Development: $850,000
  • Details: Conditions - Planning Report
  • DA Number: 28-2-2004
  • Title: Proposed Subdivision of Lot 6241 DP 865991 Fishermans Reach Road, Fishermans Reach
  • Date of Approval: 23 September 2005
  • Description: 3 Lot subdivision
  • Location: 424 Fishermans Reach Road, Fishermans Reach
  • LGA: Kempsey
  • Details: Instrument of Consent - Planning Report
  • DA Number: 147-6-2004
  • Title: Mixed use development
  • Date of Refusal: 23 September 2005
  • Description: Construction of a mixed use development containing tourist, retail, commercial & residential facilities together with associated signage.
  • Location: Lot 100 DP 1001026, 4 Museum Place, Batemans Bay
  • LGA: Eurobodalla
  • Capital Cost of Development: $13,000,000
  • Construction Jobs: 75
  • F/T Post Construction Jobs: 110
  • Details: Refusal - Planning Report
  • DA Number: 64-3-2005
  • Title: Four (4) lot subdivision
  • Date of Approval: 23 September 2005
  • Description: Four (4) lot subdivision and having frontage to Waterfront and Swan Bay Roads, Swan Bay. The construction of interallotment drainage in conjunction with minor filling, grading and levelling is proposed for part of the site.
  • Location: Lots 222 and 223 DP 862015 - 1B Waterfront Road, Swan Bay
  • LGA: Port Stephens
  • Details: Determination - Planning Report
  • DA Number: 465-11-2003
  • Title: Three (3) lot subdivision
  • Date of Refusal: 23 September 2005
  • Description: Three (3) lot subdivision
  • Location: Lot 4 DP 1005489
  • LGA: Great Lakes
  • Details: Refusal - Planning Report
  • DA Number: MOD No: 79-6-2005
    DA No: 157-6-2004
  • Title: Construction and partial fitout of a technology oriented campus style development comprising 2 four storey and 4 five storey buildings over a basement carpark with shared communal facilities including gymnasium, food service areas and child care centre.
  • Date of Approval: 22nd September 2005
  • Description: MOD 79-6-2005 seeks consent for works related to BCA and Australian Standards compliance and services coordination within the building, including changes to rooftop plant, egress, car and bicycle parking arrangements, redesign of loading dock at Core 2 and addition of mechanical exhausts and fire fighting equipment.
  • Location: 107 Epping Road, 1-11 Lyon Park Road, 25-37 Paul Street North & 16-20 Giffnock Avenue - North Ryde
  • LGA: Ryde
  • Capital Cost of Development: $243,268,600
  • Construction Jobs: 2200 new full time equivalent construction jobs.
  • F/T Post Construction Jobs: 1027 new full time equivalent operational jobs by 2009
  • Details: Conditions of Consent - Planning Report
  • DA Number: MOD No: 94-7-2005
    DA No: 157-6-2004
  • Title: Centre Court Development, North Ryde
  • Date of Approval: 20 September 2005
  • Description: Construction and partial fit out of a technology oriented campus style development comprising 2 four storey and 4 five storey buildings over a basement car park with shared communal facilities including gymnasium, food service areas and child care centre. MOD 94-7-2005 to modify DA 157-6-2004 in the following manner: Alterations to the interior fitout of approved Buildings A – F including internal partitioning specific to tenancy requirements.
  • Location: 1-11 Lyonpark Road, 25-37 Paul Street North, 107 Epping Road & 16-20 Giffnock Ave, North Ryde.
    Lot 51-52, DP 564301; Lot 1-2, DP455952; Lot C1, DP 377649; Lot 2, DP 655022; Lot 2, DP880284; Part of Lot 3, DP 563085.
  • LGA: Ryde
  • Capital Cost of Development: $203,116,600
  • Details: Determination and Schedules - Planning Report
  • DA Number: DA No: 255-10-2004-i
  • Title: Lysaght Manufacturing and Distribution Centre, Erskine Park
  • Date of Approval: 19 September 2005
  • Description: Construction and operation of a steel roll-forming and distribution centre in two stages, with a maximum final capacity of 65,000 tonnes per annum.
  • Location: Erskine Park Employment Area
  • LGA: Penrith
  • Capital Cost of Development: in excess of $55 million
  • Construction Jobs: 250 employees (80 new emloyees)
  • Details: Conditions of Consent - Planning Report
  • DA Number: MOD No: 91-7-2005
    DA No: 200-2004
  • Title: Increase of warehouse floor area, deletion of office, deletion and alteration of loading docks, deletion of on-site car parking, other minor changes.
  • Date of Approval: 19th September 2005
  • Description: Construction of a warehouse and ancillary office.
  • Location: Lot 206, DP 1030744; Part Lot 306, DP 1035614; & Lot 4081 DP 1064965 Batu Wargun Drive, Prospect
  • LGA: Holroyd
  • Capital Cost of Development: $24,000,000
  • Construction Jobs: 60
  • F/T Post Construction Jobs: 20
  • Details: Determination and Conditions
  • DA Number: MOD No: 56-4-2005
    DA No: 456-10-2003
  • Title: Mixed residential / commercial tourist accommodation development
  • Date of Approval: 19 September 2005
  • Description: Construction of three towers, two 15 stories and a 10 story building, with commercial and retail
  • Location: Cnr Wharf, Bay and Stuart Streets, Tweed Heads
  • LGA: Tweed Shire
  • Capital Cost of Development: $444,000,000.00
  • Details: Conditions of Conditions - Planning Report
  • DA Number: 296-12-2004
  • Title: Construction of a swimming pool, two spa pools and associated timber decking
  • Date of Approval: 16 September 2005
  • Description: Erection of a swimming pool, spa pools and modification of existing rooftop balustrade, including use of all structures and facilities above roof terrace
  • Location: No 15 Government Road, Nelson Bay
  • LGA: Port Stephens Council
  • Capital Cost of Development: $18,000
  • Details: Determination - Planning Report
  • DA Number: 298-12-2004
  • Title: Subdivision
  • Date of Approval: 16 September 2005
  • Description: Two (2) lot rural residential subdivision
  • Location: Lot 6 DP 557758, 309 Old Coast Road, Korora
  • LGA: Coffs Harbour
  • Details: Determination and Conditions - Planning Report
  • DA Number: 162-7-2004
  • Title: Subdivision
  • Date of Approval: 16 September 2005
  • Description: Three(3) lot subdivision
  • Location: Lot 230 DP 869652, 67 Nutley’s Creek Road, Bermagui
  • LGA: Bega Valley Shire Council
  • Details: Determination and Conditions - Planning Report
  • DA Number: 144-6-2004
  • Title: Three (3) lot subdivision
  • Date of Approval: 16 September 2005
  • Description: Three (3) lot rural residential subdivision, comprising non-reticulated sewerage systems.
  • Location: Lot A DP 381203
  • LGA: Coffs Harbour
  • Details: Conditions - Planning Report
  • DA Number: MOD No: MOD 61-4-2005
    DA No: DA 147-4-2003
  • Title: Construction of warehouse buildings, offices, associated structures, parking, landscaping and associated site works. Use of the site and buildings for warehousing, storage and freight forwarding as a distribution hub.
  • Date of Approval: 16th September 2005
  • Description: MOD 61-4-2005 to modify DA 147-4-2003 the following manner:
  • amend condition 1 regarding approved documentation, including plans;
  • delete condition 8 of DA 147-4-2003; and
  • insert new condition 29(d) regarding the installation of safety signage for pedestrians.
  • Location: Lot 502 Picrite Close, Greystanes
  • LGA: Holroyd City Council
  • Details: Conditions - Planning Report
  • DA Number: MOD No: 81-6-2005
    DA No: 71-2-2003
  • Title: MOD 81-6-2005 modifying DA 71-2-2003
  • Date of Approval: 16th September 2005
  • Description: Addition of tenancy sign to building 5 and flagpole to car park.
  • Location: Building 5/1 Foundation Place, Prospect NSW 2148
  • LGA: Holroyd
  • Details: Planning Report
  • DA Number: MOD No: 84-6-2005
    DA No: 477-11-2003
  • Title: Modification of Condition H3 of DA 477-11-2003
  • Date of Approval: 16 September 2005
  • Description: MOD 84-6-2005 seeks to modify Condition H3. Condition H3, which is a general term of approval issued by the NSW Rural Fire Service, requires the development to be constructed in accordance with Australian Standard AS 3959-1999 Level 1 – Construction of buildings in bushfire prone areas.
  • Location: Lot 172 DP 1075495 Bells Boulevarde, South Kingscliff
  • LGA: Tweed
  • Capital Cost of Development: $35,000,000
  • Details: Notice of Determination - Planning Report
  • DA Number: MOD No: 24-2-2005
    DA No: 524-12-2003
  • Title: Alterations and additions to existing motel
  • Date of Approval: 16 September 2005
  • Description: Alterations and additions to an existing motel: Addition of 7 guest rooms, excavation for basement car parking, new day spa facility, offices and whale watching room
  • Location: Lot 27 DP 224117, 191 Mitchell Parade, Mollymook
  • LGA: Shoalhaven City Council
  • Capital Cost of Development: $1,000,000
  • Details: Consent - Planning Report
  • DA Number: 131-6-2004
  • Title: Six (6) Lot Rural Residential Subdivision
  • Date of Approval: 16th September 2005
  • Description: Six (6) lot subdivision of Lot 1 DP 419284 and Lot 1
  • Location: Lot 1 DP 419284 and Lot 1 DP 661408 Old Coast Road, Korora
  • LGA: Coffs Harbour City Council
  • Details: Conditions - Planning Report - Ministerial Submission
  • MOD No: 54-4-2005 DA No: 398-11-2002
  • Title: Vacation Club – Trendwest Resorts
  • Approved: 16 September 2005
  • Description: Amendments to conditions (DA 398-11-2002)
  • Location: Lot 3 DP 1052296, Bay Drive, Coffs Harbour
  • LGA: Coffs Harbour
  • Capital cost of development: $11,200,000
  • Details: Instrument of Consent - Planning Report
  • DA Number: MOD No: 90-7-2005
    DA No: 157-6-2004
  • Title: MOD 90-7-2005 to modify DA 157-6-2004
  • Date of Approval: 16 September 2005
  • Description: Works and general changes to the approved loading dock areas, garbage room and generator rooms to meet tenancy requirements, including the addition of waste / recycling room and basement bin storage areas, and changes to loading dock at Core 2 to facilitate access to waste / recycling room.
  • Location: 107 Epping Road, 1-11 Lyon Park Road, 25-37 Paul Street North, 16-20 Giffnock Avenue, North Ryde
  • LGA: Ryde
  • Capital Cost of Development: $203,116,600.00
  • Details: Determination and Conditions
  • DA Number: 317-12-2004
  • Title: Strata Subdivision
  • Date of Approval: 15 September 2005
  • Description: Strata Subdivision of existing resort (Wombat Beach Resort) into 28 strata titled holiday units and 1 commercial unit.
  • Location: Lot 1 DP 787559, 30-34 Pacific Street, Crescent Head
  • LGA: Kempsey
  • Details: Conditions of Conditions - Planning Report
  • DA Number: DA-285-11-2004-i
  • Title: Warehouse and Distribution Centre
  • Date of Approval: 12 September 2005
  • Description: An application was made by Walker Corporation Pty Limited for the construction of a warehouse and distribution centre at 48 Common Street, Goulburn. The facility is to be occupied by Coles Myer Limited for the purposes of receiveing, storing and supplying retail outlets with predominantly supermarket products as part of its Food and Liquor Supply Chain.
  • LGA: Goulburn Mulwaree
  • Capital Cost of Development: $45 million
  • Construction Jobs: up to 100 during construction and approximately 300 during operation
  • Details: Conditions of Consent
  • DA Number: MOD No: 67-5-2005
    DA No: 175-4-2003
  • Title: Subdivision of Lot 54 into 58 Lots and civil works
  • Date of Approval: 8 September 2005
  • Description: MOD 67-5-2005 to modify DA 175-4-2003 in the following manner:
    Amending condition A2 – Development in Accordance with Plans - to allow deletion of pathway from approved plans
  • Location: Lot 54, Casuarina Way, Kingscliff South, 2487
  • LGA: Tweed Shire Council
  • Details: Instrument of Consent - Planning Report
  • DA Number: MOD No: 118-8-2005
    DA No: 446-10-2003
  • Title: Construction of new primary school
  • Date of Approval: 2nd September 2005
  • Description: Construction of a primary school on Lot 1 DP 701512 which consists of:
    a crescent-shaped classroom building of 2 to 3 useable storeys incorporating 24 classrooms with ancillary music, computer, special education room, libraries, staff rooms and the like;
    a central assembly hall;
    on-site car parking for 83 vehicles;
    a pick-up facility in a ‘shareway’ on site with a 60 car space capacity;
    landscaping of the playgrounds, car park, shareway and property boundaries;
    site boundary fencing;
    a stormwater absorption area in the south east of the site which will also provide for bushland regeneration; security fencing, kiosk, gates, closed circuit television video;
    creation of a buffer area of approximately 880 square metres as identified on the site plan, for conservation purposes.
  • Location: Lot 1 DP 701512, Corner York and Queens Park Roads, Queens Park 2022
  • LGA: Waverley Council
  • Capital Cost of Development: $7,858,100
  • Details: Determination and Schedules - Planning Report
  • DA Number: MOD No: 119-8-2005
    DA No: 205-8-2004
  • Title: Moriah College, Queens Park
  • Date of Approval: 2nd September 2005
  • Description: Creation of additional storage space, new covered loading dock and link and relocation of the vehicle ramp at the rear of the existing building.
  • Location: Lot 1 DP 701512, Cnr York & Queens Park Roads, Queens Park
  • LGA: Waverley Council
  • Capital Cost of Development: $400,000.00
  • Details: Determination of Conditions - Planning Report
  • MOD No: 95-7-2005, DA No: 80-4-2004
  • Title: Construction of three retail/commercial office buildings, subdivision of land into 4 separate parcels, associated basement parking, basement public car parking, wind turbine zones, landscaping and public improvement works.
  • Approved: 26 August 2005
  • Description: MOD 95-7-2005 to modify 80-4-2004 in the following manner: Amend condition A1 - changes to allocation of floor space and clarification of use; Amend condition A2 - changes to building 5; Omit condition B13 and insert new condition B13 regarding change to car parking provision; Omit condition B21 and insert new condition B21 regarding change to monetary contributions; Omit condition G5 and insert new condition G5 to clarify operating hours.
  • Location: Sites 5, 6 and 7 Dawn Fraser Avenue, Sydney Olympic Park
  • LGA: Auburn
  • Capital cost of development: $60,000,000
  • Details: Planning report , Notice of determination
  • DA Number: DA 98/01173 (Maitland council) & DA118/698/2 (Cessnock council)-MOD-1
  • Title: Donaldson Mine-MOD-1
  • Date of Approval: 26 August 2005
  • Description: Extension of open cut mining operations at the Donsaldson open cut coal mine, near Beresfield. The mining extension area covers about 7 hectares to the west of approved mining operations. Mining in the extension area would recover about an additional 650,000 tonnes of coal and extend the life of the mine by about 4 months.
  • Location: Near Bersfield, to the west of Newcastle.
  • Capital Cost of Development: No additional capital required.
  • Details: Consolidated Consent - Assessment Report - Notice of Modification
  • DA Number: 131-5-2005
  • Title: Chatswood Transport Precinct Project
  • Date of Approval: 22nd August 2005
  • Description: Erection of three residential flat buildings, retail development associated with the Chatswood railway station concourse and bus interchange, basement car parking, site landscaping, public domain works and stratum subdivision of the site.
  • Location: Land generally bounded by Albert Avenue, Thomas Lane, Railway Street and Help Street and including the first floor of the Sydney Water Building and land up to, but not including 430 Victoria Avenue, Chatswood
    Title Details
    Lot No 24 in DP819522
    Lot No 23 in DP819522
    Lot No 22in DP819522
    Lot No 1 in DP590323
    Book 394 No276
    Lot No 1 in DP321820
    GC 19/1/1945 FOL. 50
    GC 8/7/1887 FOL. 4443
    GC 9/7/1926 FOL. 4585
    Lot No 14 in DP817116
    Lot No 61 in DP864346
    Lot No 62 in DP864346
    AC 8634-243 consisting of
    Lot No 15 in DP817116
    Lot No 20 in DP790323
    Lot No 21 in DP790323
    Lot No 1 in DP1080387
    Lot No 2 in DP1080387
    Orchard Road Air Space
    Victoria Road Air Space 1
    Victoria Road Air Space 2
  • LGA: Willoughby City Council
  • Capital Cost of Development: $164,819,000.00
  • Details: Conditions - Planning Report
  • DA Number: MOD No: 53-4-2005
    DA No: 91-3-2000
  • Title: Application to Modify Development Consent 91-3-2000
  • Date of Approval: 19th August 2005
  • Description: Modifications to Marina Finger B
  • Location: 91 Hannnell Street, Wickham
  • LGA: Newcastle
  • Details: Instrument of Consent - Planning Report
  • DA Number: 85-4-2005-i
  • Title: Upgrade to Cement Milling Capacity at New Berrima
  • Date of Approval: 16th August 2005
  • Description: Construction and operation of a new cement mill (Cement Mill 7) at the Blue Circle Southern Cement Works at New Berrima.
  • Location: Taylor Avenue, New Berrima
    Lot 1 DP58227
    Lot 2 DP774598
    Lot 22 DP582276
    Lot 100 DP882139
  • LGA: Wingecarribee Shire Council
  • Capital Cost of Development: $25,500,000.00
  • Details: Instrument of Consent
  • DA Number: DA-134-3-2003-i
  • Title: Dredging and Remediation of the Hunter River
  • Date of Approval: 9 August, 2005
  • Description: Extension of shipping channels within the Port of Newcastle, including dredging, excavation, treatment and disposal of sediments from the south arm of the Hunter River
  • Location: Lot 20 DP262325, Lot 36 DP775776, Lots 1, 6 and 7 DP1015754, Lot 122 DP874949, Lot 222 DP1013964, Lot 3 DP1032755; (Mayfield, Hunter River and Kooragang Island)
  • LGA: Newcastle
  • Details: Instrument of Consent; Assessment Report
  • Notices issued before August 2005

    Craig Knowles MP, Minister for Infrastructure and Planning and Minister for Natural Resources has determined the following major development proposals:

  • DA Number: MOD No: 83-6-2005
    DA No: 388-8-2003
  • Title: Residential development including commercial and retail tenancies
  • Date of Approval: 22nd August 2005
  • Description: Mixed use development comprising residential apartments, retail shops, and child care centre.
  • Location: 2-4 Walker Street, Rhodes; Lot 22 in DP624240
  • LGA: Canada Bay
  • Capital Cost of Development: $15,700,000
  • Details: Conditions - Planning Report
  • DA Number: MOD No: 85-6-2005
    DA No: 427-9-2005
  • Title: Modification Application 85-6-2005 – Part Lot 7, DP 1047108, 1 Mary Street, Rhodes – Modify Conditions B1(3) and E9(1) of Original DA 427-9-2003
  • Date of Approval: 17th August 2005
  • Description: Modify Conditions B1(3) and E9(1) of Original DA 427-9-2003
  • Location: Part Lot 7 DP 1047108, 1 Mary Street, Rhodes
  • LGA: Canada Bay
  • Details: Instrument and Conditions - Planning Report
  • DA Number: Modification to DA No. 450-10-2003
  • Title: Hunter Valley Operations – Upgrading of the Hunter Valley Load Point
  • Date of Approval: 16 August 2005
  • Description: Modification of the Hunter Valley Operations development consent to increase maximum throughput capacity at the Hunter Valley Load Point
  • Location: Approximately 20 kilometres north of Singleton in the Upper Hunter Valley
  • LGA: Muswellbrook
  • Details: Consolidated consent
  • DA Number: DA-134-3-2003-i
  • Title: Dredging and remediation of the South Arm of the Hunter River
  • Date of Approval: 9 August 2005
  • Description: Extension of shipping channels with the Port of Newcastle, including dredging, excavation, treatment and disposal of sediments from the South Arm of the Hunter River
  • Location: Lot 20 DP 262325, Lot 36 DP 775776, Lots 1, 6 and 7 DP 1015754, Lot 122 DP 874949, Lot 222 1013964, Lot 3 DP 1032755
  • LGA: Newcastle
  • Details: Instrument of Consent - Assessment Report
  • DA Number: DA-318-12-2004-i
  • Title: Allied Mills Flour and Grain Mill, Maldon
  • Date of Approval: 9 August 2005
  • Description: The development involves the construction and operation of a flour and maize mill with a productsion capacity of up to 300,000 tonnes per annum. The development includes a rail spur and unloading facilities, a site access road connecting to Picton Road, and ancillary componenets such as offices, car parking a laboratory, and a sewage treatment plant. The mill would operate 24 hours per day, 7 days per week, however with reduced actvities during the night time.
  • Location: The site is located at 330 Picton Road, between Picton Road and the Main Southern Railway line.
  • Capital Cost of Development: $75 million
  • F/T Construction Jobs: 27 full-time equivalent positions during operation and up to 200 during construction
  • Details: Assessment Report - Development Consent
  • MOD No:86-6-2005 (DA 358-7-2003)
  • Title: MOD 86-6-2005 modifying DA 358-7-2003
  • Approved: 8 August 2005
  • Description: Modification to entry doors, addition of sliding door to southern elevation and reconfiguration of doors and glazing of northern elevation
  • Location: Tenancy 21, Boardwalk East, 1 Honeysuckle Drive, Newcastle
  • LGA: Newcastle
  • Capital Cost of Development: $ 20,000
  • Details: Instrument and Conditions - Planning Report
  • DA Number: 485-12-2002
  • Title: Lot 5 DP 788159 Nadine Street, Sanctuary Point – Create 39 residential allotments and open space for stormwater drainage control as well as for residential use
  • Approved: 3rd August 2005
  • LGA: Shoalhaven
  • Details: Conditions of Consent - Planning Report
  • DA Number: MP 4-12-2002, for DA 464-12-2002
  • Title: George Bass Dr Rosedale
  • Date of Refusal: 2/8/05
  • Description: 445 lot residential subdivision
  • Location: Rosedale Subdivision
  • LGA: EUROBODALLA
  • Details: Submission - Planning Report
  • DA Number: 209-9-2004
  • Title: Refurbishment of existing cycleway and pedestrian path
  • Date of Approval: 2nd August 2005
  • Description: Refurbishment of existing cycleway and pedestrian path between Mary Street and Homebush Bay Drive, Rhodes subject to SREP 29
  • Location: 1 Mary Street, Rhodes – Part lot 21 and lot 22 DP 1049524 and lots 61 & 62 DP 1048445
  • LGA: Canada Bay Council
  • Capital Cost of Development: $300,000
  • Details: Conditions of Consent - Instrument of Consent - Planning Report
  • DA Number: DA-10-1-2005
  • Title: Ardmore Park Quarry
  • Refused: 2 August 2005
  • Description: Sand and Basalt Quarry
  • Location: Lot 24 DP 1001312 Oallen Ford Road, Bungonia
  • LGA: Goulburn Mulwaree
  • Capital Cost of Development: $ 20,000
  • Details: Instrument of Refusal - Assessment Report
  • DA Number: 378-8-2003
  • Title: 4 lot residential subdivision
  • Approved: 2nd August 2005
  • Description: 4 lot residential subidivision within coastal zone connecting to non-reticulated sewage system
  • Location: Lot 34 DP 1042500, Upper Warrell Creek Rd, Macksville
  • LGA: Nambucca Shire Council
  • Details: Conditions - Planning Report
  • DA Number: DA No. 52-03-99
  • Title: Ravensworth East – Administrative modification to development consent.
  • Approved: 2 August 2005
  • Description: Administrative changes to Ravensworth East development consent to mirror Mt Owen development consent.
  • Location: Approximately 25 kilometres northwest of Singleton in the Upper Hunter Valley.
  • LGA: Singleton
  • Details: Consolidated Conditions of Consent
  • DA Number: MOD No: 48-3-2005
    DA No: 126-5-2004
  • Title: Modification to DA 126-5-2004
  • Date of Approval: 1 August 2005
  • Description: MOD 48-03-2005 to modify DA 126-05-2004 in the following manner:
    extend terrace areas for 2 apartments of the Merriwa St building and 2 apartments of the McIntyre St building
    replan some cross-through apartments
    additional 14 extra resident car parking spaces in the McIntyre St building
    amend the design of the private garden areas (fronting Merriwa St) of 8 apartments
    amend the approved unit mix
    other minor changes to the approved design and
    increase the total floor space from 14,837m2 to 14, 867m2
  • Location: Lot 1 DP924841, Lot 1 DP963395, Lot 2 DP963202, Lot F DP166390, Lots 1 to 5 DP11852, Lot 47 DP656332 at 4-14 Merriwa Street and 3-11 McIntyre Street, Gordon
  • LGA: Ku-ring-gai
  • Details: Conditions - Planning Report
  • DA Number: DA No. 135/90
  • Title: Narama Coal Mine – Transfer of mine water
  • Approved: 1 August 2005
  • Description: Transfer of mine water from Narama to Cumnock No.1 Colliery.
  • Location: Approximately 20 kilometres north of Singleton in the Upper Hunter Valley.
  • LGA: Singleton
  • Details: Notice of Modification
  • DA Number: 101-5-2005
  • Title: Three Lot Stratum Subdivision at Lot 4 DP 883474 & Lot 21 DP 1051525 Lee Wharf, Honeysuckle Drive, Newcastle
  • Approved: 29th July 2005
  • LGA: Newcastle
  • Details: Condtions - Planning Report - Ministerial Submission
  • DA Number: 12-1-2005
  • Title: Boundary Adjustment & Erection of a New Dwelling at Lot 12 & 13 DP 579733, Princes Highway, Kiama Heights
  • Approved: 28th July 2005
  • Description: Boundary Adjustment & Erection of a New Dwelling
  • Location: Lot 12 & 13 DP 579733, Princes Highway, Kiama Heights
  • LGA: Kiama
  • Capital Cost of Development: $1,400,000.00
  • DA Number: 412-9-2003
  • Title: Subdivision
  • Refusal: 27 July 2005
  • Description: Subdivision of one lot into two
  • Location: Lot 10/Sec 3/DP10915, No. 1 The Point, Bundabah
  • LGA: Great Lakes Council
  • Details: Refusal - Planning Report
  • DA Number: MOD No: 92-7-2005
    DA No: 146-6-2004
  • Title: Replanning of pedestrian Link Ramp and Visitor parking Area and Other Minor Changes at 9-25 Tryon Road, Lindfield
  • Approved: 26th July 2005
  • Location: 9-25 Tryon Road, Lindfield
  • LGA: Ku-Ring-Gai
  • Details: Determination - Planning Report
  • DA Number: 81-4-2004
  • Title: Mixed Commercial and Residential Development
  • Date of Approval: 25th July 2005
  • Description: Development described in Condition A1, Part A, Schedule 2
  • Location: Lot 1 DP511513, Lot 1 DP433839, Lots 1 and 3 DP219637
    At 50-70 Mann St., and 114-116 Georgiana Terrace, Gosford
  • LGA: Gosford
  • Capital Cost of Development: $64,800,000
  • F/T Construction Jobs: 200
  • F/T Post Construction Jobs: 75
  • Details: Conditions - Planning Report
  • DA Number: 2-1-2005-i
  • Title: Remediation of Rheem Site, Rydalmere
  • Approved: 25 July 2005
  • Description: Remediation of approximately 29,000m3 of soil contaminated with hydrocarbons and asbestos.
  • Location: 1 Alan Street, Rydalmere
  • LGA: Parramatta
  • Capital Cost of Development: $3,000,000.00
  • F/T Construction Jobs: 18.75
  • Details: Instrument of Consent
  • DA Number: 173-7-2004
  • Title: Tourist Facility at 40 Dogwood Road, Bungwahl
  • Approved: 19th July 2005
  • Description: Tourist facility (see Condition A1, Part A, Schedule 2 for full description)
  • Location: Lot 1 DP 34367
  • LGA: Great Lakes
  • Capital Cost of Development: $225,000.00
  • Details: Instrument of Consent - Assessment Report
  • DA Number: 281-11-2004
  • Title: 3 Lot Subdivision at 20-28 River Street, Broadwater
  • Date of Withdrawal: 19th July 2005
  • Description: three lot subdivision
  • Location: 20-28 River Street, Broadwater
  • LGA: Richmond Valley
  • DA Number: 47-3-2005
  • Title: Fitout & Use of Tenancy Buidling 207 Fox Studios, Moore Park as Bowling Alley
  • Approved: 13th July 2005
  • Location: Lot 52, DP 1041134 Building 207 Fox Studios Moore Park
  • LGA: City of Sydney
  • Capital Cost of Development: 1,240,000
  • Details: Planning Report - Determination and Schedule
  • DA Number: 214-9-2004
  • Title: Newcastle
  • Approved: 8 July 2005
  • Description: use of former railway workshop buildings B & C for the holding of short term cultural, entertainment or conference functions or events
  • LGA: Newcastle
  • Details: Planning Report - Conditions
  • DA Number: 290-11-2004 refused
  • Title: Millingandi
  • Approved: 8 July 2005
  • Description: 14 lot subdivision
  • LGA: Bega Valley
  • Details: Planning Report - Application for Waiver
  • DA Number: MOD 52-4-2005 (modifying DA 290-6-2003)
  • Title: Amendment of condition 27
  • Approved: 8 July 2005
  • Description: Three storey mixed use development incorporating 10 serviced apartments, 8 permanent residential units, ground floor retail and associated car parking.
  • Location: Lot 9 DP565578, 124 Terralong Street, Kiama
  • LGA: Kiama
  • Capital Cost of Development: $ 3,000,000
  • F/T Construction Jobs: 16 full time equivalent jobs
  • Details: Determination
  • DA Number: Mod No. 70-5-2005
    DA No: 71-2-2003
  • Approved: 8th July 2005
  • Location: Unit 4/1 Foundation Place, Prospect
  • LGA: Holroyd
  • Capital Cost of Development: $10,000
  • F/T Construction Jobs: 0.02
  • Details: Planning Report - Determination
  • DA Number: 506-12-2003
  • Title: Multi Unit Housing Development
  • Date of Approval: 7 July 2005
  • Description: Demolition of the existing dwellings at 2, 4, 8, 10 and 12 Avon Road and 5A Pymble Avenue. 1-103 dwelling units (5 x 1 bedroom, 55 x 2 bedroom, 43 x 3 bedroom) in four buildings. 4 basement levels providing a total 202 car spaces (including 21 visitor and 20 disabled spaces), bicycle and motorcycle parking, separate residential storage enclosures, garbage storage facilities and plant rooms. Recreational facilities including a lap pool and gymnasium. Landscaping comprising landscaped deck and garden and landscaped perimeter zones to all buildings.
  • Location: 2-12 Avon Road & 3 and 5a Pymble Avenue, Pymble Lot 11, DP 546480; Lot 3, DP 537543; Lot 3, DP 314935; Lot C, DP 370199; Lot 1, DP 1006499; Lot 1, DP 660932; Lot 12, DP 546480; Lot 7, DP 5448
  • LGA: Willoughby Council
  • Capital Cost of Development: $28,000,000
  • Details: Determination and Conditions - Planning Report
  • DA Number: MOD No: 91-9-2004
    DA No: 477-11-2003
  • Approved: 7th July 2005
  • Description: Amendments to Consent Conditions
  • Location: ‘Salt’ Casuarina Way, South Kingscliff
  • LGA: Tweed
  • Details: Instrument of Consent - Planning Report
  • DA Number: 130-6-2004
  • Title: Maclean
  • Approved: 7 July 2005
  • Description: 2 lot subdivision
  • Location: Maclean
  • LGA: Clarence Valley
  • Details: Planning Report - Conditions
  • DA Number: 22-11-2003
  • Title: 51 lot subdivision
  • Date of Refusal: 5 July 2005
  • Description: 51 lot subdivision comprising coffee shop / convenience store, beach houses, residential building lots and townhouse development lot on 45 Hearns Lake Road, Woolgoolga
  • Location: Lot 21 DP 714858, 45 Hearns Lake Road, Woolgoolga
  • LGA: Coffs Harbour City Council
  • Details: Refusal - Planning Report
  • DA Number: Draft Master Plan 20-6-2004
  • Title: 91 lot residential subdivision plus open space lot at Lot 4, DP 612977
  • Date of Refusal: 5 July 2005
  • Description: 91 lot residential subdivision
  • Location: No 1 Hearns Lake Road, Woolgoolga Lot 4, DP 612977
  • LGA: Coffs Harbour City Council
  • Capital Cost of Development: 3.5 million
  • Details: Refusal - Ministerial Submission - Planning Report
  • DA Number: DA No. 8-1-2005
  • Title: Whitehaven Coal Mine - Canyon Extension
  • Approved: 30 June 2005
  • Description: Extension of open cut mining and relocating associated infrastructure
  • Location: Approximately 30 kilometres north west of Gunnedah, off Hoad’s Lane to the north of the Blue Vale Road intersection
  • LGA: Narrabri and Gunnedah
  • Details: Conditions of Consent - Assessment Report
  • DA Number: DA-308-12-2004-i
  • Title: Coca-Cola Warehousing and Distribution Centre (Minchinbury)
  • Date of Approval: 30 June 2005
  • Description: The development involves the construction and operation of a major storage and distribution centre for Coca-Cola products, at Minchinbury. The facility itself would have a gross floor area of almost 50,000 square metres and would operate 24 hours per day, 7 days per week. The development includes subdivision to create the lot for the distribution centre, to provide an access road and service corridor and to create a riparian zone around Reedy Creek.
  • Location: The site is located immediately to the west of Wallgrove Road and south of Reedy Creek.
  • LGA: Blacktown
  • Capital Cost of Development: $75.5 million
  • F/T Construction Jobs: 300 full-time equivalent positions during operation and up to 150 during construction
  • Details: Assessment Report - Development Consent
  • DA Number: 289-11-2004
  • Title:  
  • Approved: 30th June 2005
  • Description: Mobile Phone Base Station
  • Location: 50 Marine Drive, Fingal Bay
  • LGA: Port Stephens
  • Capital Cost of Development: $250 000
  • F/T Construction Jobs: 0.08
  • Details: Final Conditions - Instrument of Consent - Planning report
  • DA Number: 3-1-2005
  • Title: Two Lot Subdivision at 34 Cove Boulevrd, North Arm Cove
  • Date of Refusal: 30th June 2005
  • Description: Two Lot Subdivision of Lot 470 DP 9939
  • Location: Lot 470 DP 9939, 34 Cove Boulevard, North Arm Cove
  • LGA: Great Lakes
  • Details: Refusal - Planning Report - Ministerial submission
  • DA Number: 270-11-2004
  • Title: Proposed Telecommunications Tower at Mungo Brush Road, Hawks Nest
  • Date of Refusal: 30th June 2005
  • Description: Telecommunications Tower
  • Location: Lot 1 DP 616110 Sewerage Treatment Plant, Mungo brush Road, Hawks Nest
  • LGA: Great Lakes
  • Capital Cost of Development: $203,575
  • Details: Refusal - Planning Report
  • DA Number: 309-12-2004
  • Title: 4 Additional Cabins at Forster Beach Caravan Park, Cnr Oyster Parade & Dolphin Drive, Forster
  • Approved: 30th June 2005
  • Location: Forster Beach Caravan Park, Cnr Oyster Parade & Dolphin Drive, Forster.
  • LGA: Great Lakes
  • Capital Cost of Development: $450,000.00
  • Details: Planning Report - Determination and Conditions
  • DA Number: 99-4-2004
  • Title: two lot rural residential subdivision at Lot 3 DP 612024 Off Spalding Road, Macksville
  • Approved: 30 June 2005
  • Description: lot rural residential subdivision
  • Location: Lot 3 DP 612024 Off Spalding Road, Macksville
  • LGA: Nambucca
  • Details: Conditions - Planning Report - Ministerial Submission
  • DA Number: da-301-12-2004-i
  • Title: Warehouse and Distribution Centre
  • Approved: 30 June 2005
  • Description: An application was made by Australand Holdings Limited for the subdivision of Lot 1 DP 195454 into two lots and for the construction of a warehouse and distribution centre on part of that lot (212 Hume Street (Ducks Lane), Goulburn). The facility is to be occupied by Coles Myer Limited for the purposes of receiveing, storing and supplying retail outlets with predominantly supermarket products as part of its Food and Liquor Supply Chain.
  • LGA: Goulburn Mulwaree
  • Capital Cost of Development: $30 million
  • F/T Construction Jobs: approximately 300 during operation
  • Details: Instrument of Consent
  • DA Number: 72-4-2005-i
  • Title: Coles Myer Regional Distribution Centre, 212 Hume Street, Goulburn
  • Approved: 30 June 2005
  • Description: Warehousing and Distribution Centre for Coles Myer's food and liquor products associated with Coles Myer's chain of retail outlets.
  • Location: 212 Hume Street, Goulburn
  • LGA: Goulburn Mulwaree
  • Capital Cost of Development: $45 million
  • F/T Construction Jobs: 80-100
  • F/T Post Construction Jobs: 271
  • Details: Instrument of Consent
  • DA Number: DA-283-11-2004-i
  • Title: Coles Myer - National Distribution Centre (Minchinbury)
  • Approved: 30 June 2005
  • Description: The construction and operation of a Coles Myer National Distribution Centre at Minchinbury. The proposal involves the construction and operation of a major storage and distribution centre for food and liquor products associated with the Coles Myer Limited (CML) chain of retail outlets. The facility itself would have a gross floor area of 66,565m2. It would operate 24 hours per day, 7 days per week. The proposal includes the subdivision of the existing three lots to create a public road, an allotment for the proposed facility, an allotment for future expansion of the facility and residue lots for future development.
  • LGA: Blacktown
  • Capital Cost of Development: $70 million
  • F/T Construction Jobs: 483 full-time equivalent positions during construction
  • Details: Assessment Report - Consent Conditions
  • DA Number: 41-3-2005
  • Title: Demolition of existing dwelling and construction of new two storey dwelling at 4 Markham Close, Mosman
  • Approved: 30th June 2005
  • LGA: Mosman
  • Capital Cost of Development: $950,000
  • Details: Planning Report - Conditions
  • DA Number: 15-1-2005
  • Title: Telecommunications Facility at 619-621 Old Princes Highway, Narooma Road, CORUNNA
  • Approved: 30th June 2005
  • Description: Telecommunications Facility
  • Location: 619-621 Old Princes Highway, Narooma Road, CORUNNA
  • LGA: Eurobodalla
  • Capital Cost of Development: $125,000
  • Details: Planning Report - Conditions
  • DA Number: DA-284-11-2004-i
  • Title: Coles Myer - National Distribution Centre (Minchinbury)
  • Approved: 30 June 2005
  • Description: The construction and operation of a Coles Myer National Distribution Centre at Minchinbury. The proposal involves the construction and operation of a major storage and distribution centre for food and liquor products associated with the Coles Myer Limited (CML) chain of retail outlets. The warehouse and distribution centre is to be located at 562 Mamre Road, Erskine Park, in the Penrith local government area. The centre is to be used by Coles Myer Ltd as a National Distribution Centre for the purpose of receiving, storing and supplying retail outlets with predominately supermarket products as part of its Food and Liquor Supply Chain.
  • LGA: Penrith
  • Capital Cost of Development: min excess of $60 million
  • F/T Construction Jobs: 480 jobs during operation and 150 jobs during construction
  • DA Number: MOD 18-2-2005, for DA 512-12-2003
  • Title: Modification to building envelopey
  • Approved: 30/6/05
  • Description: Modification to building envelope
  • Location: 161 Golf Links Rd MACLEAN
  • LGA: Clarence valley
  • Details: Ministerial Submission - Planning Report - Conditions
  • DA Number: DA No. 195-8-2004
  • Title: Expansion of Dunmore Lakes Sand Extraction Project
  • Approved: 29 June 2005
  • Description: Expansion of Dunmore Lakes Sand Extraction Project (Stages 2, 3 and 4)
  • Location: Western side of the Princes Highway, approximately 3 kilometres south-southwest of Shellharbour and 7 kilometres north of Kiama
  • LGA: Shellharbour
  • Details: Conditions of Consent - Assessment Report
  • DA Number: 250-10-2004-i
  • Title: Augmentation of the Goulburn Sewerage Scheme
  • Approved: 23/6/05
  • Description: expansion of land under effluent irrigation from 199ha to 334ha, construction of irrigation infrastructure, increase in wet weather storage capacity at Gorman Road from 750 Megalitres to 900 Megalitres, installation of a UV disinfection system, provision for a precautionary discharge and construction of a sedimentation pond.
  • Location: Goulburn
  • LGA: Goulburn Mulwaree
  • Capital Cost of Development: $11.5M
  • Details: Instrument of Consent - Assessment Report
  • DA Number: 86/2889
  • Title: Camberwell Coal Mine - Upgrade of Coal Handling and Preparation Plant
  • Approved: 23 June 2005
  • Description: The modification involves upgrading the production capacity of the Camberwell coal handling and preparation plant from 6.5 to 7.8 million tonnes of run of mine coal a year.
  • Location: Camberwell Coal Mine, 10 km north-west of Singleton
  • LGA: Singleton
  • Details: Assessment Report - Consolidated Conditions of Consent
  • DA Number: DA 299-12-2004
  • Title: 2 Lot Subdivision at Lot 23 DP 1072217 Honeysuckle Drive, Newcastle
  • Approved: 22nd June 2005
  • Description: 2 Lot Subdivision
  • Location: Lot 23 DP 1072217 Honeysuckle Drive, Newcastle
  • LGA: Newcastle
  • Capital Cost of Development: Nil
  • Details: Conditions of Consent - Planning Report
  • DA Number: 275-11-2004
  • Approved: 22nd June 2005
  • Description: 2 Lot Subdivision
  • Location: 1 Burroway Road, Homebush Bay West
  • LGA: Auburn
  • Details: Final Conditions - Instrument of Consent - Planning report
  • DA Number: 132-6-2004
  • Title: 2 Lot Subdivision, 117 Golf Links Road, Maclean
  • Approved: 22.6.05
  • Description: 2 lot subdivision
  • Location: Lot 3, 117 Golf Links Road, Maclean
  • LGA: Maclean
  • Details: Planning Report - Conditions
  • DA Number: 184-8-2004
  • Title: 35m telecommunications tower, assoc. antennas and equipment shelter
  • Approved: 22/6/05
  • Description: 35m telecommunications tower, assoc. antennas and equipment shelter
  • Location: lot 59 off soldiers point rd, Salamander Bay Waste Transfer Station, Salamander Bay
  • LGA: Port Stephens council
  • Capital Cost of Development: $121,500
  • F/T Construction Jobs: 0-01
  • Details: Notice of Consent - Planning Report
  • DA Number: 11-1-2004
  • Title: Community activity centre
  • Approved: 22/6/05
  • Description: Community activity centre
  • Location: 1 the Crescent Homebush Bay
  • LGA: AUBURN
  • Capital Cost of Development: $7.6 million
  • F/T Construction Jobs: 5
  • Details: Instrumment of Consent - Planning Report - Conditions
  • DA Number: DA-39-02-01-MOD-3
  • Title: Modification to Bowens Road North open cut coal mine
  • Approved: 20 June 2005
  • Description: The modification allows minor extensions to the mining area of the Bowens Road North mine and the construction of an environmental bund.
  • Location: Stratford, about 10 kilometres south of Gloucester.
  • LGA: Gloucester
  • Details: Notice of Modification - Consolidated Consent
  • Title: Upgrade of Main Road 92 between Nowra and Nerriga
  • Approved: 20/6/05
  • Description: Involves upgrading a total length of road of 54km
  • Location: Between Hames Road (south west of Nowra) and the village of Nerriga (north east of Braidwood)
  • LGA: Shoalhaven and Palerang
  • Capital Cost of Development: $75 million
  • Details: Asssessment Report and appendices - Appendix B - Appendix C - Instrument of Approval
  • DA Number: MOD No:32-2-2005
    DA No: 298-8-2002
  • Approved: 20/6/05
  • Description: 274 residential units,cafe/mixed business, basement car park & associated site works.
  • Location: 10-16 Marquet Street Rhodes.
  • LGA: Canada Bay
  • Details: Planning Report - Ministerial Submission - Conditions of Consent
  • DA Number: MOD No:21-2-2005
    DA No: 298-8-2002
  • Approved: 20/6/05
  • Description: 274 residential units,cafe/mixed business, basement car park & associated site works.
  • Location: 10-16 Marquet Street Rhodes.
  • LGA: Canada Bay
  • Details: Planning Report - Ministerial Submission - Conditions of Consent
  • DA Number: DA 176-9-2004-i
  • Title: Crookwell II Wind Farm
  • Approved: 10 June 2005
  • Description: Construction and operation of a wind farm consisting of 46 x 2 Mega Watt wind turbines and associated infrastructure
  • Location: The site is located on both sides of Crookwell Road approximately 14 kilometres south-east of Crookwell and 30 kilometres north-west of Goulburn
  • LGA: Upper Lachlan Council
  • Capital Cost of Development: $175 million
  • F/T Construction Jobs: Maximum of 80 people
  • Details: Assessment Report - Notice of Consent - site map - Appendix C - Appendix D - Appendix E - Appendix F - Appendix G - Appendix H - Appendix I - Appendix J - Appendix K
    If you require any further information please contact: Jacqueline Ingham - Environmental Planner on (02) 9228 6338
  • DA Number: DA-101-4-2004-i
  • Title: Barren Box Swamp Project
  • Approved: 10 June 2005
  • Description: The splitting of Barren Box Swamp into three distinct cells, the restoration of a more natural flooding regime to 1,500ha cell for the purposes of rehabilitating this area to a more natural ephemeral wetland, the widening of the Wah Wah main channel and construction and use of a 2,500ML En-route storage facility upstream of Barren Box Swamp.
  • LGA: Griffith
  • Capital Cost of Development: $30 million
  • F/T Construction Jobs: 75 full-time equivalent positions during construction
  • Details: Assessment Report - Draft Consent
  • DA Number: MOD No: 71-7-2004
    DA No: 73-5-2003
  • Date of Refusal: 9th June 2005
  • Description: 230 Lot Subdivision and Civil Works (Stages 5 & 6, Koala Beach Proposal)
  • Location: Lot 463 DP 1040725 Sassafras Street, Pottsville
  • LGA: Tweed
  • DA Number: 244-10-2004
  • Title: Erection of Telecommunications Tower at Lot 1 DP 510738, Sewerage Treatment Works, Industrial Road, Harrington
  • Approved: 8th June 2005
  • Description: Erection of Telecommunications Tower
  • Location: Lot 1 DP 510738, Sewerage Treatment Works, Industrial Road, Harrington
  • LGA: Taree
  • Capital Cost of Development: $150 000
  • Details: Planning Report - Notice of Consent
  • DA Number: MOD No: 62-4-2005
    DA No: 157-6-2004
  • Title: Changes to Part C of Consent
  • Approved: 7/6/05
  • Description: Changes to Part C of Consent
  • Location: 1 Lyon Park and Paul St North Ryde
  • LGA: RYDE
  • Details: Planning Report - Conditions
  • DA Number: MOD No: 13-1-2005
    DA No: 231-5-2005
  • Title: Modifications to Building B7 (Original DA 231-5-2005), Lee Wharf, Honeysuckle Drive Newcastle MOD 13-1-2005
  • Approved: 7th June 2005
  • Description: Proposed modifications to DA 231-5-2005 include moving the building so that it is 12m apart from Building 2, reducing the number of serviced apartments from 74 to 70, deletion of one car space from the basement, colour changes to the north and south elevations to correspond to adjoining buildings and a number of other minor internal and façade modifications.
  • Location: Lee Wharf Building 7 Honeysuckle Drive, Newcastle
  • LGA: Newcastle
  • Details: Notice of Consent
  • DA Number: Mod-42-3-2005
  • Title: Camden Gas Project - Stage 2 - Modification Application
  • Approved: 6 June 2005
  • Description: Extension to the Control Room Building - Rosalind Park Gas Treatment Plant.
  • Location: Rosalind Park Gas Treatment Plant
  • LGA: Campbelltown
  • Details: Consolidated Consent - Modification Consent
  • DA Number: DA 265-10-2004
  • Title: Expansion of Karuah Quarry
  • Approved: 3 June 2005
  • Description: The Development involves the extension of the existing hard rock quarry onto adjoining land to extract up to 11.2 million tonnes of hard rock at a maximum rate of 500,000 tonnes a year for the next 22 years.
  • Location: Karuah hard rock quarry, 4km north of the Karuah township, NSW
  • LGA: Great Lakes
  • Details: Instrument of Consent - Assessment Report
  • DA Number: DA-271-06-2003-i
  • Title: Extension of the Eastern Creek Waste Management Centre
  • Approved: 3 June 2005
  • Description: Extension of the Eastern Creek Waste Management Centre to provide additional landfill capacity
  • Location: Wallgrove Road, Eastern Creek (Lot 1 DP 1040258)
  • LGA: Blacktown
  • Details: Instrument of Consent
  • DA Number: DA No. 466-11-2003 and DA No.467-11-2003
  • Title: Extension of Cleary Bros' Albion Park Quarry
  • Approved: Friday, May 27, 2005
  • Description: Extension of Cleary Bros' hard rock quarry onto adjoining land, and construction of a haul road linking the extension to the existing quarry.
  • Location: Dunsters Lane, Croom
  • LGA: Shellharbour
  • Details: Conditions of Consent (Haul Road) - Conditions of Consent (Quarry Extension) - Assessment Report
  • DA Number: DA-9-1-2005
  • Title: Camden Gas Project - Stage 2
  • Approved: 26 May 2005
  • Description: The proposed construction and operation of a gas gathering system, connection of 6 coal seam methane gas wells and the gas gathering system to the Stage 2 Gas Treatment Plant, and production of methane gas.
  • Location: Lot 501 DP 86956, Lot 1061 DP 801307, Lot 54 DP 864754 and Lot 1101 DP 883495 Glenlee Road, Mt Annan (Glenlee site) and Lot 1 DP 1067320, Remembrance Drive, Camden South (Elizabeth Macarthur Agricultural Institute land).
  • LGA: Camden and Wollondilly
  • Details: Notice of Consent - Assessment Report
  • DA Number: DA 38-3-2005
  • Title: Bulga Overburden Dump Development Application
  • Approved: Wednesday, May 25, 2005
  • Description: The development involves the transportation and emplacement of approximately 10 million bank cubic meters of overburden from the Bulga open-cut mine, at an existing 32 hectare open-cut void at the Mount Thorley Mine.
  • Location: Bulga Coal Mine, located 15 km north-west of Singleton in the Upper Hunter Valley
  • LGA: Singleton
  • Details: Instrument of Consent - Assessment Report
  • DA Number: 49-3-2005
  • Title: Lot 14 DP 883573, Cnr Holker Street & Avenue of Africa, Newington
  • Approved: Tuesday, May 24, 2005
  • Description: Addition of a Lunchroom to existing building and rearrangement of external paved area
  • LGA: Auburn
  • Value:$100 000
  • Jobs: 3
  • Details: Notice of Consent
  • DA Number: 49-3-2005
  • Title: Lot 14 DP 883573, Cnr Holker Street & Avenue of Africa, Newington
  • Approved: Tuesday, May 24, 2005
  • Description: Addition of a Lunchroom to existing building and rearrangement of external paved area
  • LGA: Auburn
  • Value:$100 000
  • Jobs: 3
  • Details: Notice of Consent
  • DA Number: DA No. 251-09-01
  • Title: Modification of Development Consent for the Ginkgo Mineral Sands Project
  • Approved: Tuesday, May 17, 2005
  • Description: The modification involves:
    Increasing the heavy mineral concentrate production rate from 450,000 to 576,000 tonnes per year;
    Extending the life of the mine from 11 to 12 years;
    Transportation of heavy mineral concentrate via double road-trains;
    Addition of an on-site heavy mineral concentrate treatment facility;
    Addition of heavy mineral concentrate stockpiles;
    Addition of a reverse osmosis plant for potable water production; and
    Relocation of the accommodation camp.
  • Location: 40 kilometres west of Pooncarie in western NSW, on Mining Lease (ML) 1504
  • LGA: Wentworth
  • Details: Consolidated Conditions of Consent - Assessment Report
  • DA Number: 38-2-2004
  • Title: Lot 1/DP796976 Micalo Street, Iluka - 5 lot Subdivision
  • Approved: Tuesday, May 17, 2005
  • Description: 5 Lot Subdivision & Road Construction
  • Location: Lot 1/DP796976 Micalo Street, Iluka
  • LGA: Maclean
  • Details: Notice of Consent - Planning Report
  • DA Number: Division 4 of Part 5 of the EP&A Act
  • Title: Darling Anabranch Management Plan
  • Approved: 17 May 2005
  • Description: The proposal involves the:
  • Construction of a reticulated stock and non-potable domestic water supply pipeline for 41 properties located along the Anabranch including the installation of pumps, pipeline and filtration system, and connections to landholders existing pipeline systems;
  • Reinstatement of a more natural flow regime within the Anabranch by releasing an environmental flow, the timing and volume being determined by adaptive management methods; and
  • Removal or modification of most in-stream water regulation structures.
  • Location: Great Darling Anabranch channel
  • LGA: mostly Wentworth Shire and western New South Wales
  • Capital Cost of Development: $37 million
  • Details: Approval Instrument - DG's Assessment
  • DA Number: 84-4-2004
  • Approved: 17th May 2005
  • Description: 4 Lot Rural Residential Subdivision
  • Location: 9 Bangalow Drive, Nambucca Heads
  • LGA: Nambucca Shire Council
  • DA Number: 176-4-2003
  • MOD Number:93-9-2004
  • Title: MOD 93-9-2004 modifying DA 176-4-2003
  • Approved: 17 May 2005
  • Description: Modification of Condition No. 5 relating to tourist accommodation restrictions.
  • Location: Lot 1 Pandanus Pde Cabarita Beach
  • LGA: Tweed Shire
  • Capital Cost of Development: 18.75 million
  • F/T Construction Jobs: 68
  • Details: Notice of Consent - Planning Report
  • DA Number: 297-12-2004-i
  • Title: Campus Homebush Buildings F & G
  • Approved: Friday, May 06, 2005
  • Description: Warehouse, storage and distribution facilities comprising 26880sq.m with associated offices and a total of 399 parking facilities (basement and gorund level).
  • Location: 350-374 Parramatta Road, Homebush
  • LGA: Strathfield
  • Details: Instrument of Consent
  • DA Number: MP 44-10-2004
  • Title: Subdivision
  • Date of Refusal: 6 May 2005
  • Description: 45 residential lot subdivision, provision of open space and roads
  • Location: Lot 2 DP622475 Survey Street, Lennox Head
  • LGA: Ballina Shire Council
  • Capital Cost of Development: $ 1.6 million
  • Details: Refusal
  • DA Number: DA 497-12-2003
  • Title: New Assembly Hall
  • Approved: Thursday, May 05, 2005
  • Description: Construction of Assembly Hall & Amenities (incl.Demolition)
  • Location: 1727 Castlereagh Road, Upper Castlereagh
  • LGA: Penrith City Council
  • Value:$150,000
  • Jobs: F/T 2.0
  • Details: Notice of Consent - Planning Report
  • DA Number: DA 497-12-2003
  • Title: New Assembly Hall
  • Approved: Thursday, May 05, 2005
  • Description: Construction of Assembly Hall & Amenities (incl.Demolition)
  • Location: 1727 Castlereagh Road, Upper Castlereagh
  • LGA: Penrith City Council
  • Value:$150,000
  • Jobs: 2.0
  • Details: Determination Schedules - Planning Report
  • DA Number: MP 27-7-2004
  • Title: SEPP 71 Masterplan for Subdivision of Land at Corner Princes & Kings Highway, Batemans Bay, Eurobodalla Shire
  • Approved: 5th May 2005
  • Description: 150 lot subdivision
  • Location: Corner Princes & Kings Highway, Batemans Bay
  • LGA: Eurobodalla
  • Capital Cost of Development: Approx. $20,000,000
  • Details: Instrument of adoption
  • DA Number: 58-3-2005
  • Title: Development described in Condition A1, Part A, Schedule 2
  • Approved:
  • Description: Local Development
  • Location: Lot 13, Boardwalk North 1 Honeysuckle Drive, Newcastle NSW 2300
  • Details: Conditions of Consent - Instrument of Consent - Planning Report
  • DA Number: DA 497-12-2003
  • Approved: Thursday, May 05, 2005
  • Description: Demolition of existing toilet and laundry black, removal of trees and construction of an assembly hall with amenities
  • Location: Lot 2 DP 196573 No. 1727 Castlereagh Road Upper Castlereagh
  • LGA: Penrith City Council
  • Details: Notice of Consent - Planning Report
  • DA Number: DA No. 305-7-2003
  • Title: Modification of Development Consent for the Wambo Coal Mine
  • Approved: Thursday, May 05, 2005
  • Description: The modification involves changing the orientation and timing of development of the underground longwalls at the Wambo Coal Mine
  • Location: Wambo Coal Mine, near Singleton in the Upper Hunter Valley
  • LGA: Singleton
  • Details: Notice of Consent - Planning Report
  • DA Number: DA No. 231-07-2000
  • Title: Modification of the Dartbrook Coal Mine Development Consent
  • Approved: Wednesday, May 04, 2005
  • Description: The modification allows the continued use of haul trucks for the transport and disposal of coal rejects at the mine's approved rejects emplacement area, rather than converting to a paste rejects disposal system.
  • Location: Dartbrook Coal Mine located approximately 10km northwest of Muswellbrook in the Upper Hunter Valley
  • LGA: Muswellbrook/Upper Hunter
  • Details: Notice of Consent - Planning Report
  • DA Number: 228-9-2004
  • Title: Removal of storage tanks and associated pipework
  • Approved: 4/5/05
  • Description: Removal of storage tanks and associated pipework
  • Location: 9 Hill Rd Homebush Bay
  • LGA: Auburn
  • Capital Cost of Development: $25,000
  • F/T Construction Jobs: 5
  • Details: Instrument of Consent - Planning Report
  • DA Number: 90-4-2004
  • Title: Lot 14 Ridgewood Drive, Woombah
  • Approved: Wednesday, May 04, 2005
  • Description: Two Lot Subdivision
  • LGA: Maclean
  • Details: Notice of Consent - Planning Report
  • DA Number: 185-8-2004
  • Title: 53 Lot Residential Subdivision & 2 Superlots
  • Approved: Wednesday, May 04, 2005
  • Description:
  • Location: Cedar Grove Estate, Jamberoo Road, Kiama
  • LGA: Kiama
  • Jobs: 10
  • Details: Notice of Consent - Planning Report
  • DA Number: DA 196-8-2004
  • Title: DA 196-8-2004 - 1 Mary Street, Rhodes, - Pedestrian bridge between Retail Centre & Rhodes Corporate Park (DA 196-8-2004)
  • Approved: 3 May 2005
  • Description: Pedestrian bridge between Retail Centre & Rhodes Corporate Park (DA 196-8-2004)
  • Location: Lot 22 DP 1049524 1 Mary St - 1 Homebush Dr - RHODES
  • LGA: Canada Bay Council
  • Capital Cost of Development: $500,000
  • F/T Construction Jobs: 5
  • Details: Conditions of Consent - Instrument of Consent - Ministerial Submission - Compliance Tables
  • DA Number: 187-8-2004
  • Title: Lot 224 Dianella Drive, Casuarina Beach
  • Approved: Thursday, April 28, 2005
  • Description: 114 Tourist Accomodation Units
  • LGA: Tweed
  • Value:$17,500,000
  • Jobs: 245
  • Details: Instrument of Consent
  • DA Number: 286-11-2004
  • Title: Kurnell Sand Development Proposal
  • Refused : Sunday, April 24, 2005
  • Description: The Minister for Infrastructure and Planning, the Hon Craig Knowles MP, has refused the development application from Rocla Pty Limited for the Kurnell Sand Development Proposal at Kurnell.
  • Location: Lot 8, DP 586986, Captain Cook Drive, Kurnell
  • LGA: Sutherland
  • Details: Instrument of refusal
  • DA Number: DA 102-5-2004
  • Title: 91 Hannell Street – Wickham - NCYC - Construction of Club, Conference & Commercial Building – DA 102-5-2004
  • Approved: Thursday, April 21, 2005
  • Description: NCYC - Construction of Club, Conference & Commercial Building
  • Location: Lots 102&103 DP 1015391, 91 Hannell Street, Wickham
  • LGA: Newcastle City Council
  • Value:$3,000,000
  • Jobs: 70
  • Details: Conditions of Consent - Instrument of Consent - Planning Report
  • DA Number: DA 274-11-2004
  • Approved: Thursday, April 21, 2005
  • Description: 2 lot subdivision
  • Location: Lot 2 DP 1071449 3 Burrabri Lane Durras South
  • LGA: Eurobodalla Shire Council
  • Details: Notice of Consent - Planning Report
  • DA Number: 513-12-2003
  • Title: Urban Assessments – LGA Auburn – 4 The Crescent Homebush Bay – Mixed Residential/Commercial Development – DA 513-12-2003
  • Approved: Thursday, April 21, 2005
  • Description: Mixed Residential/Commercial Development
  • Location: 4 The Crescent ‘Valencia’, Homebush Bay
  • LGA: Auburn
  • Value:$40 000 000
  • Jobs: 80
  • Details: Consolidated Conditions of Consent
  • DA Number: DA-276-11-2004-i
  • Title: Penrith lakes Scheme
  • Approved: 21 April 2005
  • Description: The proposed extraction of sand from the Pioneer Plant Site in the Penrith Lakes Scheme
  • Location: Pioneer Plant Site, McCarthys Lane, Castereagh
  • LGA: Penrith
  • Details: Notice of Consent - Assessment Report
  • DA Number: 11-1-2004
  • Title: Mt Owen Coal Mine Southern Remnant Report
  • Approved: Tuesday, April 19, 2005
  • Description: Application to reduce the area of the Southern Remnant of the Ravensworth State Forest below 25 hectares, in accordance with Condition 40 of the Mt Owen Coal Mine Development Consent (DA No. 11-1-2004).
  • Location: Mt Owen Coal Mine, near Singleton in the Upper Hunter Valley
  • LGA: Singleton
  • Details: Independent Review of the HVCC application prepared by Cumberland Ecology Pty Limited.
  • DA Number: DA 320-12-2004
  • Title: Lot 23 DP 1062601 Shop 2, Boardwalk South, 1 Honeysuckle Drive Newcastle
  • Approved: Thursday, April 14, 2005
  • Description: Fitout of cafi and provision of outdoor seating area for shop2
  • LGA: Newcastle
  • Details: Notice of Consent - Planning Report
  • DA Number: DA 320-12-2004
  • Approved: 14 April 2005
  • Description: Fitout of cafe and provision of outdoor seating area for shop 2
  • Location: Lot 23 DP 1062601 Shop 2, Boardwalk South, 1 Honeysuckle Drive
  • LGA: Newcastle
  • Details: Planning Report - Instrument of Consent - Conditions of Consent
  • DA Number: 268-6-2003
  • Title: Rhodes Peninsula - Precinct B Masterplan
  • Approved: 8th April 2005
  • Description: Masterplan for Stage 1 Development Application, Residential Open Space & Community Use
  • Location: 40 Walker Street
  • LGA: Canada Bay
  • Capital Cost of Development: $207, 000, 000
  • F/T Construction Jobs: 200
  • Details: Instrument of Consent
  • DA Number: 268-6-2004
  • Title: Rhodes Peninsula - Precinct B Masterplan
  • Approved: 8th April 2005
  • Description: MP/DA for Stage Residential Ope Space & Community Use
  • Location: 40 Walker Street
  • LGA: Canada Bay
  • Capital Cost of Development: $207, 000, 000
  • F/T Construction Jobs: 200
  • Details: Notice of Consent - Planning Report>
  • DA Number: 258-10-2004-i
  • Title: Stage Two of an Industrial/Warehouse Facility, Yennora
  • Approved:  
  • Description: A proposal for the occupation and use of Stage Two of a industrial/warehouse facility for warehousing purposes
  • Location: 205-231 Fairfield Road, Yennora
  • LGA: Holroyd
  • Details: Instrument of Consent
  • DA Number: DA-31-2-2004-i
  • Title: Uranquinty Gas-fired Power Station
  • Approved: Staged development consent was granted by the Minister on 10 June 2005
  • Description: Stage 1 is for the construction and operation an open-cycle gas-fired power station with a generating capacity of 300 megawatts. Stage 2 is for the extension of the open-cycled gas-fired power station to a generating capacity of 600 megawatts.
  • Location: approximately three kilometres west of Uranquinty, on the Uranquinty Cross Road
  • LGA: Wagga Wagga
  • Applicant: Wambo Power Ventures Pty Ltd
  • Value:$117 million
  • Details: Instrument of Consent - Department's Recommendation - Primary Submission to Commission of Inquiry - Reply Submission to Commission of Inquiry
  • DA Number: da-156-4-2003-i
  • Title: Construction and Operation of Cattle Feedlot and Quarry, Kiacatoo
  • Approved: Friday, April 08, 2005
  • Description: An application was made by Rockdale Beef Pty Limited for the construction and operation of a cattle feedlot and associated quarry to be located at Kiacatoo, approximately 30 kilometres west of Condobolin.
  • LGA: Lachlan
  • Value:$25 million
  • Jobs: up to 85 during construction and 50 during operation
  • Details: Notice of Consent - Planning Report
  • DA Number: 219-9-2004
  • Title: Lot 7 DP 557758
  • Approved: Wednesday, April 06, 2005
  • Description: 2 Lot Residential Subdivision
  • Location: No. 219 Old Coast Road, Korora
  • LGA: Coffs Harbour City Council
  • Details: Notice of Consent - Planning Report
  • DA Number: MOD 36-3-2005 modifiying DA 146-6-2004
  • Approved: Monday, April 04, 2005
  • Description: changes to the Tryon Road elevations to provide greater articulation, and to the internal courtyard elevations
    changes to the design of the pedestrian link to provide greater visual interest
    deletion of fences along Tryon Lane
    patios on Tryon Lane to be changed to balconies, and minor internal planning amendments to all buildings including but not limited to the redesign of bathrooms, additional glazing, minor window changes, adjustments to internal floor areas and the reconfiguration of internal spaces.
  • Location: 9-25 Tryon Road Lindfield
  • LGA: Ku-ring-gai Council
  • Details: Notice of Consent - Planning Report
  • DA Number: DA 267-11-2004-i
  • Title: Tweed Heads Boat Harbour Remediation
  • Approved: Monday, April 04, 2005
  • Description: An application was made by Department of Commerce on behalf of Department of Lands for the remediation of contaminated soil and groundwater at the Tweed Heads Boat Harbour and treatment at the Banora Point Sewage Treatment Plant.
  • LGA: Tweed
  • Value:$750,000
  • Jobs: approximately 10
  • Details: Notice of Consent - Planning Report
  • Title: Minor Modifications to the Epping to Chatswood Rail Link
  • Approved: Wednesday, March 30, 2005
  • Description: Minor Changes to Condition No. 263
  • Details: Notice of Consent - Consolidated Set of Conditions
  • DA Number: 257-10-2004
  • Title: Extension of the Ridgeway Mine
  • Approved: Wednesday, March 30, 2005
  • Description: Extension of the existing Ridgeway underground mine by mining 300 metres deeper and extracting up to 53 million tonnes of gold/copper ore over a period of 6 years.
  • Location: 25 kilometres southwest of Orange in the Central West region of NSW
  • LGA: Cabonne and Blayney
  • Details: Notice of Consent - Planning Report
  • DA Number: 203-8-2004
  • Title: Lots 1 & 7 (DP 255731)
  • Approved: Thursday, March 24, 2005
  • Description: Boundary Adjustment
  • Location: Mossy Point Road, Jeremadra
  • LGA: Eurobodalla Shire Council
  • Details: Notice of Consent - Planning Report
  • DA Number: DA 203-8-2004
  • Approved: Thursday, March 24, 2005
  • Description: Boundary adjustment by subdivision of two lots
  • Location: Lot 1 & 7 DP 255731 Mossy Point Road Jeremadra
  • LGA: Eurobodalla Shire Council
  • Details: Notice of Consent - Planning Report
  • DA Number: DA 501-12-2003
  • Title: Lot 17 DP 270320 1 Stromboli Strait Homebush Bay
  • Approved: Thursday, March 24, 2005
  • Description: .Paros. . an 8 storey mixed use residential build
  • LGA: Auburn Council
  • Details: Planning Report
  • DA Number: MOD -30-2-2005 DA-381-8-2003
  • Title: 9 Bayswater Drive
  • Approved: Thursday, March 24, 2005
  • Description: Changes to energy start ratings of clothes dryers
  • Location: 9 Bayswater Drive, Homebush Bay West “Ballagio”
  • LGA: Auburn Council
  • Details: Notice of Consent - Planning Report
  • DA Number: 103-5-2004
  • Title: Erection of a single building for two warehouse/office industrial units on lots 204,205,209 DP 1030744 Site 2 Butu Wargun Drive, Greystanes
  • Approved: 24th March 2005
  • Description: Erection of a single building for two warehouse/office industrial units
  • Location: Lots 204,205,209 DP 1030744 Site 2 Butu Wargun Drive, Greystanes
  • LGA: Holroyd
  • Capital Cost of Development: $7 000 000
  • F/T Construction Jobs: 50
  • Details: Determination Schedules - Ministerial Submission - Planning Report
  • DA Number: 104-5-2004
  • Title: Silverwater Correctional Complex
  • Approved: Wednesday, March 23, 2005
  • Description: Mulawa Correctional Centre, Alterations and Additions
  • Location: Lot 22 in DP 876995
  • LGA: Auburn Council
  • Value:$14,230,000
  • Jobs: F/T 31
  • Details: Notice of Consent - Planning Report
  • DA Number: 522-12-2003
  • Title: 29-33 Marquet st Rhodes
  • Approved: 23/3/05
  • Description: 38 unit residential block with basement carpark
  • Location: 29-33 Marquet st Rhodes
  • LGA: Canada Bay
  • Capital Cost of Development: $8,320,400.00
  • F/T Construction Jobs: 42
  • Details: Planning Report - Conditions
  • DA Number: 036-02-2004
  • Title: Lot 5 DP 580619
  • Approved: Wednesday, March 23, 2005
  • Description: 2 Lot subdivision
  • Location: Congarinni Road, Bowraville
  • LGA: Nambucca Shire Council
  • Details: Notice of Consent - Planning Report
  • DA Number: MOD-6-1-2005 DA-445-10-2003
  • Title: Sydney Opera House Southern Forecourt
  • Approved: Tuesday, March 22, 2005
  • Description: Additional performing arts/community events
  • Location: Sydney Opera House Southern Forecourt, Monumental Steps and Boardwalk Access
  • LGA: City of Sydney Council
  • Details: Notice of Consent - Planning Report
  • DA-164-7-2004-i
  • Title: Regularisation and Proposed Expansion of Berowra Waters Marina
  • Approved: 21 March 2005
  • Applicant: Cameron Brae Pty Ltd
  • Description: Regularises and expands the existing marina operations by:
    • extending the two marina arms further to the east;
    • formalising the use of the marina to berth a total of 78 vessels;
    • formalising the use of the charter ferry berth (Berth No. 79) and continuation of a charter ferry operation from the marina;
    • using the 'fuel wharf' to provide a maximum of four 'short stays' berths at the marina;
    • using the existing car park facility on site to park up to 44 vehicles by using stacked parking during peak periods; and
    • formalising the continued use of the ground floor of the marina building as a showroom, chandlery shop, offices, storeroom and café with outdoor seating.
  • Location: Bay Road, Berowra Waters
  • LGA: Hornsby
  • Details: Instrument of Consent; Assessment Report
  • DA Number: DA-211-9-2004
  • Title: Manning River Dredging
  • Approved: Wednesday, March 16, 2005
  • Description: Extraction of up to 520,000 m3 of material from the bed of the Manning River, transportation of this material in slurry form through pipelines to onshore processing facilities and subsequent use as fill material for the Harrington Waters Estate residential development. Water from the settlement ponds to be returned to the Manning River.
  • Location: Bed of the Manning River, spanning a river length of approximately 1200 metres between Pelican Point and Harrington Waters Estate
  • LGA: Greater Taree
  • Details: Notice of Consent - Planning Report
  • DA Number: 229-9-2004
  • Title: Part Lot 1, DP 270113
  • Approved: Tuesday, March 15, 2005
  • Description: Construction/Landscaping of Marine Parade
  • Location: Marine Parade, Homebush Bay
  • LGA: Auburn Council
  • Value:$900 000
  • Jobs: 2 full time equivalent operational jobs
  • Details: Notice of Consent - Planning Report
  • DA Number: 493-11-2003
  • Title: Lot 10 DP 270320 No 2 Stromboli Strait, Homebush Bay (“Sorrento”)
  • Approved: Thursday, March 03, 2005
  • Description: 8 Storey Residential Complex (119 Units)
  • LGA: Auburn
  • Value:$25, 000, 000
  • Jobs: 80
  • Details: Instrument of Consent
  • DA Number: MOD No: 117-11-2004
    DA No: 147-4-2003
  • Title: Amendments to Warehouse 2 and 3
  • Date of Approval: 2nd March 2005
  • Description: Amendments to Warehouse 2 and 3
  • Location: Picrite Close, Greystanes
  • LGA: Holroyd Council
  • Capital Cost of Development: $11,725.00
  • Details: Determination - RTF - Planning Report - RTF
  • DA Number: DA 163-7-2004
  • Approved: Wednesday, March 02, 2005
  • Description: Erection and strata subdivision of 16 offie/warehouse units
  • Location: Lot 2 DP 1049575 4 Avenue of Americas Newington
  • LGA: Auburn Council
  • Details: Notice of Consent - Planning Report
  • DA Number: DA 1-1-2005
  • Title: Lot 1112 DP 883474 Level 6 & 7 Honeysuckle House 2 South Honeysuckle Drive Newcastle
  • Approved: Monday, February 28, 2005
  • Description: Office fitout of the majority of levels 6 & 7 in Honeysuckle House 2
  • LGA: Newcastle
  • Details: Notice of Consent - Planning Report
  • DA Number: 106-5-2004 MOD15-2-2005
  • Title: Working Studios Precinct – Stage 8
  • Approved: Monday, February 28, 2005
  • Description: Raising of the internal stage floor
  • Location: Fox Studios Australia, Moore Park
  • LGA: Sydney
  • Details: Planning Report | Determination and Conditions
  • DA Number: DA 191-08-2004
  • Approved: Wednesday, February 23, 2005
  • Description: the demolition of an existing dwelling and construction of a new residence, garaging and swimming pool
  • Location: 1097 Middle Head Road Mosman (Lot 6, DP 233157)
  • Value:$600,000
  • DA Number: 134-04-00
  • Title: Modification of Development Consent for the Blayney Concentrate Dewatering Facility
  • Approved: Wednesday, February 23, 2005
  • Description: The modification involves:

  • Relocation of container filling and loading operations from the eastern to the southern side of the building; and

  • Minor modifications to the building, including installation of access doors on the southern side of the building.

  • Location: Blayney
  • LGA: Blayney Shire Council
  • Details: Consolidated Instrument of Consent, including modification.
  • DA Number: DA 191-08-2004
  • Title: Demolition Of Existing, And Construction Of New Residence At 1097 Middle Head Road Mosman
  • Approved: Wednesday, February 23, 2005
  • Description: the demolition of an existing dwelling and construction of a new residence, garaging and swimming pool.
  • Location: 1097 Middle Head Road Mosman (Lot 6, DP 233157)
  • LGA: Mosman
  • Value:$600,000
  • Jobs: not given
  • Details:
  • DA Number: DA 94-4-2004
  • Approved: Wednesday, February 23, 2005
  • Description: Boundary Adjustment
  • Location: Lot 3 & 5 DP 253428, Lot 3 DP 253429 and Lot 10 DP 851865 North Creek Road Lennox Head
  • LGA: Ballina Shire Council
  • Details: Notice of Consent - Planning Report
  • DA Number: DA 166-7-2004
  • Title: Lot 4 DP 883474 & Part Lot 21 DP 1051525 Honeysuckle Drive Newcastle
  • Approved: Wednesday, February 23, 2005
  • Description: Additional 2 levels comprising no more than 13 dwellings to a consented residential flat building (building B2) and other modifications to that building and subdivision
  • LGA: Newcastle
  • Details: Notice of Consent - Planning Report
  • DA Number: 198-8-2004
  • Title: lot 22 Carmona Lane , two lot subdivision
  • Approved: 23/2/2005
  • Description: two lot subdivision
  • Location: Lot 22 Carmona Lane
  • LGA: Great Lakes Council
  • Details: Determination - RTF - Submission - RTF - Planning report - RTF
  • DA Number: 198-8-2004
  • Title: lot 22 Carmona Lane , two lot subdivision
  • Approved: 23/2/2005
  • Description: two lot subdivision
  • Location: Lot 22 Carmona Lane
  • LGA: Great Lakes Council
  • Details: Planning report - RTF
  • Title: Freshwater Fish Stocking Activities in NSW
  • Approved: Friday, February 18, 2005
  • Description: The Minister for Infrastructure and Planning approved a statewide strategy for the management of freshwater fish stocking activities. The activity has components which focus on enhancement of freshwater recreational fisheries and the conservation and rehabilitation of some threatened freshwater fish species.
  • LGA: All
  • Details: Final Instrument
  • DA Number: 172- 7-2004
  • Title: Werris Creek Coal Mine
  • Approved: Friday, February 18, 2005
  • Description: Development of open cut coal mining operations by Werris Creek Coal Pty Limited, located about 4 km south of Werris Creek. The mine would produce up to 2 million tonnes of ROM coal a year, and mine about 10 million tonnes of ROM coal over the life of the mine.
  • Location: Quirindi to Werris Creek Road, about 4 km south of Werris Creek.
  • LGA: Liverpool Plains
  • Value:$10 million.
  • Details: Instrument of Consent, Figure i (62Kb), and Assessment Report part 1 and part 2.
  • DA Number: 172-7-2004-MOD-1
  • Title: Werris Creek Coal Mine - Extension of Time to Construct Mine Access Road
  • Date of Approval: 19 October 2005
  • Description: Modification of the Minister's consent to allow until 31 January 2006 for the construction of the mine access road. The modification doeas not change any other part of the consent other than the completion date of the mine access road.
  • LGA:Liverpool Plains Shire
  • Capital Cost: Nil change to cost of the development
  • Jobs: No change to employment levels
  • Details: Notice of Modification - RTF - Consolidated Consent - RTF
  • DA Number: DA 160-6-2004
  • Approved: Wednesday, February 16, 2005
  • Description: 26 Lot strata subdivision
  • Location: Lot 511 DP 1060199 Chapmans Road Tuncurry
  • LGA: Great Lakes Council
  • Details: Notice of Consent - Planning Report
  • DA Number: 204-8-2004
  • Title: John Morony Correctional Facility
  • Approved: Wednesday, February 16, 2005
  • Description: Alterations and Additions to the John Morony Correctional Centre, including:

  • Refurbish an existing office;

  • Extend inmate services building by two bays;

  • Construct a new storage building measuring 85m2;

  • Refurbish the dog squad administration building;

  • Construct new kennels;

  • Placement of a new demountable building.

  • LGA: Penrith
  • Value:$6 000 000
  • Details: Notice of Consent - Planning Report
  • DA Number: 105-90
  • Title: Modification of Development Consent for the Glennies Creek Coal Mine
  • Approved: Wednesday, February 16, 2005
  • Description: The modification involves some minor changes to the mine's surface facilities. The modifications include:

  • relocating the existing workshop and using it to store stone dust;

  • constructing a new workshop;

  • installing shipping containers, which would be used in association with the new workshop for storage;

  • constructing a new hydrocarbon storage and dispensing facility, vehicle/ equipment washdown area and service/ maintenance area;

  • removing the existing 28000L diesel tank, washdown and refuelling bay, and sump and oil separator; and

  • installing a new 5000L diesel fuel tank, and associated tanker unloading station and support services.

  • Location: Glennies Creek Coal Mine, located 12 km north of Singleton in the Hunter Valley
  • LGA: Singleton
  • Details: Consolidated Conditions of Consent
  • DA Number: 78-800-MOD-2
  • Title: Modification of Development Consent for the Mandalong Underground Coal Mine
  • Approved: Wednesday, February 16, 2005
  • Description: Modification of the Minister's consent for the Mandalong underground coal mine to allow the installation of a methane gas drainage plant and the transportation of 1000 tonnes of coal from the mine site by road.
  • Location: Mandalong Road, Mandalong, about 4 km west of Morisset
  • LGA: Lake Macquarie
  • Value:$200,000.
  • Details: Notice of Consent - Planning Report
  • DA Number: 28-01-2003
  • Title: A subdivision of Lot 100, DP 815766 (Brabham Drive and Ferrers Road) and Lot 1, DP 855014 (Reen Road) Eastern Creek into five allotments.
  • Approved: Monday, February 14, 2005
  • Description: A subdivision of Lot 100, DP 815766 (Brabham Drive and Ferrers Road) and Lot 1, DP 855014 (Reen Road) Eastern Creek into five allotments.
  • LGA: Blacktown
  • Value:Nil
  • Jobs: Not applicable. No works involved.
  • Details: Conditions of Consent
  • DA Number: 86-2889
  • Title: Modification of Development Consent for the Camberwell Coal Mine
  • Approved: Thursday, February 10, 2005
  • Description: The modification involves:

  • The continuation of internal road haulage of coal from the Glennies Creek Colliery to the Camberwell CHPP

  • The deferment of the construction of a conveyer between the mines until the cessation of open cut operations at the Camberwell Coal Mine; and

  • The construction of a new haul road along the RL 100 contour to transport coal between the mines.

  • Location: Camberwell Coal Mine, located 10 km north of Singleton in the Hunter Valley
  • LGA: Singleton
  • Details: Assessment Report | Consolidated conditions of consent
  • DA Number: 126/05/2004
  • Title: Residential Development
  • Approved: 2 February 2005
  • Description: Multi Unit Housing Development
  • Location: 4-14 Merriwa Street and 3-11 McIntyre Street, Gordon NSW 2072
  • LGA: Ku-ring-gai
  • Capital Cost of Development: $ 46,000,000
  • F/T Construction Jobs: 300 full time equivalent construction jobs
  • Details: Conditions - RTF - Planning Report - RTF
  • DA Number: 156-6-2004
  • Title: Homebush Bay 'Napoli'
  • Approved: Tuesday, February 01, 2005
  • Description: The construction of 12 additional residential apartments to the approved development, raising the building height from 4 storeys to 6 storeys, and the reconfiguration of 4 approved apartments, from single storey to doubled storey apartments
  • LGA: Auburn
  • Details: Notice of Consent - Planning Report
  • DA Number: DA 419-9-2003
  • Approved: Monday, January 31, 2005
  • Description: Tourist accommodation units
  • Location: Lot 3 DP 26893 98 Beach Road Batemans Bay
  • LGA: Eurobodalla Shire Council
  • Details: Notice of Consent - Planning Report
  • DA Number: MOD 99-9-2004 modifying DA 71-2-2003
  • Approved: Monday, January 31, 2005
  • Description: Minor amendments to approved plans
  • Location: Lot 603 DP 1047403 1 Foundation Place Prospect
  • LGA: Holroyd Council
  • Details: Notice of Consent - Planning Report
  • DA Number: 205-8-2004
  • Title: Refurbishment at Moriah College
  • Approved: Monday, January 31, 2005
  • Description: Refurbishment of former DOCS Outpatients building
  • Location: Cnr York Rd & Queens Park Rd, Waverley
  • LGA: Waverley
  • Value:$400,000
  • Details: Conditions of Consent and Planning Report
  • DA Number: 122-5-2004
  • Title: Pacific Palms
  • Approved: Monday, January 31, 2005
  • Description: 3 Lot community Title Subdivision
  • Location: Lot 2 DP 1052270 Coomba Road, Pacific Palms
  • LGA: Great Lake Council
  • Details: Notice of ConsentPlanning Report
  • DA Number: 71-3-2004
  • Title: Mixed use retail / residential / tourist development, Shoal Bay
  • Approved: Monday, January 31, 2005
  • Description: Demolition of existing motel and construction of a mixed retail /
    residential and tourist development
  • Location: Port Stephens
  • LGA: Port Stephens
  • Value:$5.3m
  • Jobs: 18+
  • Details: Planning Report - Determination Conditions
  • Title: RTA - Modification to the Five Islands Road Upgrade
  • Approved: Monday, January 31, 2005
  • Description: deletion of Condition 58 requiring test excavations for one Aboriginal site
  • Location: Teralba, NSW
  • Value:$40M
  • Jobs: 100
  • Details: see attached - Planning Report and Approval of Modification
  • DA Number: DA 80-4-2004
  • Title: Sites 5, 6 & 7 Dawn Fraser Avenue Sydney Olympic Park
  • Approved: Thursday, January 27, 2005
  • Description: Construction of three commercial/retial office buildings
    Subdivision of land into four separate parcels
    Associated basement parking
    Landscaping
    Public domain improvement works
  • LGA: Auburn Council
  • DA Number: 492-11-2003
  • Title: Kingscliff
  • Approved: Thursday, January 27, 2005
  • Description: Mixed commercial / retail tourist accommodation facility
  • LGA: Tweed Shire
  • Details: Notice of Consent | Conditions of Approval | Planning Report
  • DA Number: 309-11-2001-i
  • Title: Ashton Coal Mine – Eastern Overburden Emplacement Area
  • Approved: Thursday, January 27, 2005
  • Description: The modification involves increasing the height of the eastern emplacement area for the mine by 10 metres to RL 135 metres, thereby removing the need to construct the western emplacement area and associated infrastructure.
  • Location: Glennies Creek Road, Camberwell
  • LGA: Singleton
  • Details: Assessment Report and the Consolidated Conditions of Consent
  • DA Number: 119-5-2005
  • Title: DEVELOPMENT PROPOSAL – Lot 22 (Shop 1), Boardwalk South, 1 Honeysuckle Drive, Newcastle – Restaurant fit-out and use (DA 119-5-2005)
  • Approved: 15/1/05
  • Location: LARRNA Thai Restaurant Fitout
  • LGA: NEWCASTLE
  • Capital Cost of Development: $30,000
  • F/T Construction Jobs: 2
  • F/T Post Construction Jobs: 8
  • Details: Planning Report - RTF - Conditions - RTF
  • DA Number: 456-11-2003
  • Title: Tweed Heads - Ultima
  • Approved: Monday, January 10, 2005
  • Description: Amendment of Building design for the establishment of a mixed residential, commercial / tourist accommodation development.
  • LGA: Tweed Shire
  • Details: Notice of Consent - Planning Report
  • DA Number: DA475-11-2003
  • Title: Lots 9,12, Pt Lot 7, and Pt Lot 10 DP 1062327, 1 Mary Street, Rhodes
  • Approved: 22/11/2004
  • Description: Three residential buildings comprising a total of 95 units and 123 car spaces, excavation, bulk earthworks, and strata subdivision; Landscaping of Sevier Avenue and Neighbourhood Park
  • Location: Super lot 9; DP/Sheet 3 of DP 1047108, 1 Mary St Rhodes
  • LGA: Canada Bay
  • Capital Cost of Development: 24 million dollars
  • F/T Construction Jobs: 125
  • F/T Post Construction Jobs: 35
  • Details: Instrument of Consent - RTF - Planning Report - RTF