The Minister for Planning, the Hon. Frank Sartor, MP, has determined the following major development proposals and modifications under Part 4 or Part 5 of the Environmental Planning and Assessment Act 1979.
Note: This list is ordered by date of determination or approval, with the most recent at the top.
- MOD 88-11-2007 to DA 114-04-2002
- Title: Modification - Staged Subdivision and Associated Infrastructure Works, Spurway Street, Ermington
- Approved: 31 December 2007
- Proponent: National Projects Consultants Pty Ltd
- Description: Amend Condition A2 (by reference to amending plans, which delete certain infrastructure items); and deletion of Condition B3 - Stormwater Treatment; and Condition B9 - Cycle Refuge
- Location: Former naval depot site, Lot 1006 DP 1040571, Spurway Street, Ermington
- LGA: Parramatta
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Strategic Sites and Urban Renewals as delegate for the Minister for Planning
- Relevant legislation: Section 96(1A), Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Planning Report and notice of modification approval
- DA 60-3-2001
- Title: West Cliff Emplacement Area Stage 3
- Approved: December 20, 2007
- Proponent: BHP Billiton - Illawarra Coal Holdings Pty Ltd
- Description: Construction and operation of Stage 3 of the West Cliff Coal Wash Emplacement
- Location: West Cliff Colliery; around 2 to 5km northwest of Appin, NSW
- LGA's: Wollondilly Shire Council, Wollongong City Council, Wingecarribee Shire Council
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Minister for Planning
- Relevant legislation: Section 96 of the Environmental Planning and Assessment Act 1979
- Documents available: Assessment report, response to submissions, staged development approval
- DA 41/98 MOD 4
- Title: Tritton Copper Mine Expansion
- Approved: 19 December 2007
- Proponent: Tritton Resources Limited
- Description: Expansion of the Tritton processing plant, construction of an additional lift to the tailings storage facility
- Location: Near Hermidale, approximately 45 kilometres northwest of Nyngan
- LGA/s: Bogan Shire
- Capital cost of development: $12.5 million
- F/T Construction Jobs: 21
- F/T Post Construction Jobs: 10
- Approval Authority: Executive Director, Major Project Assessments as delegate for the Minister of Planning
- Relevant legislation: Section 96(2) of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of modification approval
- Additional information: Modification application
- DA 44/95 MOD 6
- Title: Cadia Hill Gold Mine - Extension to flow release conditions
- Approved: 19 December 2007
- Proponent: Cadia Holdings Pty Ltd
- Description: Restrict releases from Cadiangullong Dam for a further 13 months
- Location: Near Orange in the Central West region of New South Wales
- LGA: Blayney and Cabonne shires
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Major Project Assessments as delegate for the Minister of Planning
- Relevant legislation: Section 96(1A) of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General’s Assessment Report, notice of modification approval and consolidated consent (as amended)
- MOD 73-9-2007 to DA 40-7-2006
- Title: Proposed Section 96 Application to modify DA 40-7-2006, Former Beacon Hill High School, Tristram Road, Beacon Hill
- Approved: 13 December 2007
- Proponent: Tristram Developments Pty Ltd
- Description: Deletion of proposed residential allotment no.26 to form a 25 lot subdivision in lieu of the currently approved 26 lots and reconfiguration of the currently approved Lots 16 through to 24 from original width of 13.66m and area of 435m2 to proposed width of 15.07m wide and area of 479m2. Lot 25 will be reconfigured from original width of 13.66m and area of 435m2 to width of 15.08m and area of 505m2.
- Location: Lot 201 DP 1039890, 6 Tristram Road, Beacon Hill
- LGA: Warringah
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Details of approval: Instrument of Consent, Consolidated Consent, Planning Report
- Mod 31-3-2007 to DA 440-10-2003
- Title: Modification - Beach Motel Suites, Bay Street, Byron Bay
- Approved: 10 December 2007
- Proponent: Hizan Holdings Pty Ltd
- Description: The original development consent approved a three-level tourist facility comprising 14 rooms (10 motel units and 4 serviced apartments) with basement car parking for 22 vehicles and associated landscaping and ancillary works. The applicant sought modifications to development approval conditions A2, B1, B2, and B12
- Location: Lot 1 DP 1076677, 18-20 Bay Street, Byron Bay
- LGA: Byron Shire
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Major Project Assessments as delegate for the Minister for Planning
- Relevant legislation: Section 96(1A), Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Planning Report and notice of modification approval and consolidated consent (as modified)
- MOD 82-10-2007 to DA 77-3-2002
- Title: Modification - Residential Subdivision, George Bass Drive, Barlings Beach
- Approved: 10 December 2007
- Proponent: Mr Lee Dunn, Barlings Beach Community Pty Ltd
- Description: Development application DA 77-3-2002 was approved on 17 December 2005 for a 162-lot residential subdivision, comprising 159 conventional lots, 2 lots for integrated housing and 1 lot to accommodate an Aboriginal cultural and retail facility. The applicant sought modifications to development approval conditions E1(b), E1(f), E2, E5, E6, E8 and E9
- Location: Lot 2 DP 1016146
- LGA: Eurobodalla
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Major Project Assessments as delegate for the Minister for Planning
- Relevant legislation: Section 96(1A), Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Planning Report and notice of modification approval
- DA 211-93 MOD 2
- Title: Bengalla Coal Mine: Wantana Extension
- Approved: 6 December 2007
- Proponent: Bengalla Mining Company Pty Ltd
- Description: Expansion of mining operations into the Wantana region; minor infrastructure modifications and relocations.
- Location: 4 kilometres west of Muswellbrook
- LGA/s: Muswellbrook
- Capital cost of development: $20.8 million
- F/T Construction Jobs: 49
- F/T Post Construction Jobs: 120
- Approval Authority: Executive Director, Major Project Assessment as delegate for the Minister of Planning
- Relevant legislation: Section 96(2) of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of modification approval
- Additional information: Modification application
- MOD 84-10-2007 to DA102-5-2004
- Title: Modification to Commercial/Club Facilities Development, Newcastle Cruising Yacht Club
- Approved: 5 December 2007
- Proponent: Newcastle Cruising Yacht Club
- Description: Minor amendments to the internal and external configuration of Stage 1 of the development, including the deletion of the eastern balcony on the first floor and the incorporation of this balcony area as additional office space. This additional office space has increased the gross floor area by approximately 37.8m² and therefore the section 94 contributions have been recalculated. The modification also amends Condition B24, which now requires the creation of an easement prior to the issue of the occupation certificate instead of prior to the issue of the construction certificate
- Location: Lots 102 and 103 DP 1015391, 91 Hannell Street, Wickham
- LGA: Newcastle
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Strategic Sites and Urban Renewal as delegate for the Minister for Planning
- Relevant legislation: section 94(1A), Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report, notice of modification approval, consolidated consent (as amended)
- DA 188-8-2004
- Title: Coastal Subdivision, Angels Beach Estate, Ballina
- Approved: 18 November 2007
- Proponent: Stephen Connelly, SJ Connelly Pty Ltd
- Description: Subdivision comprising 61 Torrens title lots (lots 1-61); 2 Torrens title lots for future cluster housing (lots 62 and 63); 2 parks (lots 66 and 67); 1 natural conservation area ( lot 65); 1 cultural conservation area (Lot 64); access roads; and, associated drainage, civil and subdivision works
- Location: Lot 208 DP 851318, Angels Beach Drive and The Coast Road, East Ballina
- LGA: Ballina Shire
- Capital cost of development: $2.67 million
- F/T Construction Jobs: 15
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Major Project Assessments as delegate for the Minister for Planning
- Relevant legislation: section 79C, Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: section 79c evaluation, Director-General's Assessment Report and notice of approval
- MOD-68-8-2007 to DA 13/94
- Title: Modification to Visy Paper Recycling Plant, Smithfield
- Approved: 18 November 2007
- Proponent: Visy Pulp and Paper
- Description: Upgrade of the water treatment plant
- Location: 6 Herbert Place, Smithfield
- LGA: Holyroyd
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Minister for Planning
- Relevant legislation: section 96 in Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and Modification Approval
- MOD-75-9-2007 to DA 11/94
- Title: Modification to OneSteel Sydney Steel Mill, Rooty Hill
- Approved: 16 November 2007
- Proponent: OneSteel NSW Pty Ltd
- Description: Modification to increase production from 550,000 to 570,000 tonnes per annum of finished product, increase truck movements, extend collection hours of bag house dust, and amend transport routes to include the M7
- Location: 22 Kellogg Road, Rooty Hill
- LGA: Blacktown
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Minister for Planning
- Relevant legislation: section 96 in Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and Modification Approval
- DA 410-11-2002 MOD 7
- Title: United Coal Mine Longwall 7 - Modification
- Approved: 6 November 2007
- Proponent: United Collieries Pty Ltd
- Description: Mining Longwall Panel (LW) 7 through part of an exclusion zone associated with the Wambo Homestead Complex
- Location: United Coal Mine, Golden Highway
- LGA: Singleton
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Major Project Assessment as delegate of the Minster for Planning
- Relevant legislation: section 96(2) of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report (parts 1, 2, 3, 4), notice of modification approval and consolidated consent (as modified)
- DA 260-8-2002-i Mod 1
- Title: Bedford Quarry - Modification
- Approved: 6 November 2007
- Proponent: Goodman International Limited
- Description: The modification involves changing the extraction sequence and associated minor changes to the layout and operation of the quarry
- Location: Lot 2, DP 120673 and Lot 1, DP 843901, Old Wallgrove Road, Horsley Park
- LGA: Fairfield
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Minister for Planning
- Relevant legislation: Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General’s Assessment Report, notice of the modification of consent and consolidated consent (as modified)
- DA 300-9-2002 MOD 3
- Title: Warkworth Coal Mine - Upgrade of Electrical Switchyard
- Approved: 31 October 2007
- Proponent: Warkworth Mining Pty Limited
- Description: The modification involves upgrading the Mount Thorley Warkworth electrical switchyard from 80 to 100 MVA capacity
- Location: Warkworth Coal Mine, off the Golden Highway, Mount Thorley about 13 kilometres southwest of Singleton
- LGA: Singleton
- Capital cost of development: $2,000,000
- F/T Construction Jobs: 1.44
- F/T Post Construction Jobs: Nil
- Approval Authority: Minister for Planning
- Relevant legislation: Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report, notice of the modification of consent and consolidated consent (as modified)
- Additional information: Modification application
- DA 149-6-2004
- Title: Rural Subdivision at The Branch Lane, Karuah
- Approved: 29 October 2007
- Proponent: Tattersall Surveyors Pty Ltd
- Description: Four-lot rural subdivision, including one access road, to be undertaken in three stages
- Location: Lot 18 DP 1032636, The Branch Lane, Karuah
- LGA: Great Lakes
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Approved by the Land and Environment Court of NSW
- Relevant legislation: Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Notice of modification approval
- Additional information: Plan of site attributes and subdivision of Lot 18
- MOD 54-6-2007 to DA 80-4-2004
- Title: Modification - Commercial Development, Site 6 and 7, Dawn Fraser Avenue, Sydney Olympic Park
- Approved: 29 October 2007
- Proponent: Bovis Lend Lease
- Description: The original development consent approved the construction of three retail/commercial office buildings, subdivision of land into four separate parcels, associated basement parking, landscaping and public improvement works. This modification amends the approval regarding Building 7 in the following manner: infilling the voids facing Australia Avenue on levels 2, 4 and 6, resulting in an increase in the net lettable area and gross floor area of approximately 135.2m2; and incorporating informal 'mixed mode spaces' for staff and façade glass operable to these spaces
- Location: Part Lot 50 DP 104552, Lot 6002 DP 1063407 – Site 6 and 7, Dawn Fraser Avenue, Sydney Olympic Park
- LGA: Auburn
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Strategic Sites and Urban Renewal as delegated for the Minister for Planning
- Relevant legislation: Section 96(1A), Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Planning Report and notice of modification approval
- DA-34-7-2007-i
- Title: Demountable Office and Amenities Building for Tug Boat Facility, Port Botany
- Approved: 4 October 2007
- Proponent: Adsteam
- Description: Demolition of existing office building and associated structures; erection of a single-storey demountable building on the northern part of the site to contain offices and amenities for tug boat operators; and associated works including the provision of car parking spaces
- Location: Inter-Terminal Access Road, Brotherson Dock, Port Botany
- LGA: Botany Bay
- Capital cost of development: 10
- F/T Construction Jobs: existing staff
- F/T Post Construction Jobs: $350,000
- Approval Authority: Minister for Planning
- Relevant legislation: Schedule 6, Part 1, clause 4(1) Botany of State Environmental Planning Policy (Major Projects) 2005 - Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of consent
- MOD-19-3-2007
- Title: Bulga Underground Coal Mine - Southern Mining Area
- Approved: 1 October 2007
- Proponent: Bulga Coal Management Pty Ltd
- Description: Modification to bring forward mining of the Blakefield seam in the Southern Mining Area and extend and change the alignment of some longwall blocks
- Location: Approximately 12 kilometres southwest of Singleton, one kilometre north of Broke and 1.5 kilometres east of Bulga in the Hunter Valley
- LGA: Singleton l
- Capital cost of development: $45 million
- F/T Construction Jobs: 100
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Major Project Assessments, as delegate of the Minister for Planning
- Relevant legislation: section 96(2) in Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report, Notice of modification
- MOD-63-7-2007 to DA-308-12-2004
- Title: Modification to Coca-Cola Warehouse and Distribution Facility
- Approved: 25 September 2007
- Proponent: Goodman International Limited
- Description: Modification to the development consent for the Coca-Cola warehouse and distribution facility at Minchinbury. The modification involves: reconfiguring the built form; increasing car parking from 250 to 300 spaces; and, ancillary changes such as landscaping and staging of development
- Location: Wallgrove Road, Minchinbury
- LGA: Blacktown
- Capital cost of development: $75.5 million
- F/T Construction Jobs: 150
- F/T Post Construction Jobs: 300
- Approval Authority: Executive Director, Major Project Assessments as delegate of Minister for Planning
- Relevant legislation: section 96(2) of Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of modification approval
- Additional information: Modification application; Statement of Environmental Effects (Appendix 2 - Traffic, Appendix 4 - Noise, Appendix 5 - Building Code of Australia and Appendix 7 - Landscape); architectural drawings and landscape drawing
- DA 73-11-98 MOD 1
- Title: Newstan Colliery - Modification to Longwall 24 and Relocation of Ventilation Shaft
- Approved: 23 September 2007
- Proponent: Centennial Newstan Pty Limited
- Description: This modification involves changes to the approval for mining Longwall 24, and the relocation of a previously approved mine ventilation shaft
- Location: Newstan Colliery, Fassifern, about 25 km southwest of Newcastle
- LGA: Lake Macquarie
- Capital cost of development: $5,227,000
- F/T Construction Jobs: Up to 10
- F/T Post Construction Jobs: Extension of 141 existing jobs
- Details of approval: Director-General's Assessment Report, notice of the modification of consent, consolidated consent (as modified)
- MOD 70-8-2007 to DA 122-5-2002 and MOD 71-8-2007 to DA 211-9-2004
- Title: Manning River Dredging
- Approved: 23 September 2007
- Proponent: Roche Group Pty Ltd
- Description: Approval to reduce the frequency of monitoring and reporting and reduce the membership of the Expert Panel from three to two
- Location: Harrington Waters residential estate at Harrington, about four kilometres upstream of the mouth of the Manning River
- LGA: Greater Taree
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Major Project Assessments, as delegate of the Minister for Planning
- Relevant legislation: Section 96(1A) of the Environmental Planning and Assessment Act 1979
- Details of approval: Assessment Report and notices of modification approval - MOD 70-8-2007 and MOD 71-8-2007
- MOD 78-9-2007-i to DA 495-11-2003-i
- Title: Modification – Port Botany Expansion, Studies
- Approved: 17 September 2007
- Proponent: Sydney Ports Corporation
- Description: Modification to permit an alteration to the timing of various studies
- Location: Lot 2 DP 1009870, Lot 6 DP 1053768, Lots 301 & 302 DP 712992, Part of Crown Reserve R91288, Lots 203 & 205 DP 712991 and Lot 401 DP 816961
- LGA: Botany Bay
- Capital cost of development: N/A
- F/T Construction Jobs: 0
- F/T Post Construction Jobs: 0
- Approval Authority: Executive Director, Major Project Assessments as delegate for the Minister of Planning
- Relevant legislation: Section 96(1) of the Environmental Planning and Assessment Act 1979
- Details of approval: Notice of modification approval and consolidated conditions of consent (as amended)
- MOD 149-12-2006-i to DA 495-11-2003i
- Title: Modification – Port Botany Expansion, Dredging
- Approved: 11 September 2007
- Applicant:Sydney Ports Corporation
- Description: Modification to permit land-based activities associated with dredging to be undertaken at night and to permit dredging activities to be undertaken within specific turbidity limits
- Location: Lot 2 DP 1009870, Lot 6 DP 1053768, Lots 301 & 302 DP 712992, Part of Crown Reserve R91288, Lots 203 & 205 DP 712991 and Lot 401 DP 816961
- LGA: Botany Bay
- Approval authority: Executive Director, Major Project Assessments as delegate for the Minister of Planning
- Relevant legislation: Section 96(1), Part 4 of the Environmental Planning and Assessment Act 1979
- Capital cost of development: N/A
- F/T Construction Jobs: 0
- F/T Post Construction Jobs: 0
- Details of approval: Notice of modification approval and consolidated conditions of consent (as amended)
- MOD 134-11-2006-i to DA 495-11-2003i
- Title: Modification – Port Botany Expansion, Wharf
- Approved: 11 September 2007
- Applicant: Sydney Ports Corporation
- Description: Modification to permit alternative wharf structure design
- Location: Lot 2 DP 1009870, Lot 6 DP 1053768, Lots 301 & 302 DP 712992, Part of Crown Reserve R91288, Lots 203 & 205 DP 712991 and Lot 401 DP 816961
- LGA: Botany Bay
- Approval authority: Executive Director, Major Project Assessments as delegate for the Minister of Planning
- Relevant legislation: Section 96(1), Part 4 of the Environmental Planning and Assessment Act 1979
- Capital cost of development: N/A
- F/T Construction Jobs: 0
- F/T Post Construction Jobs: 0
- Details of approval: Notice of modification approval and consolidated conditions of consent (as amended)
- MOD 107-09-2006-i to DA 495-11-2003i
- Title: Modification – Port Botany Expansion, Minor Corrections
- Approved: 11 September 2007
- Applicant: Sydney Ports Corporation
- Description: Modification to correct various minor errors and misdescriptions and to clarify various conditions
- Location: Lot 2 DP 1009870, Lot 6 DP 1053768, Lots 301 & 302 DP 712992, Part of Crown Reserve R91288, Lots 203 & 205 DP 712991 and Lot 401 DP 816961
- LGA: Botany Bay
- Approval authority: Executive Director, Major Project Assessments as delegate for the Minister of Planning
- Relevant legislation: Section 96(1), Part 4 of the Environmental Planning and Assessment Act 1979
- Capital cost of development: N/A
- F/T Construction Jobs: 0
- F/T Post Construction Jobs: 0
- Details of approval: Notice of modification approval and consolidated conditions of consent (as amended)
- MOD 62-7-2007 to DA 227-9-2004
- Title: Residential Development and Subdivision, Casuarina Beach
- Approved: 3 September 2007
- Proponent: Multiplex Constructions Pty Ltd
- Description: Modification of conditions of approval for the construction and strata subdivision of a three-storey residential flat building consisting of 129 dwellings, café/restaurant, basement car parking for 224 vehicles, construction and dedication of 144 public car parking spaces, roads, pathways and parks
- Location: Lots 29, 30 and 31 DP 1027531 and Part Lot 54 DP 1030322, Tweed Coast Road, Celerywood Drive and Casuarina Way, Casuarina Beach
- LGA: Tweed
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Major Project Assessments, as delegate of the Minister for Planning
- Relevant legislation: section 96 (1A) of the Environmental Planning and Assessment Act 1979
- Details of approval: Planning report and modification of consent conditions
- DA 89-4-2005
- Title: Staged development - open space and public domain works, Walker Street, Rhodes
- Approved: 31 August 2007
- Proponent: Renewing Homebush Bay Pty Ltd
- Description: Staged construction of public domain works including roads, landscaping and stormwater drainage
- Location: Lot 10 DP 1007931, 40 Walker Street, Rhodes (Precinct B)
- LGA: City of Canada Bay
- Capital cost of development: $10,654,919
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Strategic Sites and Urban Renewals, as delegate of the Minister for Planning
- Relevant legislation: Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Planning report and notice of approval and conditions
- DA 8-1-2005 MOD 1
- Title: Whitehaven Coal Mine - Minor Extension of Mining
- Approved: Whitehaven Coal Limited
- Proponent: 22 August 2007
- Description: Minor extension of the Canyon Extension of Whitehaven open cut coal mine. This modification involves an extension of open cut coal mining by 3 hectares and the recovery of an additional 150,000 tonnes of coal and would extend mining activities by two months
- Location: Whitehaven Coal Mine, Hoad Lane, about 30 km northwest of Gunnedah
- LGA: Narrabri
- Capital cost of development: nil
- F/T Construction Jobs: extension of 48 jobs by 2 months
- F/T Post Construction Jobs: $250,000
- Approval Authority: Executive Director, Major Project Assessments as delegate of the Minister for Planning
- Relevant legislation: section 96(1A), Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Assessment report, modification approval and consolidated conditions of consent
- MOD-60-7-2007 to DA 212-09-2004
- Title: Merewether Street, Finger Wharves
- Approved: 22 August 2007
- Proponent: Honeysuckle Development Corporation
- Description: Modification to consent for demolition of four derelict jetties, the construction of finger wharves and the relocation and use of the steel pontoon currently used by the vessel William the Fourth
- Location: Part Lot 51 DP 1036132, Merewether Street finger wharves, Newcastle
- LGA: Newcastle
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Strategic Sites and Urban Renewals as delegate of the Minister for Planning
- Relevant legislation: Section 96 (1A) of the Environmental Planning and Assessment Act 1979
- Details of approval: Planning report, modification of planning consent and consolidated conditions of consent
- MOD-64-7-2007-I to DA 293-08-00
- Title: Modification to consent for a multipurpose terminal on former BHP site, Mayfield
- Approved: 21 August 2007
- Proponent: Regional Land Management Corporation
- Description: Alteration to the layout of the rail line and the stormwater drainage system on the development site
- Location: 'Closure Area' being Lot 221 DP 1013064, Industrial Drive, Mayfield
- LGA: Newcastle
- Capital cost of development: $300 million
- F/T Construction Jobs: 620
- F/T Post Construction Jobs: 310
- Approval Authority: Executive Director, Major Project Assessments as delegate of the Minister for Planning
- Relevant legislation: Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Modification approval and consolidated consent (as modified)
- Additional information: Modification application received 13 July 2007
- MOD 58-6-2007 to DA 208-9-2004
- Title: Modification to 51 lots Subdivision, North Red Head
- Approved: 16 August 2007
- Proponent: Senigroup Pty Ltd
- Description: Amendment to conditions B5, B7 and B8 of the development consent, and insertion of E22, to allow for: a deferred commencement condition, stormwater and drainage works design, minimising impact on Shelly Beach, and public road access
- Location: Red Head Road, North Red Head
- LGA: Greater Taree
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: A/Executive Director, Major Project Assessment as delegate of the Minister for Planning
- Relevant legislation: section 96 (1A) of the Environmental Planning and Assessment Act 1979
- Details of approval: Planning Assessment Report and modification approval
- DA 410-11-2002 MOD 6
- Title: United Collieries - Extension of Haulage of Coal on Public Roads
- Approved: 8 August 2007
- Proponent: United Collieries Pty Ltd
- Description: Extension of temporary haulage of coal on public roads until December 2007 to allow the use of the Wambo Coal Loader, prior to the construction of an internal haul road
- Location: United Colliery, Golden Highway, Warkworth
- LGA: Singleton
- Capital cost of development: $250,000
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: A/Executive Director, Major Project Assessments as delegate of the Minister for Planning
- Relevant legislation: Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Assessment Report, notice of modification of consent and consolidated consent (as modified)
- MOD 32-3-2007 modifying DA 40-7-2006
- Title: Former Beacon Hill High School Site
- Approved: 6 August 2007
- Proponent: Landcom c/o Urbis JHD Pty Ltd
- Description: Demolition of the former Beacon Hill high school buildings, subdivision of 2 super-lots (to be further subdivided into 26 Torrens-titled residential lots with the existing playing fields to remain), associated civil works, construction of access and car park for the playing fields, and public domain works
- Location: 6 Tristram Rd, Beacon Hill
- LGA: Warringah
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Strategic Sites and Urban Renewal as delegate of the Minister for Planning
- Relevant legislation: section 96 (1A) of the Environmental Planning and Assessment Act 1979
- Details of approval: Planning Assessment Report and modification approval
- MOD-48-5-2007 to DA 456-10-2003
- Title: Modification to Mixed Use Development, 27 Wharf Street, Tweed Heads
- Approved: 3 August 2007
- Proponent: Zinkohl Pty Limited
- Description: Modifications to: delete external glass wall between recreation area/gym and outdoor area; incorporate partially enclosed outdoor area within the area to be used as a gym; install glazing/windows to replace shutters/screening to balcony openings and thereby fully enclose the outdoor area; increase overall gross floor space of the development by approximately 224 sq m, by incorporating the outdoor area; provide four partitioned offices for use of gymnasium staff; and carry out alterations and revise layout of associated toilets and change rooms
- Location: 27 Wharf Street, Tweed Heads
- LGA: Tweed
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: A/Executive Director, Major Project Assessments as delegate of the Minister for Planning
- Relevant legislation: section 96 (1A) of the Environmental Planning and Assessment Act 1979
- Details of approval: Planning report, modification of planning consent and consolidated conditions of consent
- MOD 56-6-2007 to DA 148-6-2005
- Title: Residential Subdivision, Moonee Moonee Road, Moonee Beach
- Approved: 2 August 2007
- Proponent: GTS Investments Pty Limited
- Description: Amendment to conditions E2 and E4 of the development consent to allow for the payment of a bank guarantee to council for construction of the collector road on the site instead of construction prior to release of any subdivision certificates
- Location: Moonee Beach Road, Moonee Beach
- LGA: Coffs Harbour
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Major Project Assessment as delegate of the Minister for Planning
- Relevant legislation: Section 96 (1A) of the Environmental Planning and Assessment Act 1979
- Details of approval: Modification approval and conditions
- MOD 49-5-2007
- Title: Modification to Subdivision, Balings Beach
- Approved: 2 August 2007
- Proponent: Barlings Beachside Community Pty Ltd
- Description: Modification to Condition B9 (security bond) of development consent (DA 77-3-2002) granted for a 162 lot subdivision, including the clearing of vegetation, filling, construction of roads and associated infrastructure; provision of conservation zones and open space; and, construction of a bridge
- Location: Lot 2 DP 1016146, George Bass Drive, Barlings Beach, Tomakin
- LGA: Eurobodalla
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: A/Executive Director, Major Project Assessments as delegate of the Minister for Planning
- Relevant legislation: Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Modification approval
- MOD-13-2-2007
- Title: Mineral Separation Plant, Broken Hill
- Approved: 17 July 2007
- Proponent: BEMAX Resources Limited
- Description: Expand the mineral processing capabilities to accommodate additional heavy mineral concentrates to be supplied by the proposed Snapper Mineral Sands Mine; and, revise the staging of the separation of concentrates by adding the rutile and zircon circuits prior to adding the ilmenite circuit
- Location: Southwest outskirts of Broken Hill in western NSW
- LGA: Broken Hill
- Capital cost of development: $5 million
- F/T Construction Jobs: approximately 23
- F/T Post Construction Jobs: approximately 23
- Details of approval: Assessment report and modification approval
- Additional information: Section 96(2) modification to development application DA 345-11-01
- MOD 4-1-2007 to DA 234-5-2003
- Title: Modification to Six-Storey Tourist Facility, Ballina Ramada, Ballina
- Approved: 11 July 2007
- Proponent: Newton Denny Chapelle
- Description: Modification to consent (DA 234-5-2003) as follows: Conditions F15 and G10 to permit the use of function room facilities upon payment of section 94 parking contributions, and include the words '…and/or payment of a section 94 parking contribution at the rate as per Condition B22A for 3.375 spaces'; Condition A2A to allow for deletion of plans for decommissioning of the function room, related to payment of a section 94 parking contribution; Condition A8 to include provision for section 94 parking contribution; and, Condition B22A to include provision for payment of section 94 parking contributions at the rate as per Condition B22A for 3.375 spaces
- Location: Ballina
- LGA: Ballina
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Major Project Assessment as delegate of the Minister for Planning
- Relevant legislation: section 96 (1A) of the Environmental Planning and Assessment Act 1979
- Details of approval: Planning Assessment Report, modification approval and consolidated consent (as amended)
- MOD 35-4-2007 to DA 158-7-2005
- Title: Lee Wharf Stage 3 - Honeysuckle Drive, Newcastle
- Approved: 11 July 2007
- Proponent: Caverstock Group
- Description: Modification to: convert 16 residential units into 12 commercial suites (2,006 sq m); reduce total number of residential units from 86 to 70; add 11 car parking spaces (allocated to commercial suites); increase by 11 sq m the approved gross floor area of 12,711 sq m (achieved through basement extension) to accommodate additional parking; and, amend the dwelling mix, resulting in a greater proportion of two-bedroom units and a reduced proportion of one-bedroom units
- Location: Lots 2, 8, 11 DP 883474, and Lot 51 DP 1036132, Lee Wharf Stage, Honeysuckle Drive, Newcastle
- LGA: Newcastle
- Capital cost of development: $35,359 663
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Strategic Sites and urban Renewals as delegate of the Minister for Planning
- Relevant legislation: section 96 of the Environmental Planning and Assessment Act 1979
- Details of approval: Planning Assessment Report and modification approval
- DA-168-7-2005-i
- Title: Gosford-Wyong Water Supply Desalination Scheme
- Approved: 6 July 2007
- Proponent: Wyong Shire Council
- Description: Construction and operation of a 7,000 megalitre per anum reverse osmosis desalination plant and associated seawater and desalinated water supply works and saline reject water discharge works
- Location: Lot 11 DP 632403, Noraville (Toukley Sewage Treatment Plant site), Lakes Beach (Crown Land) and the road reserves of Budgewoi Road, Wilfred Barrett Drive and Main Road
- LGA: Wyong
- Capital cost of development: $75 million
- F/T Construction Jobs: 80
- F/T Post Construction Jobs: 10
- Details of approval: Director-General's Assessment Report and project approval and conditions
- Additional information: Determined by the Minister under Part 4 of the Environmental Planning and Assessment Act 1979
- MOD 29-3-2007
- Title: Camden Gas Project
- Approved: 4 July 2007
- Proponent: AGL Gas Production (Camden) Pty Ltd
- Description: Construct two surface to in-seam wells (SL08 and SL09), connect the new wells to the existing gas gathering system and produce methane gas
- Location: Menangle Road, Menangle
- LGA: Campbelltown
- Capital cost of development: NA
- F/T Construction Jobs: NA
- F/T Post Construction Jobs: NA
- Details of approval: Director-General's Assessment Report, modification approval and consolidated consent
- Additional information: Modification of development consent for the Camden Gas Project (SL1-SL7) granted by the Minister for Planning on 7 October 2005 (DA 75-4-2005)
- MOD 28-3-2007
- Title: Camden Gas Project
- Approved: 4 July 2007
- Proponent: AGL Gas Production (Camden) Pty Ltd
- Description: Upgrade (twin) existing sections of the gas gathering system
- Location: Glenlee Road, Mount Annan
- LGA: Camden
- Capital cost of development: NA
- F/T Construction Jobs: NA
- F/T Post Construction Jobs: NA
- Details of approval: Director-General's Assessment Report, modification approval and consolidated consent
- Additional information: Modification of development consent for the Camden Gas Project (GL2, GL4, GL6, GL11, EM–1V and EM–1H) granted by the Minister for Infrastructure and Planning on 26 May 2005 (DA 9-1-2005)
- MOD 27-3-2007
- Title: Camden Gas Project
- Approved: 4 July 2007
- Proponent: AGL Gas Production (Camden) Pty Ltd
- Description: Construct one surface to in-seam well (MP30) at an existing well (MP13), connect the new well to the existing gas gathering system and produce methane gas, and upgrade (twin) existing sections of the gas gathering system
- Location: Racecourse Avenue, Menangle Park
- LGA: Campbelltown
- Capital cost of development: NA
- F/T Construction Jobs: NA
- F/T Post Construction Jobs: NA
- Details of approval: Director-General's Assessment Report, modification approval and consolidated consent
- Additional information: Modification of development consent for the Camden Gas Project (MT1-MT10 and MP13-MP17) granted by the Minister Assisting the Minister for Infrastructure and Planning (Planning Administration) on 16 December 2004 (DA 183-8-2004-i)
- MOD 26-3-2007
- Title: Camden Gas Project
- Approved: 4 July 2007
- Proponent: AGL Gas Production (Camden) Pty Ltd
- Description: Construct one surface to in-seam well (EM38) at an existing well (EM20), connect the new well to the existing gas gathering system and produce methane gas, and upgrade (twin) existing sections of the gas gathering system
- Location: Land in the Stage 2 Camden Gas Project area near Menangle and Menangle Park
- LGA: Wollondilly and Campbelltown
- Capital cost of development: NA
- F/T Construction Jobs: NA
- F/T Post Construction Jobs: NA
- Details of approval: Director-General's Assessment Report, modification approval and consolidated consent
- Additional information: Modification of development consent for the Camden Gas Project Stage 2 granted by the Land and Environment Court on 16 June 2004 (DA 282-6-2003-i)
- MOD 25-3-2007
- Title: Camden Gas Project
- Approved: 4 July 2007
- Proponent: AGL Gas Production (Camden) Pty Ltd
- Description: Construct two surface to in-seam wells (KP05 and KP06) at an existing well (KP01), connect the new wells to the existing gas gathering system and produce methane gas
- Location: Remembrance Drive, Menangle (2/594242)
- LGA: Wollondilly
- Capital cost of development: NA
- F/T Construction Jobs: NA
- F/T Post Construction Jobs: NA
- Details of approval: Director-General's Assessment Report, modification approval and consolidated consent
- Additional information: Modification of development consent for the Camden Gas Project (KP1, KP2, KP3) granted by the Minister for Planning on 20 September 2002 (DA 246-8-2002-i)
- MOD 24-3-2007
- Title: Camden Gas Project
- Approved: 4 July 2007
- Proponent: AGL Gas Production (Camden) Pty Ltd
- Description: Construct two surface to in-seam wells (AP02 and AP03) at an existing well (AP01), connect the new wells to the existing gas gathering system and produce methane gas
- Location: Westbrook Road, Cawdor (11/664430)
- LGA: Wollondilly
- Capital cost of development: NA
- F/T Construction Jobs: NA
- F/T Post Construction Jobs: NA
- Details of approval: Director-General's Assessment Report, modification approval and consolidated consent
- Additional information: Modification of development consent for the Camden Gas Project Stage 1 granted by the Minister for Planning on 23 July 2002 (DA 15-1-2002-i)
- DA 104/96 MOD 5
- Title: Newpac No.1 Colliery - Ventilation Fans and Associated Mine Infrastructure
- Approved: 4 July 2007
- Proponent: Resource Pacific Limited
- Description: The modification involves constructing and operating a mine ventilation shaft, ventilation fans and associated mine infrastructure
- Location: Newpac No. 1 Colliery, off the New England Highway, about 24 kilometres northwest of Singleton
- LGA: Singleton
- Capital cost of development: $5,000,000
- F/T Construction Jobs: Up to 10 for a period of 5 months
- F/T Post Construction Jobs: N/A
- Details of approval: Assessment report, modification approval and consolidated approval
- Additional information: Application for modification, Statement of environmental effects
- MOD-22-3-2007
- Title: Supermarket and Ancillary Service, Mullumbimby
- Approved: 27 June 2007
- Applicant: Mallam & Edwards and Musgrave Family Trust
- Description: The modification changes the subdivision to increase the area of Lot 1 and decrease the area of Lot 2 and makes minor modifications to the internal layout of the supermarket
- Location: Station Street, Mullumbimby
- LGA: Byron
- Capital cost of development: $3.5 million
- F/T Construction Jobs: 15-20
- F/T Post Construction Jobs: 20 full-time, 38 part-time and 70 casual equivalent sales jobs
- Details of approval: Assessment report, modification approval and consolidated consent
- Additional information: Modification to the development consent (DA 32-4-2006) granted by the Minister for Planning on 6 November 2006
- DA 242-10-2004
- Title: Rural Residential Subdivision, Winchelsea Way
- Approved: 22 June 2007
- Proponent: Darryl Anderson Consulting
- Description: of two existing lots into 17 community title rural residential lots, with lots 1 to 15 ranging in size from 4,000m2 to 7,446m2. There are two existing dwellings - on proposed Lot 4 (adjacent to Terranora Road) and proposed Lot 17. Roads and infrastructure works to support the subdivision are proposed, as are earthworks, filling of a dam and modification of a second dam for use as on an onsite stormwater detention basin
- Location: Lot 1 DP595863 and Lot 3 DP 819065, Winchelsea Way, Terranora
- LGA: Tweed
- Capital cost of development: $1,000,000
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Major Project Assessments as delegate of the Minister for Planning
- Relevant legislation: Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Planning Report and notice of approval and conditions
- DA 150-6-2005
- Title: Residential, Tourist and Retail Development, Ulladulla
- Approved: 14 June 2007
- Proponent: Elderslie Property Investments Pty Ltd
- Description: Demolition of all structures on the main body of the site; erection of 5 buildings to contain 8 retail shops, 74 serviced apartments for tourist accommodation and 25 residential apartments (3 x studio, 12 x 1 bedroom and 10 x 2 bedroom) over basement parking for 145 vehicles
- Location: Lot 21 in DP 738247, Lots 8 and 9 in DP37939, Lot 4 in DP 542007, Lot 9 in DP 21597 and Lots 1 and 2 in DP 21957, 133-137 Princes Highway, Ulladulla
- LGA: Shoalhaven
- Capital cost of development: $24,620,000
- F/T Construction Jobs: 15
- F/T Post Construction Jobs: 4
- Details of approval: Director-General’s Planning Report and Project approval and conditions
- MOD-21-3-2007
- Title: Modification - Tritton Copper Mine
- Approved: 12 June 2007
- Proponent: Tritton Resources Limited
- Description: To construct and operate a temporary waste dump for non acid forming waste rock
- Location: Near Hermidale, 45 kilometres north-west of Nyngan
- LGA: Bogan Shire
- Capital cost of development: NA
- F/T Construction Jobs: NA
- F/T Post Construction Jobs: NA
- Details of approval: Assessment report, modification approval and consolidated consent
- Additional information: Section 96(1A) Modification (MOD-21-3-2007) to the development consent (DA No. 41/98) granted by the Minister for Urban Affairs and Planning on 1 September 1999
- MOD 141-12-2006 to DA 80-4-2004
- Title: Retail/commercial office buildings and associated works
- Approved: 5 June 2007
- Proponent: Urbis JHD
- Description: A project to construct three retail/commercial office buildings, subdivide the land into four separate parcels, and associated basement parking, landscaping and public improvement works. The modification involve a number of minor design and facade modifications to Building 5 and the Pavilion Building, including a minor 4.6m2 extension to the ground floor at the north-western corner of the building, to ensure consistency with the levels above
- Location: Part Lot 79 DP 875562, Lot 50 DP 104552 and Lot 6002 DP 1063407 - Sites 5, 6, and 7 Dawn Fraser Avenue, Sydney Olympic Park
- LGA: Auburn
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Strategic Sites and Urban Renewal as delegate of the Minister for Planning
- Relevant legislation: Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Planning report and modification approval
- MOD 14-2-2007
- Title: Yacht Club, Honeysuckle Waterfront
- Approved: 28 May 2007
- Proponent: Newcastle Cruising Yacht Club
- Description: Modification to allow construction in three stages: Stage 1 - club lounge, bar, office and poker machine area to the ground floor along with the office/commercial space above the first floor; Stage 2 - restaurant and kitchen facilities with completion of the first floor office/commercial space above; and, Stage 3 - second floor club facility/commercial area
- Location: Lot 102 and 103 DP 1015391, 91 Hannell Street, Wickham
- LGA: Newcastle
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Details of approval: Director-General's Assessment Report and modification approval
- Additional information: Modification pursuant to sections 81 and 96(1A) to development application (DA 102-5-2004) granted by the Minister for Planning on 21 April 2005
- MOD 30-3-2007
- Title: Modification - Langley Heights Quarry
- Approved: 28 May 2007
- Applicant: Oberon Quarries Pty Ltd
- Description: Change the Section 94 Contributions - Road Levy for maintenance/repair of public roads
- Location: Shooters Hill Road, Langley Heights
- LGA: Oberon
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Details of approval: Notice of Modification of Consent , Consolidated Consent and Assessment Report
- MOD-41-5-2007i to DA 134-04-00
- Title: Modification – Ridgeway Project
- Approved: 23 May 2007
- Proponent: Cadia Holdings Pty Limited
- Description: Use the applicant’s existing entitlements to secure more water from the Belubula River
- Location: Near Orange in the Central West region of NSW
- LGA: Blayney and Cabonne
- Capital cost of development: NA
- F/T Construction Jobs: NA
- F/T Post Construction Jobs: NA
- Details of approval: Planning report, modification approval and consolidated consent
- Additional information: Section 96(1A) modification to the development consent granted by the Minister for Urban Affairs and Planning on 3 October 2000
- MOD-45-5-2007 to DA 44/95
- Title: Modification – Cadia Hill Gold Mine
- Approved: 23 May 2007
- Proponent: Cadia Holdings Pty Limited.
- Description: Extract more groundwater onsite by relocating and increasing the rate of ground water extraction; and suspend releases from Cadiangullong Dam for up to seven months
- Location: Near Orange in the Central West region of NSW
- LGA: Blayney and Cabonne
- Capital cost of development: NA
- F/T Construction Jobs: NA
- F/T Post Construction Jobs: NA
- Details of approval: Planning report, modification approval and consolidated consent
- Additional information: Section 96(1A) modification to the development consent granted by the Minister for Urban Affairs and Planning on 6 September 1996
- MOD 23-3-2007 to DA 32-1-2003
- Title: 'Magenta Shores' Integrated Tourist Facility
- Approved: 22 May 2007
- Proponent: Mirvac Projects Pty Ltd
- Description: Approval to modify condition of consent no. 47 of an integrated tourist facility to allow ownership of small dogs within the constraints stated in the modified condition of consent
- Location: Lot 632 and 633 DP 823717, Lot 650 DP 1017542; 300 Wilfred Barrett Drive, Magenta, The Entrance North
- LGA: Wyong
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Major Project Assessments as delegate of the Minister for Planning
- Relevant legislation: Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Modification approval and conditions; Conditions of keeping of dogs, Magenta Shores Estate
- MOD 9-1-2007
- Title: Coastal Subdivision, Palmers Island
- Approved: 22 May 2007
- Proponent: Laterals Planning
- Description: Modification to remove the requirement for kerb and gutter and full road width construction. Instead, the road design shall be in accordance with water sensitive urban design principles, any requirements of Clarence Valley Council and consistent with existing roads in Palmers Island Village, which provide grassed drainage swales. Modification also to remove the requirement for underground electricity supply, and provide overhead electricity instead
- Location: Lot 13 Section 4 DP 2107, Lots 13 and 14 Section 1 DP 2107 Wentworth Street and Gordon Street, Palmers Island
- LGA: Clarence Valley
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Details of approval: Director-General's Assessment Report and modification approval
- Additional information: Section 96(1A) modification to development application (DA 217-11-2004) granted by the Minister for Planning on 5 March 2006
- DA 7-1-2007
- Title: Batlow Health Facility
- Approved: 22 May 2007 (by delegate of the Minister)
- Applicant: Health Administration Corporation
- Description: Approval for a multi-purpose health care facility and associated works
- Location: Pioneer Street, Batlow (Lot 3 DP 365930)
- LGA: Tumut
- Capital cost of development: NA
- F/T Construction Jobs: NA
- F/T Post Construction Jobs: NA
- Details of approval: Instrument of Approval, Planning Assessment Report, Section 79C Evaluation
- MOD 18-3-2007 to DA 12-1-2005
- Title: Subdivision by Boundary Adjustment and Erection of Dwelling - Modification
- Approved: 14 May 2007
- Proponent: Hill Thalis Architects on behalf of San Marco Investments Pty Ltd
- Description: The proposed modification is for minor alterations to the building design, reinstatement of a dry stone wall and additional water tanks
- Location: Lots 12 and 13 DP 579733, Princes Highway, Kiama Heights
- LGA: Kiama
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Approval Authority: Executive Director, Major Project Assessments, as delegate for the Minister for Planning
- Relevant legislation: Section 96 (1A), Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Planning Assessment Report, modification approval and conditions
- DCP 2-3-2007
- Title: Development control plan for coastal subdivision, Batemans Bay
- Approved: 14 May 2007
- Applicant: BHI Architects
- Description: Adoption of development control plan for a six lot subdivision in accordance with State Environmental Planning Policy No. 71 – Coastal Protection
- Location: Lots 1-4 DP 259941, Lot 1A DP 23086 & Lot 12 DP 251705 Beach Road, Batemans Bay
- LGA: Eurobodalla
- Capital cost of development: NA
- F/T Construction Jobs: NA
- F/T Post Construction Jobs: NA
- Details of approval: Notice of Determination
- MOD 151-12-2006 to DA 80-4-2004
- Title: Retail/commercial office buildings and associated works
- Approved: 10 May 2007
- Proponent: Urbis JHD
- Description: The project involves the construction of three retail/commercial office buildings, subdivision of land into four separate parcels, associated basement parking, landscaping and public improvement works. The modification is to:
- increase the maximum retail tenancy area ‘first use’ approvals from 120sqm to 260sqm for Building 5
- allow the Pavilion Building to be used by a single retail tenant
- allow trading until 1.00 am, 7 days a week
- Location: Part Lot 79 DP 875562, Lot 50 DP 104552, Lot 6002 DP 1063407 - Sites 5, 6, and 7 Dawn Fraser Avenue, Sydney Olympic Park.
- LGA: Auburn
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Details of approval: Notice of determination and Planning Report
- MOD 11-2-2007
- Title: Stage 2 of the Camden Gas Project
- Approved: 2 May 2007
- Applicant: AGL Gas Production (Camden) Pty Ltd
- Description: Relocation of internal access road to the Rosalind Park Gas Plant
- Location: Rosalind Park, Medhurst Road, Menangle (Lot 2 DP 622362/Lot 35 DP 230946
- LGA: Campbelltown
- Capital cost of development: NA
- F/T Construction Jobs: NA
- F/T Post Construction Jobs: NA
- Details of approval: Notice of Modification of Consent , Consolidated Consent and Assessment Report
- MOD-148-12-2006-i
- Title: Ginkgo Mineral Sands Mine Section 96(2) Modification
- Approved: 16 April 2007
- Applicant: BEMAX Resources Limited
- Description: The Ginkgo Mineral Sands Project was approved by the Minister for Planning on 30 January 2002. The proposed modification to the development consent involves:
- extension of the existing dredge pond;
- extension of the existing initial sand residue dam;
- addition of a secondary overburden emplacement and soil stockpiles; and
- treatment of process water in a series of water treatment dams or in the sand residue dam.
- Location: 40 kilometres west of Pooncarie in western NSW, on Mining Lease 1504.
- LGA: Wentworth
- Details: Planning Report, Instrument of Consent
- Documents available: Application to modify a development consent, Statement of Environmental Effects
- MOD 86-7-2006 modifying DA 80-4-2004
- Title: SITES 5, 6 & 7 SYDNEY OLYMPIC PARK
THREE COMMERCIAL/RETAIL OFFICE BUILDINGS, SUBDIVISION OF LAND INTO FOUR SEPARATE PARCELS AND ASSOCIATED WORKS
- Approved: 29 March 2007
- Applicant: Bovis Lend Lease
- Description: MOD 86-7-2006 to modify DA 80-4-2004 as follows:
- increase the height of buildings 6 and 7 from six (6) to eight (8) storeys;
- new all level atriums to buildings 6 and 7;
- The two additional levels will result in a Gross Floor Area (GFA) of 16,329 sqm on Site 6 and 21,769 sqm on Site 7 representing an increase in GFA of 4,454 sqm on Site 6 and 5,631 sqm on Site 7 respectively.
- Increasing the number of basement car parking spaces from 717 to 805 spaces;
- Increase the site area of each of Buildings 6 and 7 by approximately 96 sqm with the resultant narrowing of Park Avenue from 12.5 metres (kerb to kerb) to 6.5 metres (kerb to kerb);
- Opening Park Street to through traffic with the deletion of the traffic barrier on the northern side of the street;
- Relocation of the loading facilities from the Park Street frontage to Herb Elliot Avenue;
- Two 5.2 metre wide double storey aerial pedestrian bridges between building 6 and 7 at levels 2/3 and 6/7 respectively;
- reconfiguration of the approved ground floor retail floor plates;
- Minor changes to the facade including additional sun shading devices, incorporation of full height atrium glazing, modified treatment to the spandrels and addition of metal framing elements.
- Location: Part Lot 79 DP 875562, Lot 50 DP 104552, Lot 6002 DP 1063407 - Sites 5, 6, and 7 Dawn Fraser Avenue, Sydney Olympic Park.
- LGA: Auburn
- Details: Notice Of Determination & Planning Report
- MOD 8-1-2007 modifying DA 157-6-2004
- Title: Construction and fitout of a technology orientated corporate complex
- Approved: 12 March 2007
- Applicant: Stockland Development Pty Ltd
- Description: MOD 8-11-2007 to modify DA 157-6-2004 in the following manner:
To modify the conditions requiring the gazettal of the purchase of Paul Street North, and the subsequent conditions requiring the consolidation of the lots; and the registration of easements.
Modified conditions are:
B1 - Paul Street North, and
B38 - Consolidation of Lots.
F7 - Registration of Easements,
E2 - Stormwater.
- Location: 1-11 Lyonpark Road, 25-37 Paul Street North, 107 Epping Road & 16-20 Giffnock Ave, North Ryde.
Lot 51-52, DP 564301; Lot 1-2, DP455952; Lot C1, DP 377649; Lot 2, DP 655022; Lot 2, DP880284; Part Lot 3, DP 563085.
- LGA: City of Ryde Council
- Details: Notice Of Determination & Planning Report
- MOD 1-1-2007 modifying DA 210-9-2004
- Title: Two storey tourist facility and strata subdivision of three lots
- Approved: 7 March 2007
- Applicant: Nash Developments Pty Ltd
- Description: MOD 1-1-2007 to modify DA 210-9-2004 the following manner):
- amend condition A2 regarding approved plans of the development.
- delete condition B2 and insert new condition B2A regarding details of materials, colours and finishes.
- Location: Lot 6 Section 3 DP 759113
14 Hofmeier Close Woolgoolga
- LGA: Coffs Harbour City Council
- Capital cost of development: $1,050,000 for complete development
- F/T Construction Jobs: 10
- F/T Post Construction Jobs: N/A
- Details: Notice Of Determination & Planning Report
- MOD 136-11-2006 to modify DA 43-2-2004
- Title: Sydney Opera House - upgrade and refurbishment of western broadwalk and western foyer, Bennelong Point, Sydney
- Approved: 7 March 2007
- Applicant: Sydney Opera House Trust
Bennelong Point, Sydney
- Description:
- Construct a new access corridor, door opening and lift lobby to provide access from the Lower Concourse to the Bennelong Lift;
- Construct new toilets in the Exhibition Hall; and
- Undertake minor amendments to the design and layout of the Western Foyer.
- Location: Lot 4 DP7879333 and Lot 5 DP775888.
2 Circular Quay and Macquarie Street, Bennelong Point, Sydney Opera House
- LGA: City of Sydney
- Capital cost of development: $3.5 million
- F/T Construction Jobs: 25
- F/T Post Construction Jobs: N/A
- Details: Notice Of Determination & Planning Report
- DA 172-7-2004_MOD2
- Title: Werris Creek Coal Mine – Relocation of Aboriginal grinding grooves – 'Narrawolga Site'
- Approved: 6 March 2007
- Applicant: Werris Creek Coal Pty Ltd
- Description: The modification involves the temporary removal, secure storage, and subsequently replacement of the ‘Narrawolga Site’, which consists of a series of Aboriginal grinding grooves incised in sandstone rock, located close to the western perimeter of the Werris Creek open cut coal mining area; and mining an additional 280,000 tonnes of coal and moving about 1.34 million bank cubic metres of overburden
- Location: Werris Creek Coal Mine, off the Quirindi Road, about four kilometres south of Werris Creek
- LGA: Liverpool Plains
- Capital cost of development: N/A
- F/T Construction Jobs: N/A
- F/T Post Construction Jobs: N/A
- Details of approval: Notice of modification of consent, Assessment Report and consolidated consent
- DA 437-12-2002-i MOD-115-9-2006-i
- Title: Modifications to the methodology for the remediation of the Lednez Site, Rhodes and parts of Homebush Bay
- Approved: 26 February 2007
- Proponent: Thiess Services Pty Ltd
- Description: The remediation modifications involve:
- modification of the methodology to remove sediments from the bay
- extension of the footprint of sediment removal works in the bay
- changing the treatment method from indirect thermal desorption to direct thermal desorption technology
- modification to the location of the thermal plant and pre-treatment building
- upgrade of the emissions control efficiency for the pre-treatment building
- provision of an enclosure over the waste storage unit
- Location: Former Union Carbide site at 40 Walker Street, Rhodes (Lot 10, DP 1007931) and parts of the bed of Homebush Bay (part residual lands comprised in Certificate of Title Vol. 5018, Fol. 1)
- LGA: Canada Bay
- Relevant legislation: Part 4 of the Environmental Planning and Assessment Act 1979
- Capital cost of development: $4,800,000
- F/T Construction Jobs: 2
- F/T Post Construction Jobs: 2
- Details of approval: Modification approval; original consent showing approved changes; Director-General’s Assessment Report
- Additional information: Ricardo Prieto-Curiel (02) 9228 6112
- SCA 08-11-2006 of DA 18-2-2005
- Title: Determination of Subdivision Certificate
- Approved: 21 February 2007
- Applicant: Renewing Homebush Bay Pty Ltd on behalf of owner NSW Maritime
- Description: Issue of subdivision certificate for stages 1 & 2
- Location: 40 Walker Street, Rhodes
- LGA: Canada Bay >
- Details: Notice Of Determination & Planning Report
- DA Number: DA 309-11-2001
Modification Number MOD 130-11-2006 5
- Title: Ashton Coal Mine - Pipelines for Offsite Tailings Emplacement
- Approved: 19 February 2007
- Applicant: Ashton Coal operations Pty Limited
- Description: The modification involves:
- Exporting coal tailings to the former Ravensworth mine by pipeline;
- Constructing and operating a range of associated pipeline infrastructure between the 2 mines; and
- Allowing water sharing between the Ashton and Newpac mines, as well as temporary offsite storage of stormwater from the Ashton mine at the former Ravensworth mine.
- Location: Ashton and Ravensworth coal mines, adjacent to the New England Highway, 14 to 18 kilometres north of Singleton.
- LGA: Singleton
- Details: Notice of Modification of Consent, Assessment Report and Consolidated Consent.
- DA Number: DA 23-98
Modification Number: DA 23-98-MOD 2
- Title: Stratford Coal Mine - Proposed Roseville West Pit
- Approved: 16 February 2007
- Applicant:Stratford Coal Pty Limited
- Description: The modification involves:
- Extending open cut coal mining operations to the west of the existing Roseville Pit to recover an additional 0.7 million tonnes of ROM coal at a rate of about 0.25 million tonnes a year;
- Constructing a noise/flood bund adjacent to the pit;
- Using existing mining equipment and infrastructure to mine, process and transport coal from the pit; and
- Progressively rehabilitating the disturbed area.
- Location: Stratford Coal Mine, The Bucketts Way, Stratford
- LGA: Gloucester
- Details: Notice of Modification of Consent, Assessment Report, Response to Submissions and Consolidated Consent.
- DA 104/96 MOD 3
- Title: Newpac Colliery Section 96(1A) Modification
- Approved: 11 February 2007
- Applicant: Resource Pacific Limited
- Description: Approval was provided for:
- Construction and operation of a 33kV/11kV substation
- Location: Newpac Colliery, 24 kilometres north-west of Singleton
- LGA: Singleton
- Details: Notice of Modification, Assessment Report, Consolidated consent
- DA 104/96 MOD 4
- Title: Newpac Colliery Section 96(1A) Modification
- Approved:11 February 2007
- Applicant: Resource Pacific Limited
- Description: Approval was provided for:
- Construction of an hydraulic fluid (solcenic oil) borehole
- Construction of two hydraulic fluid storage tanks
- Construction of a concrete borehole
- Location: Newpac Colliery, 24 kilometres north-west of Singleton
- LGA: Singleton
- Details: Notice of Modification, Assessment Report, Consolidated consent
- DA Number: DA 410-11-2002
Modification Number: MOD 127-10-2006
- Title: United Collieries-Proposed Extension of Haulage of Coal on Public Roads
- Approved: 11 February 2007
- Applicant: United Collieries Pty Ltd
- Description: Extension of temporary haulage of coal on public roads until July 2007 to allow the use of the Wambo Coal Loader, prior to the construction of an internal haul road
- Location: United Colliery, Golden Highway, Warkworth
- LGA: Singleton
- Details: Notice of the modification of consent, Assessment Report and Consolidated Consent.
- MOD 7-1-2007
- Title: Section 96(1) Modification - Warkworth Coal Mine
- Approved: 2 February 2007
- Applicant: Warkworth Mining Limited
- Description: Modification of the Lot and DP Schedule to correct omissions and misdescriptions
- Location: 12 kilometres southwest of Singleton
- LGA: Singleton
- Details: Notice of Modification, Assessment Report, Consolidated Consent
- DA 205-7-2003 MOD 6
- Title: Wambo Coal Mine Section 96(2) Modification - North Wambo Creek Diversion and Gas Drainage
- Approved: 25 January 2007
- Applicant: Wambo Coal Pty Ltd
- Description: The approval involves:
- the staged construction of the North Wambo creek diversion;
- construction of a temporary pipeline along sections of North Wambo Creek above the North Wambo underground mine where the depth of cover is less than 100m; and
- construction of gas drainage and dewatering infrastructure for the North Wambo Underground mine.
- Location: 15 kilometres west of Singleton
- LGA: Singleton
- Details: Notice of Modification, Assessment Report, Consolidated Consent
- DA 262-09-01 MOD 121-10-2006
- Title: Bald Hill Quarry - Proposed Revision of Environmental Monitoring Requirements
- Approved: 24 January 2007
- Applicant: Applicant is Bald Hill Quarry Pty Ltd
- Description: Removal of redundant environmental monitoring conditions from the conditions of consent for the Bald Hill Quarry and Regional Landfill
- Location: Hume Highway Jugiong
- LGA: Harden
- Details: Notice of the modification of consent, Consolidated Consent and Assessment Report
- DA 158-7-2005
- Title: CONSTRUCTION OF BUILDINGS A3, A4/A5, A6 - KNOWN AS STAGE 3 LEE WHARF DEVELOPMENT
- Approved: 24 January 2007
- Applicant: Caverstock Group
- Description: Development consent is granted only to carrying out of a mixed use development consisting of 4 multi-storey buildings (2 are interconnected) and other facilities, comprising Buildings A3 to A6 known as Stage 3 of the Lee Wharf Developments, as described in detail below:
- Building A3: single storey glazed pavilion development comprising 354 sq m retail floor space;
- Building A4 / A5: 5 - 7 storey (interconnected building) mixed use development comprising 46 residential apartments and 1,071 sq m retail floor space;
- Building A6: 7 storey mixed use development comprising 40 residential apartments and 686 sq m of retail floor space;
- Off-street car parking for 164 vehicles located in a common basement structure generally extending below Buildings A4-A6;
- Associated road works generally comprising re-alignment of the existing kerb and guttering and construction of footpath paving across the frontage of the site, reconfiguration of a portion of Worth Place and the median strip, and provision of a pedestrian crossing along Honeysuckle Drive; and
- Subdivision 5 stratum lots, 110 strata lots (86 residential lots, 13 retail lots, 2 car space lots and 9 utility lots)
- Location: Lots 2, 8 and 11 DP 883474, Lot 51 DP 1036132. Honeysuckle Drive, Newcastle.
- LGA: Newcastle
- Capital cost of development: $35,359,663
- F/T Construction Jobs: 221
- F/T Post Construction Jobs: 48
- Details: Notice Of Determination & Planning Report
- MOD 89-7-2006 modifying DA 54-3-2004
- Title: Mixed Use Development Comprising Thirty Two (32) Residential Units, Forty Seven (47) Serviced Apartments and Commercial Development.
- Approved: 23 January 2007
- Applicant: Forbes Rigby Pty Ltd
- Description: MOD 89-7-2006 to modify DA 54-3-2004 in the following manner. Modification proposed includes the following:
- stairwell from basement to fourth floor,
- design of basement parking,
- inclusion of garbage and recycling areas
- electrical substation pump and switch room
- layout details for reception area
- gym room
- building setback to southern boundary
- Location: Lot 1 and Lot 202 DP 743509 Meares Place, Kiama
- LGA: Kiama Municipal Council
- Details: Notice Of Determination & Planning Report
- DA 95-4-2005
- Title: "Hub" Regional Resource Reprocessing Facility, Molong
- Approved: 15 January 2007
- Applicant: Orange City Council
- Description: Construction and operation of a waste facility and associated infrastructure.
- Location: Cnr Euchareena Road and Shades Creek Road, Molong
- LGA: Cabonne
- Capital cost of development: $15.5 million
- F/T Construction Jobs: 5
- F/T Post Construction Jobs: 5
- Details: Instrument of Consent, Director-General's Report
- 135-11-2006
- Title:
- Approved: 10 January 2007
- Applicant: Mark Holland & Nook Parker
- Description: MOD 135-11-2006 to modify DA 13-1-2005 in the following manner:
Omit condition D1 of DA 13-1-2005 and replace with condition D1A.
Condition D1A relates to the revised Bushfire Assessment dated 13 June 2006.
- Location: Lot 101 DP776881, Grandfathers Gully Road, Lilli Pilli
- LGA: Eurobodalla Shire Council
- Details:
- DA 39-7-2006
- Title: Construction of four bedroom single dwelling and access road
- Approved: 10 January 2007
- Applicant: NSW Roads and Traffic Authority
- Description: Construction of a four bedroom, single storey dwelling house and construction of a new access road to the site from Wakehurst Parkway.
- Location: Lot 101, DP 719870 Wakehurst Parkway, Oxford Falls
- LGA: Warringah Council
- Capital cost of development: $690,000.00
- F/T Construction Jobs:
- F/T Post Construction Jobs:
- Details: Notice Of Determination & Planning Report
|