Register of major projects
The Department of Planning assesses major projects that need the approval of the Minister for Planning. The following is a register of projects (being) processesed under the Part 3A of the Environmental Planning and Assessment Act.
Television Production Studio and Office Complex at the Australian Technology Park (MP 06_0149)
Documents available
Director General's Report - Concept Plan
Director General's Report - Early Works
Instrument - Conditions of Approval - Concept Plan
Instrument - Conditions of Approval - Early Works
Major Projects Application Form
ATP Vol 1 (RTF)
ATP Vol 2 Plans
Director General's Requirements
1. Concept Plan
- Appendix A Draft Leave Survey Plan
- Appendix A Site Survey
- Appendix B and S, Architectural Shadows
- Appendix C Application Form
- Appendix D Clause 6
- Appendix E Director General Requirements
- Appendix F Traffic Report
- Appendix G Landscape Concept
- Appendix H Satellite Dish Examples
- Appendix I Engineering Services Report
- Appendix J Waste Management Plan
- Appendix K BCA Preliminary Report
- Appendix L Heritage Impact Assessment
- Appendix M Archaeological Report
- Appendix N Stormwater PlanSW1
- Appendix N Stormwater PlanSW2
- Appendix N Stormwater Sept05 Report
- Appendix N Stormwater Amendment
- Appendix O Acid Sulfate Soil Management
- Appendix O Remediation Action Plan
- Appendix P Acoustic Report
- Appendix Q Statement of Architectural Intent
- Appendix R Wind Environment Statement Report
- Appendix T Access Reprot
- Appendix U Advice from Sydney Ports
- Appendix U Sydney Ports
- Appendix V State Rail
- Appendix W Quantities
- Appendix X ESD Report1
- Appendix Y Approved Road Layout RWA
- ATP Seven Concept Plan
- Locality Plan ATP-Seven Concept Plan
2. Project Plan Application - Early Works
- Appendix A Excavation Plans and Sections
- Appendix B Application Form
- Appendix C Clause 6 (SEPP) Determination
- Appendix D Early Works
- Appendix E Draft Lease Survey Plan
- Appendix E Site Survey
- Appendix F Extract Traffic Report Chapter 6
- Appendix F Traffic Construction Management Plan
- Appendix G Remediation Action Plan
- Appendix G Acid Sulphate Soil MP_44050
- Appendix H construction Management Plan
- Appendix I Archaeological Research Design
- Appendix I Archaeological Recommendation
- Appenix I Heritage Impact Assessment
- Appendix J Bulk Earthworks Stormwater Management
- Appendix K Ground Water Advice
- Appendix L Accoustic Advice
- Appendix L Acoustic Advice Construction
- Appendix M RailCorp Consultation
- Appendix N Quantity Survey
- Appendix O ESD Report1
- ATP Early Works
- Locality Plan ATP Seven Concept Plan
- Acoustic report update
- Advice from railcorp electrolysis
- Statement of architectural intent
- BCA report
- Department of Planning Environmental Assessment of Concept Plan
- Existing easements survey
- Floor space area schedule
- Height compliance 01
- Height compliance 02
- Height compliance 03
- Height compliance 04
- Landscaping character images
- Landscaping PA report
- Landscaping park concept elevation
- Landscaping park concept plan
- Landscaping plant images
- Landscaping plaza concept elevation
- Landscaping plaza concept plan
- Drawing list
- Site plan
- Plan level 1
- Plan level 1M
- Plan level 2
- Plan level 3
- Plan level 4
- Plan level 5
- Plan level 6-12
- Plan roof
- Section a-ab-b c-c
- Section d-d e-e
- Section f-f
- Elevation north
- Elevation South
- Elevation East West
- Photomontage Davy Road
- Photomontage Central Ave
- Photomontage locomotive
- Photomontage carriage workshop
- Site contamination advice
- ATP Seven preferred project report
- Wind environment study 2
