The Department of Planning assesses major projects that require the approval of the Minister for Planning. The assessment process for the following project is in accordance with the Part 3A of the Environmental Planning and Assessment Act 1979.
Project: Redfern Community Health Centre (MP 07_0011)Proponent: Health Administration Corporation (NSW Health)
Description: Demolition of the former Redfern police station building, adaptive reuse of the former Redfern courthouse building and construction of a three-storey building with one level of basement car parking for the purposes of a community health centre
Location: Lots 3 & 4 in DP 2051, 103-105 Redfern Street, Redfern
LGA: City of Sydney
Project application and preliminary documents
- Major Project Application (8 February 2007)
- Preliminary Environmental Assessment (January 2007)
- Redfern Courthouse and Police Station - Heritage Opportunities and Constraints (January 2007)
- Redfern Community Health Centre - Drawings (December 2006)
- Traffic and Parking Report (December 2006)
- Director-General's requirements for Environmental Assessment (issued 27 February 2007)
Environmental Assessment documents
- Environmental Assessment (Main Report)
- Cover Letter to Department of Planning
- Revised Cover Letter to Department of Planning
- Statement of Design Excellence
- Major Project Application Form
- Appendices
- Appendix A - Cover Sheet for Architectural Drawings
- Appendix A Existing/Demolition Plan
- Appendix A - Basement Floor Plan
- Appendix A - Upper/Lower Ground Floor Plan
- Appendix A - Level 1 Floor Plan
- Appendix A - Level 2 Floor Plan
- Appendix A - Roof Plan
- Appendix A - North South Section
- Appendix A - South West Elevation
- Appendix A - North East Elevation
- Appendix A - Shadow Diagram 9am
- Appendix A - Shadow Diagram 12pm
- Appendix A - Shadow Diagram 3pm
- Appendix A - Site Analysis Plan
- Appendix A - Photo Montage - Turner Street
- Appendix A - Elevation Shadow 3pm
- Appendix A - Elevation Shadow 12pm
- Appendix A - Elevation Shadow 9am
- Appendix B - Site Survey and Report
- Appendix C - Car Turning Path Sheet 1
- Appendix C - Car Turning Path Sheet 2
- Appendix C - Car Turning Path Sheet 3
- Appendix C - Traffic and Parking Report, Executive Summary
- Appendix C - Traffic and Parking Study
- Appendix C - Turning Path Option A
- Appendix C - Turning Path Option B
- Appendix D - Letter from Sydney Water
- Appendix E - Geotechnical Investigation
- Appendix F - Heritage Impact Statement
- Appendix G - Aboriginal Archaeology Assessment
- Appendix I - Director-General's Requirements
- Appendix J - Phase 1 Environmental Site Assessment
- Appendix J - Register of Hazardous Materials Report
- Appendix K - Transport Access Plan Examples
- Appendix L - Letter from Department of Planning relating to RWA Contributions Plan Exemption
- Appendix M - Safety and Security Policy and Procedures