Project: Remediation and Transitional Works - Former CUB Site, Broadway (MP 07_0163)
Proponent: Frasers Greenway Development Pty Ltd
Description: Works involving the remediation of contaminated soil and groundwater on site; demolition of existing basements and other existing structures and removal of piles not previously demolished or removed; permanent stabilization and protection of heritage buildings, retained structures and in-ground services infrastructure to Balfour and Irving streets; and archaeological investigation
Location: 26 Broadway, Chippendale (former Carlton and United Breweries site) and adjacent surrounding properties fronting onto Broadway, Kensington Street, Wellington Street, O'Connor Street and Abercrombie Street
Local government area: City of Sydney
Project application and preliminary documents
- Preliminary assessment with plans ( building identification, areas of potential contamination, site remediation staging)
- Director-General's requirements for Environmental Assessment
- Refer also: concept plan (MP 06_0171) determination - notice of approval and conditions (9 February 2007), and statement of commitments
Environmental assessment documents
(Publicly exhibited 24 April to 23 May 2008)- Environmental Assessment - Main Report
- Appendices
- Appendix A - Site Analysis and Survey Plans - Land Use Plan
- Appendix A - Site Analysis and Survey Plans - Existing Buildings
- Appendix A - Site Analysis and Survey Plans - Existing Building Heights
- Appendix A - Site Analysis and Survey Plans - Existing Road Widths
- Appendix A - Site Analysis and Survey Plans - Surveyors Report
- Appendix B - Remedial Action Plan - Main Report
- Appendix B - Remedial Action Plan - Geotechnical Cross Section AA
- Appendix B - Remedial Action Plan - Geotechnical Cross Section BB
- Appendix B - Remedial Action Plan - Geotechnical Cross Section CC
- Appendix B - Remedial Action Plan - Geotechnical Cross Section DD
- Appendix B - Remedial Action Plan - Geotechnical Cross Section EE
- Appendix B - Remedial Action Plan - Hydrogeological Design/Justification for Groundwater Drain (Appendix D)
- Appendix B - Remedial Action Plan - Land Use Chapter, Concept Plan EAR (October 2006)
- Appendix B - Remedial Action Plan - Waste Source Classification Register
- Appendix B - Remedial Action Plan - Sample Register (Table A)
- Appendix B - Remedial Action Plan - Plan Figure 1
- Appendix B - Remedial Action Plan - Plan Figure 2
- Appendix B - Remedial Action Plan - Plan Figure 3
- Appendix B - Remedial Action Plan - Plan Figure 4
- Appendix B - Remedial Action Plan - Plan Figure 5
- Appendix B - Remedial Action Plan - Plan Figure 7
- Appendix B - Remedial Action Plan - Plan Figure 8
- Appendix B - Remedial Action Plan - Plan Figure 9
- Appendix B - Remedial Action Plan - Plan Figure 10a
- Appendix B - Remedial Action Plan - Plan Figure 10b
- Appendix B - Remedial Action Plan - Plan Figure 10c
- Appendix B - Remedial Action Plan - Plan Figure 11
- Appendix B - Remedial Action Plan - Plan Figure 12
- Appendix B - Remedial Action Plan - Plan Figure 13
- Appendix C - Heritage Impact Statement - Preliminaries
- Appendix C - Heritage Impact Statement - Executive Summary
- Appendix C - Heritage Impact Statement - Part 1
- Appendix C - Heritage Impact Statement - Part 2
- Appendix C - Heritage Impact Statement - Part 3
- Appendix C - Heritage Impact Statement - Part 4
- Appendix C - Heritage Impact Statement - Part 5
- Appendix C - Heritage Impact Statement - Part 6
- Appendix C - Heritage Impact Statement - Part 7
- Appendix D - Scope of Work and Methodology Statement - Main Report
- Appendix D - Scope of Work and Methodology Statement - Part 1 - Draft Master Program
- Appendix D - Scope of Work and Methodology Statement - Part 2 - General Notes
- Appendix D - Scope of Work and Methodology Statement - Part 3 - Plan
- Appendix D - Scope of Work and Methodology Statement - Part 4 - Plan
- Appendix D - Scope of Work and Methodology Statement - Part 5 - Plan
- Appendix D - Scope of Work and Methodology Statement - Part 6 - Plan
- Appendix D - Scope of Work and Methodology Statement - Part 7 - Plan
- Appendix D - Scope of Work and Methodology Statement - Part 8 - Plan
- Appendix D - Scope of Work and Methodology Statement - Part 9 - Plan
- Appendix D - Scope of Work and Methodology Statement - Part 10 - Plan
- Appendix D - Scope of Work and Methodology Statement - Part 11 - Plan
- Appendix D - Scope of Work and Methodology Statement - Part 12 - Plan
- Appendix D - Scope of Work and Methodology Statement - Part 13 - Plan
- Appendix D - Scope of Work and Methodology Statement - Part 14 - Plan
- Appendix D - Scope of Work and Methodology Statement - Part 15 - Plan
- Appendix D - Scope of Work and Methodology Statement - Part 16 - Plan
- Appendix D - Scope of Work and Methodology Statement - Part 17 - Plan
- Appendix D - Scope of Work and Methodology Statement - Part 18 - Plan
- Appendix E - Quantity Surveyors Report - Cost Estimate for Site Remediation
- Appendix F - Director-General's Environmental Assessment Requirements
- Appendix G - Site Audit Report and Site Audit Statement
- Appendix H - Meeting Minutes from Discussions with Rail Corporation
- Appendix H - Rail Link Map - Part 1
- Appendix H - Rail Link Map - Part 2
- Appendix I - Waste Management Plan
- Appendix I - Waste Management Plan - Figure 1
- Appendix I - Waste Management Plan - Figure 2
- Appendix J - Salvage and Retention Survey - Cover Letter
- Appendix J - Salvage and Retention Survey
- Appendix K - Air Quality Assessment and Management Plan
- Appendix K - Air Quality Assessment and Management Plan - Figure 1
- Appendix K - Air Quality Assessment and Management Plan - Figure 2
- Appendix K - Air Quality Assessment and Management Plan - Figure 3
- Appendix K - Air Quality Assessment and Management Plan - Figure 4
- Appendix K - Air Quality Assessment and Management Plan - Figure 5
- Appendix M - Transport Management Plan - Part 1
- Appendix M - Transport Management Plan - Part 2
- Appendix M - Transport Management Plan - Part 3
- Appendix M - Transport Management Plan - Part 4
- Appendix N - Vibration and Noise Assessment
- Appendix N - Vibration and Noise Management Plan
- Appendix O - Remediation Works - Part 1
- Appendix O - Remediation Works - Part 2
- Appendix O - Remediation Works - Part 3
- Appendix O - Remediation Works - Part 4
- Appendix O - Remediation Works - Part 5
- Appendix O - Remediation Works - Part 6
- Appendix O - Remediation Works - Part 7
- Appendix O - Remediation Works - Part 8
- Appendix O - Remediation Works - Part 9
- Appendix O - Remediation Works - Part 10
- Appendix P - Electrical and Communication Services
- Appendix Q - Meeting Minutes from Discussions with Department of Environment and Climate Change
- Appendix Q - Email from Department of Environment and Climate Change
- Appendix R - Staging Program
- Addendum - Meeting Minutes from Discussions with Work Cover - Part 1
- Addendum - Meeting Minutes from Discussions with Work Cover - Part 2
Post-exhibition - response to submissions
- Response to submissions - covering letter
- Response to submissions - table
- Additional information - evidence of offsite source of groundwater contamination
- Alternative treatment of groundwater and amendment to cut-off wall
- Remediation Action Plan - Addendum - Childcare Centres
- Site Audit Statement - Addendum - Childcare Centres
- Amended Site Audit Report