Notices of Determination - 2006 - major projects
The Minister for Planning, the Hon. Frank Sartor, MP, has determined the following major development proposals and modifications under Part 3A of the Environmental Planning and Assessment Act 1979.
Note: This list is ordered by date of determination or approval, with the most recent at the top.
- MP 05_0187
- Title: Marine Maintenance Facility
- Approved: 22 December 2006
- Applicant: Sydney Slipways Pty Ltd
- Description: The construction and operation of a marine maintenance facility at Rozelle. The facility would include a boat maintenance/vessel refit yard, wet working bays, straddle lifts, worksheds, associated offices, carparking and catering facilities.
- Location: James Craig Road, Rozelle Bay
- LGA: Leichhardt
- Capital cost of development: $23.3 million
- F/T Construction Jobs: 70
- F/T Post Construction Jobs: 140
- Details: Project Approval, Director-General's Report
- Documents available: Director-General's Requirements, Major Project Application Form, Environmental Assessment, Preferred Project Report
- 06_0095
- Title: Chemical Waste Storage and Treatment Facility
- Approved: 22 December 2006
- Applicant: Chemsal Pty Ltd
- Description: A project application to establish a waste chemical resource recovery facility at 40 Christie Street, St Marys.
- Location: Lot 431, DP854814, 40 Christie Street, St Marys
- LGA: Penrith City
- Capital cost of development: $1 Million
- F/T Construction Jobs: 2
- F/T Post Construction Jobs: 30
- Documents available:
- 05_0121
- Title: 05_0121 Proposed Coca-Cola Amatil Facility Upgrade, Northmead, Parramatta Local Government Area
- Approved: 21 December 2006
- Applicant: Coca-Cola Amatil
- Description: Coca-Cola Amatil proposes to construct a high-bay automated bulk distribution facility and expand manufacturing operations at its existing site at Northmead. The existing warehouse area at the site would be demolished.
- Location: Lots 110 and 111 DP 800504, Lot 21 DP 632950 (Briens Road, Northmead)
- LGA: Parramatta
- Capital cost of development: $140 million
- F/T Construction Jobs: 105
- F/T Post Construction Jobs: 120
- Details: Project Approval; Project Approval (Appendix 2); Director-General's Report (1, 2, 3, 4, 5)
- Documents available: Major Project Application; Director-General's Requirements; EA Report; Preferred Project Report and Statement of Committments
- 05_0089
- Title: Southern Sydney Freight Line (SSFL)
- Approved: 21 December 2006
- Applicant: Australian Rail Track Corporation Ltd (ARTC)
- Description: The ARTC is proposing to construct, operate and maintain the SSFL, a new rail track 30km long in an existing 36km rail corridor between Macarthur and Sefton. The SSFL would provide a third bi directional track for freight services, which would allow passenger and freight services to operate independently. The new track would be located on the western side of the existing RailCorp passenger lines between Macarthur and the junction with the East Hills Line at Glenfield. At Glenfield it would cross over to the eastern / southern side of passenger lines via a new grade-separated interchange, known as the Glenfield flyover.
The proposal includes the construction and/or modification of road and rail bridges, retaining walls and embankments. Upgrades will also be required at six railway stations and their surrounding precincts - Leumeah, Minto, Casula, Warwick Farm, Cabramatta and Sefton. - Location: The SSFL would comprise a single dedicated rail freight track, extending from south of Macarthur to east of the Sefton Park junction.
- LGA: Liverpool, Campbelltown, Bankstown and Fairfield.
- Capital cost of development: $200 Million
- F/T Construction Jobs: 300
- F/T Post Construction Jobs: -
- Details:
- Director-General's Report - Part A
- Director-General's Report - Part B (Note: Director General's Report Appendix available on request)
- Project Approval - Part A
- Project Approval - Part B
- Documents:
- MP 06_0094
- Title: Residential and Retirement Development, Sandon Point
- Approved: 21 December 2006 (Note: subject to Land and Environment Court proceedings)
- Applicant: Stockland and Anglican Retirement Villages
- Description: The Proponent is seeking to rezone and list the Subject Site as a State Significant Site in Schedule 3 of State Environmental Planning Policy (Major Projects 2005) to facilitate the following:
- a residential subdivision to create new residential lots;
- subsequent development of residential dwellings; and
- a retirement development incorporating an aged care facility, community facilities and independent living units.
- Location: Sandon Point is located between Bulli and Thirroul approximately 14 km north of Wollongong
- LGA: Wollongong
- Capital cost of development: Approximately $150 million
- Details of approval: Director-General's Assessment Report and notice of approval
- Addtional documents available:
- Response to submissions
- Response to Agency Submissions
- Response to Public Submissions
- Appendix A - Residential Design Guidelines - The Point
- Appendix B - Response from Brown Consulting
- Appendix C - Response from Cardno Forbes Rigby
- Appendix D - Response from Cumberland Ecology
- Appendix E - Response from AVK
- Appendix F - Dr Mark Taylor Geomorphic Assessment
- Appendix G - Overlay mapping Ecological mapping, APZs and Charles Hill sheet 1
- Appendix G - Overlay mapping Ecological mapping, APZs and Charles Hill sheet 2
- Appendix H - Response from Susan McIntyre-Tamwoy
- Appendix I - Response from Cardno Forbes Rigby Regarding Services and Construction
- Summary - Public Submissions
- Summary - Government Agency Submissions
- Government agency submissions
- Department of Environment and Conservation - Sub 1 and Sub 2
- Department of Education
- Department of Housing
- Department of Natural Resources - Sub 1, Sub 2, and attachment ( Part 1, Part 2, Part 3 and Part 4)
- Department of Primary Industries - Sub 1 and Sub 2
- NSW Heritage Office
- RailCorp
- Rural Fire Service
- Roads and Traffic Authority
- Wollonong City Council
- Aboriginal cultural heritage assessment (by Australian Archaeological Survey Consultants)
- Preliminary documentation
- Minister's decision as a potential State significant site
- Director-General's requirements for Environmental Assessment
- Sandon Point Scoping Report and figures
- The State significant site study, preliminary assessment and Concept Plan application can be viewed online at http://www.sandonpointplanning.com.au
- 06_0053
- Title: Wollar to Wellington 330kV Transmission Line
- Approved: 19th December 2006
- Applicant: TransGrid
- Description: The proposal involves the construction and operation of a 330 kV transmission line between a new 330 kV switching station near Wollar to the existing substation at Wellington. The transmission line will be approximately 117 kilometres long, and will be located within a 60 metre wide easement.
- Location: Between a new 330kV switching station of Barigan Road, south of Wollar to the Wellington Substation.
- LGA: Midwestern Regional Council and Wellington Council.
- Capital cost of development: $43 Million
- F/T Construction Jobs: 50
- F/T Post Construction Jobs: 0 ( Existing Staff)
- Details:
- Documents available: Director General's Report and Instrument of Approval; Project Application; Director-General's Requirements; Adoption of Director-General's Requirements and acceptance of EIS; Environmental Assessment - Executive Summary; Submissions Report (Wollar - Wellington Route Plan (Fig 1); Wollar-Wellington Geotech Borehole Locations; Wollar-Wellington TL PEMP March 2006; Wollar-Wellington TL Statement of Commitments)
- 05_0138
- Title: Emergency turbine generator and expansion of the ash dam facility at the Eraring Power Station
- Approved: 14 December 2006
- Applicant: Eraring Energy
- Description: Project approval was granted for the construction and operation of a 42 MW emergency turbine generator at the Eraring Power Station (EPS). The generator is to operate using distillate fuel during emergencies (black start), energy shortfall situations and for testing and maintenance purposes.
Concept approval was granted for upgrading and expanding the existing ash dam facility to provide for additional ash disposal capacity to the EPS. The concept approval modified the Applicant's concept plan in order to limit the extent of dam expansion to approximately half of the 52 ha expansion proposed by the Applicant. The concept approval also required further environmental assessment and project approval of the ash dam upgrade/expansion to be undertaken under Part 3A of the Environmental Planning and Assessment Act 1979. - Location: Eraring Power Station, Rocky Point Road, Eraring
- LGA: Lake Macquarie local government area
- Capital cost of development: $41 million
- F/T Construction Jobs: 36
- F/T Post Construction Jobs: 8
- Details: 1) Director-General Assessment Report; 2) Project Approval; 3) Concept Approval; 4) Submissions Reports (1, 2, 3, 4, 5); 5) Project Application; 6) Director-General Environmental Assessment Requirements; and 7) Environmental Assessment Report
- Documents available: Major Project Application, Preliminary Assessment, Environmental Assessment Requirements
- Further Enquiries: Ricardo Prieto-Curiel (02) 9228 6112 or ricardo.prieto-curiel@planning.nsw.gov.au
- 05_0045
- Title: Moorland to Herons Creek Pacific Highway Upgrade
- Approved: 14 December 2006
- Applicant: NSW Roads and Traffic Authority
- Description: Upgrading a 22.2 kilometre section of the Pacific Highway between Moorland and Herons Creek to a four-lane divided road by duplicating sections of the existing highway and constructing bypasses around the towns of Johns River and Kew.
- Location: From south of Johns River to north of Herons Creek Public School, on the NSW Mid North Coast, linking to the approved Coopernook to Moorland Pacific Highway upgrade to the south and the proposed Herons Creek to Stills Road upgrade to the north.
- LGA: Greater Taree and Port Macquarie-Hastings
- Capital cost of development:
- F/T Construction Jobs:
- F/T Post Construction Jobs:
- Details:
- Documents Available:
- RTA request for DGRs
- EA requirements
- EA requirements attachments (DGR attachment - EPA.pdf
- DGR attachment - NSW Fisheries.pdf
- DGR attachment - DLWC.pdf
- DGR attachment - NPWS.pdf
- DGR attachment - State Forests
- EA accreditation
- EA accreditation request
- Submissions Report
- Environmental Assessment: http://www.arup.com.au/moorland/eis.html
- Director-General's Report
- Appendix D - Submissions from Public Authorities
- Instrument of Approval
- MP 05_0192
- Title: Alterations and additions to the Pottsville North Holiday Park
- Approved: 14 December 2006
- Applicant: Tweed coast Holiday Parks Reserve Trust
- Description: Alterations and additions to parts of the Pottsville North Holiday Park to provide 20 additional long term sites and the deletion of 8 short term sites. Eighteen of the 20 long term sites will revert to short term sites once the initial tenants vacate the sites.
- Location: Lots 1 and 2 DP 731761, Lot 7016 DP 1055269, Lot 522 DP 822808, Tweed Coast Road, Pottsville
- LGA: Tweed Shire Council
- Capital cost of development: $ 500,000
- Details:
- MP 06_0115
- Title: 8 lot staged residential subdivision
- Approved: 9 December 2006
- Applicant: Mr Barry Dowman
- Description: Approval is granted only to carrying out the development described in detail below:
- Subdivision of Lot 1 in DP 572076 and Lot 24 in DP 1055427 into 8 torrens title lots in seven stages generally in the following sequence;
- Stage1 - Lot 19
- Stage 2 - Lot 18
- Stage 3 - Lot17
- Stage 4 - Lot 20
- Stage 5 - Lot 21
- Stage 6 - Lot 16
- Stage 7 - Lot 16 & 22
- Subdivision of Lot 1 in DP 572076 and Lot 24 in DP 1055427 into 8 torrens title lots in seven stages generally in the following sequence;
- Location: 42 Iluka Road, Woombah
Lot 24 DP 1055427 and Lot 1 DP 572076 - LGA: Clarence Valley Council
- Capital cost of development: $280,000
- F/T Construction Jobs: 2
- F/T Post Construction Jobs: N/A
- Documents available:
- MP 06_0138
- Title: Camden Gas Project - Stage 2 : Elizabeth Macarthur Agricultural Institute Wells
- Approved: 9 December 2006
- Applicant: AGL Gas Production (Camden) Pty Ltd and Sydney Gas (Camden) Operations Pty Ltd
- Description: Establishment of 14 coal seam methane gas wells, connecting these wells by a gas gathering system, and production and delivery of gas to the Stage 2 gas treatment plant.
- Location: Elizabeth Macarthur Agricultural Institute, Woodbridge Road, Menangle.
- LGA: Wollondilly
- Documents available: Assessment Report and Project Approval
Major Project Application and Director General's Requirements
A copy of the Environmental Assessment is available on the following website - http://www.agl.com.au/camdengasproject - MP 06_0137
- Title: Camden Gas Project - Stage 2 : Razorback Wells
- Approved: 9 December 2006
- Applicant: AGL Gas Production (Camden) Pty Ltd and Sydney Gas (Camden) Operations Pty Ltd
- Description: Establishment of 10 coal seam methane gas wells, connecting these wells by a gas gathering system, and production and delivery of gas to the Stage 2 gas treatment plant.
- Location: Razorback group of properties located to the east of Remembrance Drive and west of Finns Road, Menangle.
- LGA: Wollondilly
- Documents available:
Project Approval and Assessment Report.
Major Project Application and Director General's Requirements
A copy of the Environmental Assessment is available on the following website - http://www.agl.com.au/camdengasproject - Further inquiries: Michael Young - (02) 9228 6437.
- MP MP05_0184
- Title: Marine Contractor Waterfront Base, Rozelle Bay
- Approved: 9 December 2006
- Applicant: Polaris Marine Constructions & Recovery Pty Ltd
- Description: Waterfront Base for Marine Contractor business
- Location: Lot 25, Site R6 James Craig Rd, Rozelle Bay
- LGA: Leichhardt
- Capital cost of development:
- F/T Construction Jobs:
- F/T Post Construction Jobs:
- Details: Assessment Report and Project Approval
- (MP 06_0111)
- Title: Orange Bloomfield Hospital (MP 06_0111)
- Approved: 9 December 2006
- Applicant: NSW Health
- Description: The project involves the:
- Construction of a new two storey/part three storey purpose built general hospital building with a helipad at roof level
- Construction of an acute mental health facility building;
- Construction of a secure mental health unit building;
- Demolition of existing buildings;
- Provision of landscaped areas and soft landscaping and removal of specific trees;
- The refurbishment of existing buildings;
- Construction of vehicular and pedestrian access, car parking and associated structures;
- The provision of associated utility services;
- Construction of a radiotherapy unit attached to the eastern façade of the general hospital building; and
- Subdivision of Lot 206 DP 42900 to excise the development site and allow transfer to the Health Administration Corporation.
- Location: Forest Road, Orange (Lot 206 DP42900 and Lot 230 DP 720596)
- LGA: Orange City Council
- Capital cost of development: $141 million
- F/T Construction Jobs: 200
- F/T Post Construction Jobs: 321
- Approval Authority: Minister for Planning
In accordance with the instrument of delegation dated 1 April 2006 certain functions in relation to the public consultation and assessment of the application were delegated to Orange Council. - Relevant Legislation: Part 3A of the Environmental Planning and Assessment Act 1979.
State Environmental Planning Policy (Major Projects) 2005 - Details: View documents
- Further Enquiries: Anthony Witherdin (9228 6173)
- MP 06_0203
- Title: Huntingwood West Concept Plan for subdivision and associated infrastructure works (MPA 06_0203)
- Approved: 9 December 2006
- Applicant: Landcom
- Description: Concept approval (subject to modifications) for a 47 lot subdivision for employment generating uses and associated roads, services and infrastructure.
- Location: Huntingwood West
- LGA: Blacktown
- Capital cost of development: $10.5 million
- F/T Construction Jobs: -
- F/T Post Construction Jobs: 800
- Documents available:
- 05_0184 MOD 1 (05_0164)
- Title: Modification Major Project Approval, MP 05_0184 MOD 1
- Approved: 9 December 2006
- Applicant: Capital Insight Pty Ltd on behalf of the University of Sydney,Campus Property and Services
- Description: The modification application seeks to modify Condition C2(1) to require the submission and approval of an interpretation strategy prior to the issue of a Construction Certificate for above ground works.
- Location: University of Sydney, USYD Central
- LGA: City of Sydney
- Details: Report, MOD Instrument, DGRs
- MP 06_0011
- Title: Telecommunications Facility
- Approved: 30 November 2006
- Applicant: NGH Environmental
- Description: Telecommunication facility, which includes:
- Mounting the following to a 30m steel monopole on concrete foundations:
Six (6) panel antennae (2 antennae per sector) at the 29.5m level for CDMA800 and GSM900 service
One (1) omnidirectional antenna;
One (1) 0.6m diameter solid parabolic antenna at the 27m level, and; - Construction of equipment shelter (3.28m x 2.28m x 3.0m high). Concrete slab footings 4.4m x 2.6m x 0.15m;
- Construction of compound (10m x 5m) surrounded by a 2.4m high security fence (coated in black PVC) with double access gates;
- Installation of 450mm wide galvanised cable tray and supports from equipment shelter to tower, and;
- Installation of a GPS antenna (approximately 0.16m diameter x 0.13m high) on the equipment shelter at 3.2m high.
- Mounting the following to a 30m steel monopole on concrete foundations:
Six (6) panel antennae (2 antennae per sector) at the 29.5m level for CDMA800 and GSM900 service
- Location: Crown Reserve No 86770, Lot DP 755904, South Durras
- LGA: Eurobodalla Shire Council.
- Capital cost of development: $150,000
- Documents available:
- Preliminary Assessment
- Cover
- EA
- Attachment 1
- Attachment 2
- Attachment 2B
- Attachment 3-7
- Attachment 8-9
- Attachment 10
- Planning report
- Conditions
- Cover
- Locality and site plans
- Site elevations
- Environmental assessment report
- Aboriginal archaelogical assessment
- Director General's requirements
- EME levels report
- Request for owner's consent
- 05_0193
- Title: Hexham Swamp Rehabilitation Project
- Approved: 30/11/06
- Applicant: Minister for Natural Resources
- Description: The staged and controlled opening of existing floodgates located at the mouth of Ironbark Creek in order to restore tidal flows to the wetland. The carrying out of certain works to minimise the impact of an increased tidal flow on private property including filling and the construction of bunds.
- Location: Northern outskirts of Newcastle City
- LGA: Newcastle City Council
- Capital cost of development: $7 million (including land acquisition)
- F/T Construction Jobs:
- F/T Post Construction Jobs:
- Documents available: Instrument of Approval/Conditions; and Director-General's Environmental Assessment Report, Project Application for Hexham Rehabilitation Project, Director-General's requirements, Submissions Report
- 06_0160
- Title: Crude Oil Storage Tank - Caltex Kurnell Refinery
- Approved: 30 November 2006
- Applicant: Caltex Refineries (NSW) Pty Ltd
- Description: Construction and operation of a crude oil storage tank (Tank 634) with a capacity of approximately 70-80 megalitres at its existing Kurnell refinery.
- Location: 2 Solander Street, Kurnell Peninsula Lot 25 DP 776328
- LGA: Sutherland local government area
- Capital cost of development: $28 million
- F/T Construction Jobs: 20-40
- F/T Post Construction Jobs: 0
- Further Enquiries: Ingrid Ilias (02) 9228 6411 or ingrid.ilias@planning.nsw.gov.au
- Details: 1) Project Approval and 2) Environmental Assessment Report
- Documents available: Project Application and Preliminary Assessment and Environmental Assessment Requirements and Environmental Assessment
- MP 05_0088
- Title: Australian Film, Television and Radio School, The Entertainment Quarter, Moore Park, Major Project Application MP 05_0088
- Approved: 26 November 2006
- Applicant: CFS Managed Property Ltd
- Description: Demolition of the former Dairy Hall (Building 140), temporary administration building (Building 132), former Gondola and chairlift, building, temporary mini-golf course and the associated kiosk, and the existing rotunda and stairs in Heritage Park. Approval is sought for the construction of a 3 level building including offices, studios, workshops, teaching spaces, library, café, theatres, foyer, service cores, stores and loading dock and undertake minor landscaping works.
- Location: Lot 52 DP 1041134, Fox Studios, Moore Park
- LGA: Sydney
- Capital cost of development: $35,000,000
- Details:
- Conditions
- Director General's Environmental Assessment Report
- Preliminary Assessment
- Application Form
- Owner's Consent
- Appendix 1: Master Plan
- Appendix 2: Letter From Minister
- Appendix 3: Context 1-1000
- Appendix 3: Context 1 - 12500
- Appendix 3: Floor Plan 1
- Appendix 3: Floor Plan 2
- Appendix 3: Floor Plan 3
- Appendix 3: RP
- Appendix 3: SEC-AA
- Appendix 3: SEC-BB
- Appendix 3: Figures
- view more documents
- 06_0268 MOD 1
- Title: Lane Cove Tunnel Modification
- Approved: 21 November 2006
- Applicant: NSW Roads and Traffic Authority
- Description: Proposed modification to the Lane Cove Tunnel Approval to:
- enable on site storage of dangerous goods for the purpose of normal operating requirements of the Water Treatment Plant during operation of the Tunnel; and
- remove reference to a time period for collecting ambient air quality data from the Community Based Monitoring Stations to instead be dependent upon the Proponent ensuring that sufficient data is collected prior to the opening of the project to traffic to enable compliance with relevant air quality monitoring conditions.
- Location: Along the alignment of Epping Road and the Gore Hill Freeway, between the Lane Cove River and Naremburn, Sydney.
- LGA: Lane Cove, North Sydney, Willoughby, Ryde
- Capital cost of development:
- F/T Construction Jobs:
- F/T Post Construction Jobs:
- Documents available:
- MP 05_0084
- Title: Former Naval Stores Site at Ermington - MP 05_0084
- Approved: 21 November 2006
- Applicant: Stockland Development Pty Limited
- Description: The proposed development comprises a mixture of detached dwellings, courtyard homes, townhouses/terraces and a residential flat building in a combination of Torrens and Strata Title subdivision.
- Location: Part Lot 1001 DP 1040571 and Lot 1009 DP 1066557, 2 Spurway Street, Ermington
- LGA: Parramatta City Council
- Capital cost of development: $34,000,000
- F/T Construction Jobs: n/a
- F/T Post Construction Jobs: n/a
- Documents available: view documents
- 05_0082
- Title: Kurnell Desalination Plant and Associated Infrastructure
- Approved: 16 November 2006
- Applicant: Sydney Water Corporation
- Description: The construction and operation of a desalination plant on the Kurnell Peninsula for the supply of up to 500 megalitres of drinking water per day, including the following ancillary project components (Major Project Application: 05_0082): a) intake and outlet tunnel(s) to draw raw seawater into the plant and return seawater concentrate to the ocean; b) a potable water delivery pipeline, tunnel or microtunnels from the plant across Botany Bay to the Sydney Water Corporation pressure/ city tunnel water supply system; c) a pipeline connecting the plant to the existing water supply system at Miranda to allow distribution of treated water; d) connection of the project to the electricity supply grid; and e) temporary laydown areas for construction use.
- Location: Kurnell Peninsula and other land required for the construction and operation of the seawater intake and concentrate discharge structures, the desalination plant, and associated potable water distribution. Lands comprising the bed of Botany Bay for potable water distribution and State coastal waters to the east of Kurnell Peninsula for seawater intake and concentrate discharge structures.
- LGA: Sutherland, Rockdale, Botany Bay, Sydney, Ashfield, Kogarah, Marrickville, Canterbury
- Capital cost of development: $2 Billion
- F/T Construction Jobs: 1000
- F/T Post Construction Jobs: 20
- Details: View documents available
- MP 05-0179
- Title: Capital Wind Farm Project
- Approved: November 7, 2006
- Applicant: Renewable Power Ventures Pty Ltd
- Description: The proposal involves the installation and operation of 63 wind turbines each with a capacity of approximately 2.1 megawatt
- Location: on the Great Dividing Range approximately 40 kilometres north-east of Canberra and 10 kilometres south-west of Tarago, NSW
- LGA: Palerang and Goulburn-Mulwaree
- Approval Authority: Minister for Planning
- Capital cost of development: $220 million
- Relevant Legislation: Part 3A of the Environmental Planning and Assessment Act
- Documents available:
- Assessment Report
- Conditions of Approval
- Response to submissions
- 06_0132 - State significant site listing of Kings Forest
- Title: Kings Forest - SEPP Amendment No 10
- Date of gazettal of site in Major Projects SEPP: 3 November 2006
- Applicant: Leda Developments
- Description: On 3 November 2006, Kings Forest was gazetted as a State significant site in Schedule 3 of State Environmental Planning Policy (Major Projects) 2005 ("the Major Projects SEPP").
The State Environmental Planning Policy (Major Projects) 2005 (Amendment No 10) ("the SEPP") provides new zones and development controls for Kings Forest that will protect areas of high conservation value and provide guidance for future urban development over parts of Kings Forest.
The conservation values to be protected by the SEPP include Koala habitat, coastal wetlands and endangered ecological communities. The SEPP also assists in the consolidation of wildlife corridors. In protecting environmental areas and providing future housing opportunities, this SEPP will achieve the Government's draft Regional Strategy for the Far North Coast.
The SEPP zones 373.9 ha (34.1% of the site) of land as environmental protection. This is an increase of 182.1ha of land zoned for environmental protection compared with current Tweed LEP (that zones 191.8ha or 17.5% of site environmental protection).
On 10 November 2006, an Order was gazetted to declare that subdivision, subdivision works and the erection of dwelling houses on land at Kings Forest are projects that apply to Part 3A of the EP&A Act. - Location: Kings Forest, near Kingscliff
- LGA: Tweed
- Details:
- Refusal of Major Project 05_0194
- Title: Major Project Application 05_0194 - 18-20 Coast Avenue, Cronulla
- Refused: 28 September 2006
- Applicant: Sammut Developments Pty Ltd
- Description: Proposed demolition of existing two x two storey residential flat buildings, construction of a five storey residential flat building comprising five units with basement parking for 13 vehicles and strata subdivision
- Location: Lot 9 & 10 DP 4878, 18-20 Coast Avenue, Cronulla
- LGA: Sutherland Shire
- Capital cost of development: $4 million
- Details: Proposed demolition of existing two x two storey residential flat buildings, construction of a five storey residential flat building comprising five units with basement parking for 13 vehicles and strata subdivision
- Documents available: View documents
- MP06_0031
- Title: Dan Land Concept Plan & Project Application for subdivision and associated works (MPA 06_0031)
- Approved: 26 September 2006
- Applicant: Northwest Residential Pty Ltd
- Description: Concept approval (subject to modifications) for subdivision and future construction of 400 residential dwellings over approximately 45 hectares of the site and associated services and infrastructure, incorporating an environmental protection buffer to the adjoining Hexham wetlands; and
Project approval (subject to conditions) for community title subdivision and associated infrastructure works, is granted only to the carrying out the development solely within the concept plan area as described in the document titled "Dan Land Preferred Project Report" prepared by Planning Workshop Australia (dated August 2006). - Location: 290 & 302 Minmi Road, Fletcher (Dan Land)
- LGA: Newcastle
- Capital cost of development: $100 million
- F/T Construction Jobs: 1,300
- F/T Post Construction Jobs:
- Documents available:
- Environmental Assessment Report
- Instrument of approval
- Preliminary Assessment Report
- Director Generals Environmental Assessment Requirements
- State Significant Study, Concept Plan and Environmental Assessment
- Report on Submissions
- Preferred Project Report
- Preferred Project Report Appendix 1 - Amended Subdivision Plan
- Preferred Project Report Appendix 2 - Draft Zonings (Figure 13), Concept Plan (Figure 16), Proposed Lot Layout (Figure 17)
- Preferred Project Report Appendix Three - Landscape Masterplan
- Preferred Project Report Appendix Four - Vegetation Management Plan Report (Part 1), Vegetation Management Plan Report (Part 2),Vegetation Management Plan Report (Part 3),Vegetation Management Plan - Drawing, Vegetation Management Plan - Drawing - Sections
- MP 06_0040
- Title: Mt Arthur Exploration Adit
- Approved: 20 September 2006
- Applicant: Hunter Valley Energy Coal Pty Limited (Mt Arthur Coal)
- Description: Approval was provided for:
Construction and operation of an exploration adit and associated surface infrastructure for the purpose of extracting a bulk sample comprising 450,000 tonnes of run-of-mine coal over 2 years. - Location: Adjacent to the existing Mt Arthur Coal mining complex, approximately 7 km south-west of Muswellbrook in the Upper Hunter Valley.
- LGA: Muswellbrook
- Capital cost of development: $20,000,000
- F/T Construction Jobs: 60
- Details: Project Approval, Assessment Report
- Documents available: Major Projects Application; Director-General's Requirements; Environmental Assessment
- 06_164
- Title: 06_164 Coles Myer Chilled Distribution Centre, Eastern Creek
- Approved: 18 September 2006 - Project approved
- Applicant: Macquarie Goodman Management Ltd
- Description: Construction and Operation of a Coles Myer Chilled Distribution Centre for the purpose of storing and supplying retail outlets with chilled products as part of its Food and Liquor Supply Chain. The facility would have an area of approximately 40,275m2 and would operate 24 hours a day, 7 days a week.
- Location: Part Lot 250 and 252 DP 1082988, Old Wallgrove Road, Eastern Creek
- LGA: Blacktown
- Capital cost of development: $89 million
- F/T Construction Jobs: 80
- F/T Post Construction Jobs: 490
- Details: Instrument of Approval; Director Generals Report
- Documents available:
- Advertisement
- Environmental Assessment
- Architectural Drawings
- Consultant Drawings
- Appendix 1 - Director Generals Requirements
- Appendix 2 - Deposited Plan
- Appendix 3 - Traffic Assessment
- Appendix 4 - Landscape Report
- Appendix 5 - Cumberland Plain Woodland Assessment
- Appendix 6 - Archaeological Testing Results
- Appendix 7 - Phase 1 Contamination
- Appendix 8 - Site Audit Statement
- Appendix 9 - Noise and Vibration
- Appendix 10 - Salinity Study
- Appendix 11 - Engineering Report (Report) (Appendices)
- MP 06_0021
- Title: Angus Place Coal Project
- Approved: 13 September 2006
- Applicant: Centennial Angus Place Pty Limited
- Description: Approval was provided for:
- extracting approximately 32 million tonnes of run-of-mine coal over a period of up to 15 years at a maximum rate of 3.5 million tonnes a year;
- using existing infrastructure at the mine to handle, process and transport coal either to Mount Piper or Wallerawang Power Stations; and
- continuing to use existing surface infrastructure associated with the mine.
- Location: 20 km northwest of Lithgow, NSW.
- LGA: Lithgow
- Capital cost of development: Not applicable
- F/T Construction Jobs: 215
- Details: Project Approval, Assessment Report, Proponent's Response to Submissions, Statement of Committments
- Documents available: Project Application, Project Application Letter, Project Application Figure, Director-General's Requirements (RTF), Environmental Assessment Report, Fig 1 Angus Place Loc, Fig 2 Angus Place Mining, Fig 3 Angus Place Pittop, Fig 4 Kerosine Vale Site, Fig 5 Angus Place 19Jan06
- MP 05-0168
- Title: Vineyard to Rouse Hill Electricity Upgrade
- Approved: September 7
- Applicant: Integral Energy
- Description: The proposal involves the reconstruction of an 8.5 km section of an existing, overhead 132kV transmission line between the Vineyard bulk supply point and a future switching station near Schofields Road at Rouse Hill.
- Location: Bandon Road, Vineyard to corner of Cudgegong and Schofields Road, Rouse Hill
- LGA: Blacktown LGA
- Approval Authority: Minister for Planning
- Relevant Legislation: Part 3A of the Environmental Planning and Assessment Act
- Details: Assessment Report Conditions
App1 - Independent Panel Report - App2 - BRW Report
- App3 - PBoard Report
- Proposal documents available: Director-General's Requirements ( PDF file - RTF file), Accreditation of Director-General's Requirements ( PDF file , RTF file), Project application , Environmental Impact Statement - Executive Summary , Notice of Independent Hearing and Assessment Panel ( PDF file – RTF file), Submissions Report, Appendices to the Independent Panel Report
- MP 05_0065
- Title: Invincible Open Cut Coal Mine Extension Project
- Approved: 7 September 2006
- Applicant: Coalpac Pty Limited
- Description: Approval was provided for:
- extracting approximately 720,000 tonnes of run-of-mine coal over a period of up to 3 years at a maximum rate of 350,000 tonnes a year; and
- using infrastructure at the mine to handle, process and transport coal either to Mount Piper Power Stations or other domestic markets; and
- progressively rehabilitating the site
- Location: 20 km northwest of Lithgow, NSW.
- LGA: Lithgow
- Capital cost of development: $2.25 million
- F/T Construction Jobs: 12
- Details: Project Approval, Assessment Report, Proponent's Response to Submissions
- Documents available: Project Application, Project Application Letter, Project Description
- Environmental Assessment
- EA Figures 1 to 7
- EA Figures 8 to 14
- Appendix A
- Appendix B - Letters from statutory authorities
- Requirements of Integrated Approval Agencies and Requirements of other relevant agencies
- Appendix C - Mine Safety Management Plan
- Appendix D - Heritage Assessment
- Plans
- Copies of Native Title Information
- Appendix E -Propose Open Cut Mining Program
- Appendix F - Consents for Invincible Colliery
- Appendix G - Blasting Assessment
- Appendix H - Air Quality Monitoring
- Appendix I - Flora Survey Flora Survey2 Flora Survey Figures Flora Survey Appendices
- Appendix J - Fauna Report
- Appendix K - Flora and Fauna Assessment
- Appendix L - Noise Assessment Noise Assessment Amendment
- Invincible statement of Commitments
- 05_0098
- Title: 05_0098 - Alternative Waste Technology (AWT) Facility, Jacks Gully Waste and Recycling Centre
- Approved: 7 September 2006
- Applicant: WSN Environmental Solutions
- Description: The construction and operation of an AWT facility consisting of a municipal solid waste treatment plant and a green waste processing facility with associated infrastructure. The facility would treat 90,000 tonnes of solid waste and 30,000 tonnes of organics per annum.
- Location: Lot 2 - 4 DP250033 and Lot 2 DP1076817, Richardson Road, Jacks Gully Waste and Recycling Centre, Spring Farm
- LGA: Camden
- Capital cost of development: $39 million
- F/T Construction Jobs: 50
- F/T Post Construction Jobs: 40
- Details: Instrument of Approval; Director-General's Report
- Documents available: Major Projects Application Form, Environmental Assessment, Environmental Assessment Requirements, Response to Submissions
- 05_0097
- Title: 05_0097 Advance Metal Manufacturing and Warehousing Facility, Ingleburn
- Approved: 5 September 2006
- Applicant: Cronulla Pty Ltd
- Description: The construction and operation of a metal products manufacturing and warehousing facility at Ingleburn. The facility would manufacture a range of metal-based products such as aerospace components, machinery, tools, office storage furniture and various electrical components. Metal manufacturing and fabricating processes would include laser profiling, welding, rolling and coating.
- Location: Lot 101 DP 1082400, 11 Austool Place, Ingleburn
- LGA: Campbelltown
- Capital cost of development: $14 million
- F/T Construction Jobs: 40
- F/T Post Construction Jobs: 160
- Details: Instrument of Approval; Director-General's Report
- Documents available:
- Advance Metal Products EA Requirements
- Preliminary Assessment
- Project Application
- Environmental Assessment - Director-General's Requirements - Environmental Assessment EA JUN06 (2)
- Landscape Plans - 1398_1of3, 1398_2of3, 1398_3of3
- Stormwater Plan - 05029-H01c
- Site Plan - DA2 Site plan Rev B (1-500)
- Ground Floor Plans - DA3 Ground plan factory area Re, DA4 ground flr office area (A1-
- First Floor Plan - DA5 first flr office area (A1-1.
- Elevations and Sections - DA6 elevations & sections(1-200
- MP 05_0050 MOD 1
- Title: St. Vincent's Research and Biotechnology Facility - Site A
- Approved: 30 August 2006
- Applicant: Savills Pty Ltd
- Description: Approval for the construction of the St Vincent's Research and Biotechnology Precinct Project - Site A is to be modified as follows:
- Removal of the level 1 link between the Garvan Institute and the proposed new building;
- Raising of level 3 (the level connection with the Garvan) and subsequent reduced excavation, and reduction in level 1 building envelope;
- Improvements to the Liverpool Street entry consisting of reduction in the steps leading to the north-western corner of the site due to the raising of level 3 therefore providing direct level access immediately adjacent to the main entry; reducing stormwater management; raising the landscaped podium areas to the west of the building; removal of the rear escape stair meaning that these areas are level with Chaplin Lane; extension of the canopy at this entry and altering the landscaping area;
- Changes to the internal planning to create collaborative spaces, centralising the common areas containing receptions, seminar rooms and facilities;
- Relocation of the lifts from the front façade to the inside of the building and introduction of double-sided lifts;
- New expanded levels 3 and 4;
- Revised facades as a result of the expanded levels 3 and 4;
- Changes to the rear stair and level 4 pedestrian access following the removal of the level 1 link; and
- Relocation / location of generators.
- Location: 405-411 Liverpool Street, Darlinghurst
- LGA: City of Sydney Council
- Details: Instrument of Consent, Modification Planning Report, Schedule 3 Revised Statement of Commitments; Director General's report; Final determination and conditions; view documents
- Proposal documents available: View documents
- 05_0063 MOD 1
- Title: Modification of Tugun Bypass Approval
- Approved: 24 August 2006
- Applicant: Queensland Department of Main Roads (QDMR) and the NSW Roads and Traffic Authority (RTA)
- Description: Correction of minor errors and misdescriptions in Instrument of Approval
- Location: Between Currumbin and Tweed Heads, traversing areas under the jurisdictions of Queensland and NSW. The proposed alignment also passes through the Gold Coast (Coolangatta) Airport which is currently leased by Gold Coast Airport Limited.
- LGA: Tweed LGA (and Currumbin LGA, Queensland)
- Details: View documents available
- MPA 05_0086
- Title: The Parklands (Channel 7) Concept Plan (MPA 05_0086),
- Approved: 22 August 2006
- Applicant: Sydney Broadcast Property Pty Ltd
- Description: Concept approval is granted to the carrying out of the following:
- Construction of up to 650 dwellings;
- 80,000 sqm maximum gross floor space;
- 66,000 sqm total envelope area;
- No more than 73 dwellings per hectare on land;
- A maximum height of 6 storeys and height distribution in accordance with figure 8.9 of the preferred project report dated May 2006;
- Development must provide a minimum of 5% one-bedroom dwellings;
- Development must not exceed 15% provision of 3-bedroom + study dwellings;
- No less than 3.1 hectares of open space;
- Child care centre.
- Location: Lot 1 & 2 DP 732070, Lot 2 DP 582172, Lots 1 & 2 DP 570891 and Lot 4 DP 219907 at 61 Mobbs Lane, Epping
- LGA: Parramatta City Council
- Capital cost of development: $160 million
- F/T Construction Jobs: 1,254
- F/T Post Construction Jobs: n/a
- Details: Director General's Report:
- Documents available:
The following documents which comprise the Environmental Assessment can be viewed at www.parklandsepping.com.au
- Exhibited Environmental Assessment
- Appendix A - Precedent Study
- Appendix B - Bus Servicing Report & Transport Report
- Appendix C - Landscape Drawings & Landscape Report
- Appendix D - Water management and Servicing
- Appendix E - Ecology
- Appendix F - Retail
- Appendix G - Views & View Plans
- Appendix H - Cultural
- Appendix I - Overshadowing
- Appendix J - Contamination
- Appendix K - Roads
- Appendix L - Economics
- Environmental Assessment - Preferred Project Report (16 May 2006)
- Appendix A - Precedent Study
- Appendix B - Bus Servicing Report & Transport Report
- Appendix C - Landscape Drawings & Landscape Report
- Appendix D - Water management and Servicing
- Appendix E - Ecology
- Appendix F - Retail
- Appendix G - Views & View Plans
- Appendix H - Cultural
- Appendix I - Overshadowing
- Appendix J - Contamination
- Appendix K - Roads
- Appendix L - Economics
- Appendix M - Consultations
- Appendix N - Response to Submissions
- MP No: 05_0047
- Title: Road/Rail Terminal, Kelso
- Approved: 12 August 2006
- Applicant:
- Description: A Concept Plan for a road/rail freight intermodal terminal, with associated storage and business facilities, at the Great Western Highway Kelso, approximately four kilometres east of Bathurst. The Concept Plan includes: two private rail sidings from the Great Western Railway; hardstand areas for storage of containerised goods; warehousing; highway use sites for warehousing and bulky goods developments; a service station; administrative and maintenance facilities for the intermodal terminal; and internal and access roads through the site and landscaping. The Concept Plan will be staged incrementally, with the first stage involving construction of rail sidings, hardstands, roads and landscaping. Each stage would be subject to further project applications.
- Location: Lot 1 DP 164151,
Lots 21-22 DP 137352,
Parts 60, 68, 73 and 81 DP 755781,
213 Sydney Road (Great Western Highway) - LGA: Bathurst Regional
- Capital cost of development: $100 Million
- F/T Construction Jobs: 200
- F/T Post Construction Jobs: 300
- Details: Kelso D-Gs Report; Kelso Consent_August 2006; Project Application; Environmental Assessment; Environmental Assessment Requirements; Appendix A Concept Plan; Appendix B Statment of Commitments
- MP 06_0028
- Title: Proposed HCB Re-packaging Plant, 16-20 Beauchamp Road, Matraville, Botany Local Government Area
- Approved: 12 August 2006
- Applicant: Orica Australia Pty Ltd
- Description: Approval was granted for the construction and operation of HCB Re-packaging Plant, 16-20 Beauchamp Road, Matraville, Botany Local Government Area. The project consists of the following:
- construction and operation of a warehouse including a re-packaging plant and additional waste storage area (Store J); and
- operation of equipment necessary to remove waste from stores E and H and process the concrete tanks containing the waste at those stores.
- Location: 16-20 Beauchamp Road, Matraville
- LGA: Botany
- Capital cost of development: $15 million
- F/T Construction Jobs: 12
- F/T Post Construction Jobs: 20
- Details: DGs Assessment Report, Instrument of Approval
- Documents available: Major Project Application new, Environmental Assessment Requirements (RTF), Preliminary Assessment 1, Preliminary Assessment Attach 1, Preliminary Assessment Attach 2
- MP 05_0067
- Title: Determination of Major Project NO. 05_0067
- Approved: 12 August 2006
- Applicant: Sydney Harbour Foreshore Authority
- Description: Development consent is granted only to carrying out the development described in detail below:
- The development and use of the land as public open space, including a casual viewing amphitheatre, children's playground and a foreshore walking and cycle path;
- Landscaping including new plantings of predominantly native trees, shrubs and grasses, site interpretive elements and public art;
- The repair and location of retaining walls, locations of stairs, bridges and ramps throughout the park, and the location of shade structures, public amenities and maintenance/store room;
- Locations for furniture and facilities including seating, benches and barbeques;
- Provision of space for a small mobile food and beverage kiosk;
- Provision of an 18 space, on-grade public car park on Wharf Road; and
- Repairs to seawalls along the northern foreshore of the site.
- Location: Ballast Point Park, Ronald Street, Birchgrove
Lot 1, 2, 3 and 4 DP 115939, Lot 7 DP 132691, Lot 11 DP 792332, Lot 413 DP 752049, Lot 634 DP 752049 and Lot 1 and 2 DP 82593. - LGA: Leichhardt
- Capital cost of development: $11 000 000
- Details: Notice Of Determination & Planning Report
Scan 1, Scan 2, Scan 3, Scan 4, Scan 5, Scan 6, Scan 7, Project Application, Director General Requirements (RTF) - MP 05_0160
- Title: Proposed Remediation of Quix Service Station Site, 161 Hume Highway, Lansvale, Fairfield Local Government Area
- Approved: 8 August 2006
- Applicant: Mobil Australia Pty Ltd
- Description: Approval was provided for the remediation of the Quix service station site at 161 Hume Highway, Lansvale, in the Fairfield Local Government Area. The site, which has been declared a remediation site under Division 3 of Part 3 of the Contaminated Land Management Act 1997, has been impacted with petrol related hydrocarbons and metals. Mobil Australia Pty Ltd has entered into a Voluntary Remediation Agreement with the Department of Environment and Conservation for the remediation of the on-site impacted groundwater. The remediation include a range of activities including groundwater extraction and on-site treatment, and oxygen injection to the groundwater.
- Location: Lot 204 DP 732440, 161 Hume Highway, Lansvale
- LGA: Fairfield City Council
- Capital cost of development: $248,000
- Details:
- Minister approval signed
- DG Assessment Report
- Environmental Assessment Requirements
- Major Projects Application
- Environmental Assessment
- Mobil Lansvale Cover Page and Report
- Mobil Lansvale Figures 1-3 Site Location Area Map Aerial Photo 1994
- Mobil Lansvale Figures 4-6 Site Layout P ID Remediation System and Well Layout
- Mobil Lansvale Photographs
- Mobil Lansvale Appendix A EPA Agreement to VRP
- Mobil Lansvale Appendix B DIPNR's Input to EA Requirements
- Mobil Lansvale Appendix C RAP 1
- Mobil Lansvale Appendix C RAP 2
- Mobil Lansvale Appendix C RAP 3
- Mobil Lansvale Appendix C RAP 4
- Mobil Lansvale Appendix C Part 2 Addendum to RAP
- Mobil Lansvale Appendix D Part 1 EMP Report
- Mobil Lansvale Appendix D Part 2 EMP Figures
- Mobil Lansvale Appendix E Interim OPinion Letter From Auditor
- Mobil Lansvale Appendix F Auditors Review of EMP
- MP 05_0164
- Title: Proposed new building (USyd Central), the University of Sydney, Darlington Campus
- Approved: 8 August 2006
- Applicant: Capital Insight Pty Ltd
- Description: Construction of a new seven storey building (USyd Central Building) containing a mixture of uses incorporating, student support services, food outlets, retail, external plaza and a library. The new building will also interface with a proposed pedestrian bridge across City Road from the Camperdown Campus that is the subject of a separate approval.
- Location: Lot 1 in DP 790620 - 96-148 City Road, Darlington
- LGA: City of Sydney
- Capital cost of development: $54,200,000
- F/T Construction Jobs: 135
- Details: Director General's Report; Conditions of Approval; Preliminary Assessment; Director General's Environmental Assessment Requirements
- Major Project 05_0056, Sofitel Hotel, Sydney Olympic Park
- Title: Sofitel Hotel, Sydney Olympic Park
- Approved: 31 July 2006
- Applicant: TAHL Homebush Pty Ltd
- Description: Construction of an 18 storey, five star hotel
Construction of an 18 storey, five star hotel including:- 2 levels of basement car parking (120 spaces) linked to neighbouring hotels via an underground tunnel;
- 2 storey hotel lobby, reception, restaurant, lounge bar, kitchen and services at ground level;
- Retail shop at ground level facing Olympic Boulevard;
- Level 1 and the Mezzanine level will include conference facilities, gymnasium, business centre, hotel administration, plant room and hotel services; and
- Upper levels will comprise of hotel suites and guest rooms (total 212 rooms), an executive lounge and board room; and
- Plant rooms are located on the roof level.
- Location: Site 4A, Olympic Boulevard, Sydney Olympic Park
- LGA: Auburn Council
- Capital cost of development: $45 million
- F/T Construction Jobs: 130
- F/T Post Construction Jobs: 200
- Details: Director General's Environmental Assessment Report, Instrument of Approval, View other documents available
- 05_0195
- Title: Munmorah Gas Turbine Facility
- Approved: 31 July 2006
- Applicant:
- Description: Concept approval for the Munmorah Gas Turbine Facility and associated infrastructure and project approval for the construction and operation of a 600 megawatt gas-fired power station.
- Location: Part Lot 61 DP1065038
- LGA: Wyong Shire Council
- Capital cost of development: $382 Million
- F/T Construction Jobs: 100
- F/T Post Construction Jobs: 0
- Details:
- Concept Approval
- DG's Assessment Report
- Project Approval
- Major Projects Application Form
- Environmental Assessment Requirements
- Technical Paper 1
- Technical Paper 2
- Technical Paper 3
- Technical Paper 4
- Technical Paper 5
- Technical Paper 6
- Preferred Project Report
- Appendix A
- Appendix B
- Appendix C
- Appendix D
- Appendix E
- 06_0001
- Title: Proposed East Appin 66 kV Switching Station - West Cliff Coal Mine
- Approved: 29 July 2006
- Applicant: BHP Billiton Illawarra Coal Holdings Pty Ltd
- Description: Approval was provided for the construction and operation of an electricity supply switching station in order to improve the 11kV power supply to West Cliff Coal Mine, and includes:
- two 66/11kV transformers, electricity supply distribution switching station components, two demountable single level control buildings; and
- an access road, security fencing, switchyard lighting and four boreholes.
- Location: Lot 2 DP 522044, Appin Rd, about 1 km east of Appin, NSW.
- LGA: Wollondilly
- Capital cost of development: $3 million
- Employees: 3 employees
- Details: Project Approval, Assessment Report,