- MP 06_0020
- Title: Four Arrows Ethanol and Dairy Project, Coleambally
- Approved: 21 December 2007
- Proponent: Four Arrows Ethanol Pty Ltd
- Description: Construction and operation of an ethanol plant, intensive dairy and associated infrastructure.
- Location: Kidman Way, Coleambally
- Local government area: Murrumbidgee
- Capital cost of development: $100 million
- F/T construction jobs: 100
- F/T post construction jobs: 100
- Approval authority: Minister for Planning
- Relevant legislation: Section Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's assessment report, statement of commitments, project approval
- Documents available: Project application form and Preliminary Assessment (Pre-Planning Focus Meeting Report, Annexure Covers, Annexure 1A, Annexure 2 - Pictures & Plant Plan, Annexure 3 - Map 1, Annexure 4 - Map 2), Director-General's Environmental Assessment requirements, Environmental Assessment can be viewed online at: http://www.boothassociates.com.au/index.php?option=com_content&task=view&id=23&Itemid=38, Preferred Project Report and annexures (1, 2-8, 9-11, 12-14, 15-16, 17-19, 20-29)
- MP 06_0013
- Title: Upgrade of the fluidised catalytic cracking unit at Shell refinery, Clyde
- Approved: 21 December 2007
- Proponent: Shell Refining (Australia) Pty Ltd
- Description: Remove and replace degraded equipment within the fluidised catalytic cracking unit within its Clyde refinery, and increase its coke burning capacity to allow increased conversion of crude oil into petroleum and liquid petroleum gas.
- Location: Lot 1 DP 109739, Lot 2 DP 224288, Lot 101 DP 809340, Lot 398 DP 41324 and Lot 1 DP 383675, Durham, Rosehill
- Local government area: Parramatta
- Capital cost of development: $77.77 million
- F/T construction jobs: Up to 500
- F/T post construction jobs: None
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act
- Details of approval: Project Approval, Director-General's Report
- Additional information: Major Project Application, Preliminary Assessment (Part 1, Part 2) , Director-General's requirements for Environmental Assessment, Response to submissions
- 07_0044
- Title: Marstel Terminals Bulk Liquids Storage Facilit
- Approved: 21 December 2007
- Proponent: Marstel Terminals Newcastle Pty Ltd
- Description: Construction and operation of a bulk liquids storage facility and associated infrastructure
- Location: Greenleaf Road, Kooragang Island
- Local government area: Newcastle
- Capital cost of development: $47 million
- F/T construction jobs: 50
- F/T post construction jobs: 3
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act
- Details of approval: Director General's Assessment Report, Project Approval and Response to Submissions
- Additional information: Major Project Application and preliminary environmental assessment, Director-General's Requirements for Environmental Assessment. The Environmental Assessment can be viewed online at http://www.marstelterminals.com/News.htm - under 'Australian News'
- MP 05_0043
- Title: Two Residential Flat Buildings, Lot 104, 42 Walker Street, Rhodes
- Approved: 20 December 2007
- Proponent: Meriton Apartments Pty Limited
- Description: Construction of two residential flat buildings varying in height between 4 and 7 storeys, containing 75 apartments, two levels of basement car parking for 108 vehicles, associated landscaping, and strata subdivision
- Location: Lot 104, Precinct C, 42 Walker Street, Rhodes
- Local government area: City of Canada Bay
- Capital cost of development: $28,983,000
- F/T construction jobs: 1004
- F/T post construction jobs: 10-20
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act
- Details of approval: Director-General's assessment report, Project Approval
- Additional information: View project documents
- MP 07_0093
- Title: Interlink Industrial Estate
- Approved: 20 December 2007
- Proponent: Goodman International Limited
- Description: Construction and operation of four warehouses and associated infrastructure on the three remaining development lots in the Interlink Industrial Estate
- Location: Mamre Rd, Erskine Park
- Local government area: Penrith
- Capital cost of development: $57.4 million
- F/T construction jobs: 300
- F/T post construction jobs: 460
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act
- Details of approval: Director-General's assessment report, Project Approval, Project Approval Appendices p1-9, Project Approval Appendices p10-23, Project Approval Appendices p24-28
- MP 05_0142
- Title: Aldi Distribution Centre
- Approved: 20 December 2007
- Proponent: Aldi Foods Pty Ltd
- Description: Construction and operation of a warehouse/distribution centre and associated infrastructure
- Location: Ash Rd, Prestons
- Local government area: Liverpool
- Capital cost of development: $75 million
- F/T construction jobs: not known
- F/T post construction jobs: 110
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's assessment report part 1, Director-General's assessment report Part 2, Project Approval Appendix A Part 1, Project Approval Appendix A Part 2, Project Approval B & C, Project Approval and Response to Submissions
- Documents available: Major project application Director-General's requirements for Environmental Assessment. The Environmental Assessment report is available online at http://www.app.com.au/content/services/udp/udp2.htm
- MP 06_0242
- Title: Multi-Unit Residential Development, Site 1B, Precinct B, 40 Walker Street, Rhodes
- Approved: 19 December 2007
- Proponent: Renewing Homebush Bay Pty Ltd
- Description: Construction of 141 residential dwellings contained within 4 buildings ranging in height from 3 to 7 storeys, basement car parking over 2 levels containing a total of 178 spaces, provision of landscaping works and shared facilities and strata subdivision
- Location: Site 1B, Precinct B, 40 Walker Street, Rhodes (Lot 10 in DP 1007931)
- Capital cost of development: $50.6 million
- F/T construction jobs: 200
- F/T post construction jobs: 2
- Local government area: Canada Bay
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's assessment report and notice of approval
- Additional information: view documents
- MP 06_0301
- Title: Chatswood Chase Shopping Centre - Refurbishment and Expansion
- Approved: 19 December 2007
- Proponent: Colonial First State Property Management
- Description: Demolition of the existing office building at 19 Havilah Street and 8 Malvern Avenue; excavation of those sites to extend the two basement levels of Chatswood Chase car parking onto those sites; extension of the lower ground floor retailing of Chatswood Chase shopping centre onto those sites with reconfiguration of the loading docks and car parking access from Malvern Avenue; alterations and additions to ground level, and level 1 of the shopping centre including a new entry arrangement from Victoria Avenue; and, an increase in the gross floor area of 13,748 m2 and gross leasable floor area of 11,084m2
- Location: Lot 3 in DP 790756, Lot 1 in DP 806034 and Lot 1 in DP 74357, 345 Victoria Avenue, 19 Havilah Street and 8 Malvern Avenue, Chatswood
- Local government area: Willoughby
- Capital cost of development: $103,500,000
- F/T construction jobs: 460
- F/T post construction jobs: 520
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's assessment report (prepared by Willoughby Council) and notice of approval
- Additional information: View project documents
- MP 06_0320
- Title: River Sands Lodge, Corner Elm Street and McDonalds Place, Evans Head
- Approved: 19 December 2007
- Proponent: Paynter Dixon Constructions Pty Ltd
- Description: Demolition of an existing building, removal of site vegetation, construction of a two-storey 39 room hotel, one manager's dwelling, an in-ground swimming pool and additional car parking areas.
- Location: Lots 7-10 DP 14089, Corner Elm Street & McDonalds Place, Evans Head
- Local government area: Richmond Valley
- Capital cost of development: $3,568,000
- F/T construction jobs: 50
- F/T post construction jobs: 5
- Details of approval: Director-General's assessment report, Approval conditions
- Additional information: Major project application, DGRs, Environmental Assessment, Appendix A, Appendix B, Appendix C, Appendix D, Appendix E, Appendix F, Appendix G, Appendix H, Appendix I, Appendix J, Appendix K, Appendix L
- MP 06_0824
- Title: Botany Bay cable project
- Approved: 19 December 2007
- Proponent: EnergyAustralia
- Description: Construction and operation of a dual 132kV cable between the Bunnerong and Kurnell sub-transmission stations via the bed of Botany Bay using a combination of trenching, horizontal directional drilling and submarine techniques
- Location: From the Bunnerong substation, along Bunnerong/Military Roads in Matraville, along Bunnerong Road/ANZAC Parade to La Perouse, across Botany Bay to the Kurnell substation on Captain Cook Drive, Kurnell via Prince Charles Parade, Silver Beach Road and Captain Cook Drive
- Local government area: Randwick, Rockdale and Sutherland
- Capital cost of development: $110 million
- F/T construction jobs: 20
- F/T post construction jobs: 2
- Details of approval: Director-General's assessment report, conditions of approval
- Additional information: Part 3A declaration - ministerial Order (as gazetted on 26 September 2006); Applicant's covering letter (20 October 2006) and Project Application and form (23 October 2006); Director-General's Requirements for Environmental Assessment The Environmental Assessment report can be viewed online on the EnergyAustralia website at www.energy.com.au/botanybay proponent's submissions report including Preferred Project Report (September 2007) - cover and contents, chapter 1: introduction, chapter 2: consideration of environmental assessment, chapter 3: consideration of submissions, chapter 4: preferred project report, chapter 5: revised statement of commitments, chapter 6: conclusion, appendix B: submissions from government agencies
- MP 05_0058
- Title: Residential Subdivision - 'Rosarii', Gregory Street, South West Rocks
- Approved: 12 December 2007
- Proponent: Macleay Valley Property Group Pty Ltd
- Description: A 46-lot subdivision at South West Rocks, comprising 44 new residential lots, one residue lot containing an existing residence and a lot for an existing sewer pump station
- Location: Lot 2 DP 581117, 334-356 Gregory Street, South West Rocks
- Local government area: Kempsey
- Capital cost of development: $2,900,000
- F/T construction jobs: 15-20
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: View project documents
- MP 06_0289
- Title: Former Naval Stores, 2 Spurway Street, Ermington
- Approved: 12 December 2007
- Proponent: Stockland Development Pty Limited
- Description: Construction of five town houses and a residential flat building comprising 22 apartments.
- Location: Lot 1001 in DP 1040571 and Lot 1009 DP 1066557, 2 Spurway Street, Ermington
- Local government area: Parramatta
- Capital cost of development: $10,200,000
- F/T construction jobs: 47
- F/T post construction jobs: Nil
- Details of approval: Director-General's report, Ermington approval schedule 1, Ermington approval schedule 2
- Additional information: View project documents
- MP 07_0031
- Title: Asphalt Batching Plant, Tomago
- Approved: 12 December 2007
- Proponent: Tropic Asphalt Pty Limited
- Description: Construct and operate an asphalt-batching plant and associated infrastructure in the 'Hunter Industrial Park' at Tomago near Newcastle
- Location: Lots 14 and 15 Kennington Drive, Tomago
- Local government area: Port Stephens
- Capital cost of development: $1 million
- F/T construction jobs: not known
- F/T post construction jobs: 6
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: Major project application and Preliminary Environmental Assessment (lodged 19 February 2007); Director-General's requirements for Environmental Assessment Environmental Assessment with appendices A to F, G, H to L (exhibited 14 September to 17 October 2007)
- MP 05_0065 MOD 2
- Title: Invincible Open Cut Mine Extension - Auger Mining Modification
- Approved: Coalpac Pty Limited
- Proponent: 6 December 2007
- Description: This modification involves the introduction of auger mining techniques and an increase in approved coal production from 350,000 to 500,000 tonnes a year
- Location: Castlereagh highway, about 24 kilometres northwest of Lithgow
- Local government area: Lithgow
- Capital cost of development: Nil
- F/T construction jobs: An increase of 5 to 15 F/T jobs.
- F/T post construction jobs: $1,000,000
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of modification approval
- Additional information: Preliminary environmental assessment for modification application (lodged 20 April 2007); Director-General's requirements for Environmental Assessment (issued 28 May 2007). The Environmental Assessment (public exhibited 17 October to 16 November 2007) is available online at http://www.rwcorkery.com/projectnews.html
- MP 06_0294 MOD 1
- Title: Early Works for Studio/Office Complex at Australian Technology Park, Eveleigh
- Approved: 5 December 2007
- Proponent: Sydney Broadcast Property Pty Ltd
- Description: Modification of Condition A1(1) of the development description and the scope of works in two stages and modify and delete Condition B2
- Location: Lot 500 DP 1033739, Australian Technology Park
- Local government area: City of Sydney
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of modification approval and consolidated consent (as amended)
- Additional information: Modification application form and modification proposal (received on 31 July 2007)
- MP 05_0170 MOD 1
- Title: Modification to Conroy's Gap Wind Farm Project
- Approved: 2 December 2007
- Proponent: Epuron Pty Ltd
- Description: Proposed modification to Conroy's Gap Wind Farm to correct a minor misdescription of the land to which the project approval applies
- Location: approximately 17 kilometres west of Yass off Black Range Road, on the NSW Southern Tablelands
- Local government area: Yass
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Details of approval: Director-General's Assessment Report and notice of modification approval
- Additional information: Modification request. Note details of the original project approval are listed below on the Notices of Determination page (see MP 05_0170 - Conroy's Gap Wind Farm - approved 31 May 2007)
- MP 06_0226
- Title: Southern Distribution Business Park - Concept Plan
- Approved: 30 November 2007
- Proponent: Southern Distribution Hub Pty Ltd
- Description: An integrated logistics, service, warehousing and distribution park and associated infrastructure works
- Location: Four kilometres south of Goulburn, adjacent to the Hume Highway
- Local government area: Goulburn Mulwaree
- Capital cost of development: $1 billion
- F/T construction jobs: N/A
- F/T post construction jobs: 3000
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: Major project application (6 February 2007); Director-General's requirements for Environmental Assessment (issued 5 February 2007); the Environmental Assessment (publicly exhibited 14 February to 19 March 2007) can be viewed online at http://site.sdh.net.au/index.php; Response to submissions (May 2007)
- MP 05_0021 MOD 1
- Title: Modifications to Wilpinjong Coal Project
- Approved: 30 November 2007
- Proponent: Wilpinjong Coal Pty Limited
- Description: The modification approval provides for: changing access arrangements for the mine to the Ulan-Wollar Road, via Ulan Road; and, increasing blast frequency to a maximum of 2 blasts a day, and 5 blasts a week on average over any 12 month period
- Location: Wilpinjong, 45 km northeast of Mudgee
- Local government area: Mid-Western Regional
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: Existing staff
- Details of approval: Director-General's Assessment Report and notice of modification approval
- Additional information: Project application (29 January 2007), Director-General's requirements for Environmental Assessment (12 February 2007), the proponent's response to submissions. The Environmental Assessment (exhibited 4 May to 18 May 2007) and other project documents are available online at www.peabodyenergy.com.au/nsw/wilpinjong-documents.html
- MP 06_0245 MOD 1
- Title: Hume Highway Duplication - Sturt Highway to Tarcutta - Modification
- Approved: 28 November 2007
- Proponent: Roads and Traffic Authority of NSW
- Description: Realignment of the duplication between chainages 38000 and 40400 from the eastern side to the western side of the existing carriageway
- Location: Hume Highway between the Sturt Highway junction and Tarcutta
- Local government area: Wagga Wagga
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: section 75W in Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Notice of modification approval and consolidated consent (as amended)
- Additional information: Covering letter, modification request and realignment report with Appendix A, Appendix B, Appendix C (part 1, part 2, part 3, part 4) and Appendix D
- MP 06_0009 MOD 1
- Title: Newcastle Coal Infrastructure Group Coal Export Terminal, Kooragang Island
- Approved: 27 November 2007
- Proponent: Newcastle Coal Infrastructure Group (NCIG)
- Description: Subdivision of land to facilitate the registration of a 30 year lease by the State Property Authority to allow for the construction and operation of the NCIG coal export terminal project
- Location: Kooragang Island, Newcastle
- Local government area: Newcastle
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: 75W, Part 3A of Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: Modification request (23 October 2007) - including letter, project description report, application form and proposed plan of subdivision (concept plan); letter with revised proposed plan of subdivision (5 November 2007)
- MP 06_0179
- Title: Vopak Biodiesel Facility, Botany
- Approved: 26 November 2007
- Proponent: Vopak Terminals Sydney Pty Ltd
- Description: Construct and operate a biodiesel facility at Vopak’s terminal in Port Botany
- Location: 49 Friendship Road, Port Botany
- Local government area: Randwick
- Capital cost of development: $60 million
- F/T construction jobs: 30-50
- F/T post construction jobs: 8
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and project approval
- Additional information: Major project application, preliminary environmental assessment, Director-General’s requirements for Environmental Assessment. The Environmental Assessment is available online at: www.ghd.com.au/aptrixpublishing.nsf/Content/SydneyBiodieselTerminal
- 06_0246 MOD 1 and 06_0248 MOD 1
- Title: Hume Highway Duplication - Modifications to Kyeamba Hill and Yarra Yarra to Holbrook Projects
- Approved: 19 November 2007
- Proponent: NSW Roads and Traffic Authority
- Description: The modifications involve:
- Kyeamba Hill (MP 06_0246 MOD 1): amendment to the approved alignment in the vicinity of chainages 72050 to 72150, 71500 to 71600 and 70700 to 71600
- Yarra Yarra to Holbrook (MP 06_0248 MOD 1): amendment to the approved alignment in the vicinity of chainages 108700 and 101100 to 101400
- Location: Kyeamba Hill: Hume Highway between approximately 67 kilometres south of Gundagai to 76 kilometres south of Gundagai; and Yarra Yarra to Holbrook: Hume Highway between approximately 98 kilometres south of Gundagai to 110 kilometres south of Gundagai
- LGA/s: Wagga Wagga and Greater Hume Shire
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Section 75W of the Environmental Planning and Assessment Act 1979
- Details of approval: Kyeamba Hill: modification approval and consolidated approval (as amended); Yarra Yarra to Holbrook: modification approval, consolidated approval (as amended)
- Additional information: Kyeamba Hill:
Modification request and
modification assessment report with appendices
A,
B,
C,
E
Yarra Yarra to Holbrook: Modification request and modification assessment report with appendices A, B, C, E, F1, F2 - MP 07_0077
- Title: Demolition Works - Barangaroo, East Darling Harbour
- Approved: 15 November 2007
- Proponent: Sydney Harbour Foreshore Authority
- Description: Demolition works at Barangaroo. Stage 1: Demolition works including transit sheds 3, 4, 5 and 6 and shade cloth structure. Stage 2: Demolition of transit shed 8; entry gatehouse; light towers; vehicle wash down bay; diesel/gas tanks and storage shed; Sydney Ports Office buildings; Sydney Ports amenities building and services decommissioning
- Location: Barangaroo, East Darling Harbour - Lots 3 and 5 DP 876514
- Local government area: City of Sydney
- Capital cost of development: Stage 1: $4,215,000 and Stage 2: $ 915,000
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: View project documents
- MP 05_0042
- Title: Residential Development, 42 Walker Street, Lot 103, Precinct C, Rhodes
- Approved: 13 November 2007
- Proponent: Meriton Apartments Pty Ltd
- Description: Construction of 47 residential dwellings within 2 buildings ranging in height from 4 to 5 storeys, 2 levels basement car park containing 69 spaces, and landscaping works
- Location: Lot 103, Precinct C, 42 Walker Street, Rhodes
- Local government area: Canada Bay
- Capital cost of development: $19,338,000
- F/T construction jobs: 90
- F/T post construction jobs: 10
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General Assessment Report and notice of approval
- Additional information: View project documents
- MP 05_0110
- Title: Residential Development, 40 Walker Street, Site 1A, Precinct B, Rhodes
- Approved: 13 November 2007
- Proponent: Billbergia Development Pty Ltd
- Description: Construction of 256-unit residential development within four buildings, basement parking with 319 spaces, landscaping works, shared facilities and strata subdivision
- Location: Site 1A, Precinct B, 40 Walker Street, Rhodes
- Local government area: Canada Bay
- Capital cost of development: $63,470,000
- F/T construction jobs: 200
- F/T post construction jobs: 5
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: View project documents
- MP 05_0102
- Title: Narrabri Coal Project
- Approved: 13 November 2007
- Proponent: Narrabri Coal Pty Limited
- Description: Construction and operation of the Narrabri underground coal mine and associated infrastructure
- Location: Adjacent to the Kamilaroi Highway, Baan Baa, about 28 km southwest of Narrabri, NSW
- Local government area: Narrabri
- Capital cost of development: $50 million
- F/T construction jobs: up to 60
- F/T post construction jobs: up to 113
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and project approval
- Additional information: Project Application, Project Description, Environmental Assessment Requirements, Environmental Assessment Report (available on the Proponent's website), Proponent's Response to Submissions, Revised Statement of Commitments, Preferred Project Report
- MP 06_0239
- Title: Woodlawn Alternative Waste Technology Facility
- Approved: 6 November 2007
- Proponent: Veolia Environmental Services (Australia) Pty Ltd
- Description: Construct and operate an alternative waste treatment facility at Woodlawn Eco-Precinct
- Location: Collector Road, Tarago
- LGA/s: Goulburn Mulwaree and Palerang
- Capital cost of development: $15.4 million
- F/T construction jobs: 25
- F/T post construction jobs: 18
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: Major Project Application (4 September 2006); Director-General's Requirements for Environmental Assessment (30 June 2005). The proponent's project documentation, including the Project Planning Focus Document, Environmental Assessment and Response to Submissions can be viewed online at: http://www.umwelt.com.au/collex_woodlawn/downloads.asp
- MP 07_0035
- Title: Baal Bone Colliery - Ventilation Shaft and Power Line Project
- Approved: 24 October 2007
- Proponent: Wallerawang Collieries Limited
- Description: Construction of a ventilation system consisting of a ventilation shaft, exhaust fan and power source for the purpose of facilitating further coal extraction
- Location: Baal Bone Colliery, approximately 25 kilometres northwest of Lithgow
- Local government area: Lithgow
- Capital cost of development: $1.7 million
- F/T construction jobs: 10
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: Major project application (12 March 2007), location map and Preliminary Environmental Assessment; Director-General's requirements for Environmental Assessment (10 April 2007). The Environmental Assessment report exhibited for comment 6 July to 6 August 2007 can be viewed online at http://www.umwelt.com.au/baal-bone/. Response to submissions (September 2007)
- MP 06_0192 MOD 1
- Title: Royal North Shore Hospital Research and Education Facility - Modification
- Approved: 23 October 2007
- Proponent: NSW Health
- Description: Minor amendments to the height, width and external appearance of the approved facility
- Location: Royal North Shore Hospital - Corner of Westbourne Street and Reserve Road, St Leonards (Lot 21 DP863329)
- Local government area: Willoughby
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Executive Director, Strategic Sites and Urban Renewal as delegate of the Minster for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of modification approval
- Additional information: View project documents
- MP 07_0054
- Title: Kurnell Desalination Project - Desalinated Water Delivery System
- Approved: 22 October 2007
- Proponent: Sydney Water Corporation
- Description: Construction and operation of the desalinated water delivery system associated with the concept plan for the Kurnell Desalination Project, including:
- an 1800 millimetre diameter pipeline from the desalination plant site at Kurnell to Silver Beach, via the road and road reserve, with a length of approximately two kilometres;
- two 1400 millimetre diameter pipelines across Botany Bay, from Silver Beach to Cook Park, Kyeemagh, with a length of approximately eight kilometres; and
- an 1800 millimetre diameter pipeline from Cook Park, Kyeemagh to Shaft 11C on the City Tunnel at Erskineville, passing through/ along a mixture of roads and road reserves, public open space and railway goods yards, with a length of approximately 8.3 kilometres
- Location: Lands comprising the bed of Botany Bay and within the suburbs of Kurnell, Kyeemagh, Arncliffe, Tempe, St Peters, Alexandria and Erskineville, between the site of the approved Kurnell desalination plant and the existing Sydney Water Corporation water supply system
- Local government area: Sutherland, Rockdale, Marrickville, Sydney
- Capital cost of development: $348 million
- F/T construction jobs: 600
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and Project Approval
- Additional information: View project documents
- MP 06_0273
- Title: Site 4B, Sydney Olympic Park
- Approved: 19 October 2007
- Proponent: Bovis Lend Lease
- Description: Construction of a seven-storey commercial office building and associated landscaping works. The ground floor will contain a café and a retail/commercial space. Five levels of basement parking for 369 cars will also be provided
- Location: Olympic Boulevard, Sydney Olympic Park (Lot 60 DP 786296 & Pt Lot 50 DP 1045522)
- Local government area: Auburn
- Capital cost of development: $84,613,718
- F/T construction jobs: 300
- F/T post construction jobs: 2000
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: View project documents
- MP 06_0090
- Title: Residential Subdivision, Jamieson Road, North Nowra
- Approved: 15 October 2007
- Proponent: Evelution Pty Ltd
- Description: 350-lot residential subdivision with associated roads and civil works
- Location: Jamieson Road, North Nowra - Lot 118 and 119, DP 751258
- Local government area: Shoalhaven
- Capital cost of development: $1,500,000
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: Application letter (19 May 2006) and Preliminary Environmental Assessment; Director-General's requirements for Environmental Assessment (July 2006); Environmental Assessment (Volume 1 and Volume 2) (exhibited 16 February to 19 March 2007); Proponent's response to submissions
- MP 07_0050 MOD 2
- Title: Modification to Albury Wodonga National Freeway Project
- Approved: 14 October 2007
- Proponent: NSW Roads and Traffic Authority
- Description: Modifications to the Table Top to Mullengandra section of the project, which involve: closure of the existing level-crossing of the Main Southern Railway at Perryman’s Lane; and shifting the approved alignment at chainage 2500, approximately 160 metres to the south, encroaching on the northwest corner of Sages Reserve
- Location: Between Table Top and Mullengandra
- Local government area: Albury City and Greater Hume Shire
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Section 75W, Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Modification approval and consolidated approval (as modified)
- Additional information: Modification request (26 June 2007) and Environmental Review (main report; Appendix B; Appendix C - part 1, part 2 and part 3; Appendix D and E; Appendix F; Appendix G)
- MP 06_0310 MOD 1
- Title: Luxury Tourist Resort, Wolgan Valley
- Approved: 10 October 2007
- Proponent: Emirates Hotels (Australia) Pty Ltd
- Description: Modifications to the design and layout of the staff accommodation
- Location: Wolgan Valley
- Local government area: Lithgow
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and modification approval
- Additional information: Modification application (20 September 2007)
- MP 06_0022 MOD 1
- Title: Used Oil Transfer Station, St Marys
- Approved: 10 October 2007
- Proponent: Klekies Pty Ltd
- Description: Alterations to the layout of the site including the relocation of the access, tank farm and car park. The modifications also include a reduction in the capacity of the bunded area and changes to the external finish of the warehouse/office building
- Location: 85 Christie Street, St Marys
- Local government area: Penrith
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General’s Assessment Report, modification approval and consolidated approval (as modified)
- MP 07_0029
- Title: Redevelopment of former Rachel Forster Hospital, Redfern
- Approved: 9 October 2007
- Proponent: Redfern Waterloo Authority
- Description: The approved Concept Plan comprises four residential building envelopes, including the retention and adaptive use of an existing heritage building and colonnade, and publicly accessible open space
- Location: 134-144 Pitt Street, Redfern (Lot 7 DP 664804)
- Local government area: City of Sydney
- Capital cost of development: $44.13 million
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: View project documents
- MP 07_0021
- Title: Shoalhaven Starches Flour Mill Project
- Approved: 8 October 2007
- Proponent: Shoalhaven Starches Pty Ltd
- Description: Construct and operate a flour mill at the existing Shoalhaven Starches factory
- Location: 160 Bolong Road, Bomaderry
- Local government area: Shoalhaven
- Capital cost of development: $12 million
- F/T construction jobs: 20
- F/T post construction jobs: 8
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: Project application (29 March 2007), Preliminary Assessment (December 2006) and Director-General’s requirements for Environmental Assessment (10 April 2007). The Environmental Assessment documentation (exhibited 5 July to 6 August 2007) can be viewed online at http://www.manildra.com.au/community/proposed_mill.php, Response to Submissions report (August 2007)
- MP 06_0267
- Title: National Indigenous Development Centre (Former Redfern Public School)
- Approved: 4 October 2007
- Proponent: Indigenous Land Corporation
- Description: The approved National Indigenous Development Centre comprises a new 3 storey multipurpose sport and recreation centre, heated swimming pool, 1 and 2 storey child care centre, multi-code football field, adaptive reuse of existing school buildings for educational, commercial and dormitory uses, demolition of existing toilets blocks and associated landscaping
- Location: 160-202 George Street, Redfern (Lots 1, 2 and 4 DP 817283)
- Local government area: City of Sydney
- Capital cost of development: $30,677,631
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: View project documents
- MP 06_0288
- Title: Water Supply Pipeline - West Cliff Coal Mine
- Approved: 26 September 2007
- Proponent: BHP Billiton Illawarra Coal Holdings Pty Ltd
- Description: The construction and operation of a water supply pipeline between the Appin and West Cliff coal mines
- Location: West Cliff Coal Mine, near Appin
- Local government area: Wollondilly
- Capital cost of development: $0.6 million
- F/T construction jobs: 6
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Report and notice of approval
- Additional information: Project Application and Preliminary Environmental Assessment (25 October 2006); Director-General's requirements for Environmental Assessment (issued 15 December 2006); the Environmental Assessment document (publicly exhibited 12 June to 12 July 2007) is available online at http://illawarracoal.bhpbilliton.com/operations_and_projects/development_applications.asp Response to Submissions (August 2007)
- MP 06_0285
- Title: Coffs Harbour Water Treatment Plant
- Approved: 26 September 2007
- Proponent: Coffs Harbour City Council
- Description: Construction of a water treatment plant and associated facilities at Karangi. These facilities include aboveground treated water storage and wash water holding tank, emergency storage containment lagoon, control building and pump station
- Location: 140 Upper Orara Road, Karangi
- Local government area: Coffs Harbour
- Capital cost of development: $32 million
- F/T construction jobs: 80
- F/T post construction jobs: 4
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of project approval and conditions
- Additional information: View project documents
- MP 06_0162 MOD 1
- Title: Barangaroo Concept Plan - Modification
- Approved: 25 September 2007
- Proponent: Sydney Harbour Foreshore Authority
- Description: Correction of minor typographical errors in the concept plan notice of determination, and rewording of design excellence modification
- Location: Lots 1 to 6 DP 876514; Lot 7 DP 43776; Lot 100 DP 838323; Lots 6 and 7 DP 869022
- Local government area: City of Sydney
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Notice of modification approval, and consolidated approval (as amended)
- Additional information: Modification request (9 August 2007)
- MP 05_0117
- Title: Moolarben Coal Project
- Approved: 7 September 2007
- Proponent: Moolarben Coal Mines Pty Ltd
- Description: Construction and operation of an open-cut and underground coal mining operation and associated infrastructure
- Location: 40km northeast of Mudgee, east of the village of Ulan in central west NSW
- Local government area: Mid-Western Regional
- Capital cost of development: $405 million
- F/T construction jobs: 220
- F/T post construction jobs: 320
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979 (NSW), Environment Protection and Biodiversity Conservation Act 1999 (Commonwealth)
- Details of approval: Director-General's Assessment Report and notice of approval and conditions
- Additional information:
Project application (20 December 2005) and
Preliminary Assessment (December 2005);
Director General's requirements for Environmental Assessment (issued 16 March 2006);
Independent panel of experts' terms of reference,
Report of the Independent Hearing and Assessment Panel (February 2007) and
addendum regarding groundwater review (August 2007). Note: The proponent's Environmental Assessment (publicly exhibited 18 September to 23 October 2006 - EP&A Act requirement), Response to Submissions (publicly exhibited 25 July to 10 August 2007 - EPBC Act requirement) and groundwater reports are available online at
http://www.moolarbencoal.com.au/Major%20Project%20Applcation.htm
- MP 05_0147
- Title: Intermodal Logistics Centre - Enfield
- Approved: 5 September 2007
- Proponent: Sydney Ports Corporation
- Description:
Construction and operation of the Enfield Intermodal Logistics Centre with capacity to accept a maximum throughput of 300,000 TEU (one TEU is equivalent to one twenty-foot container) per annum, including:
- demolition, relocation or removal of former railway buildings and structures
- earthworks and drainage including the levelling of the site, formation of landscape mounds and detention basins and removal of unsuitable materials, as required
- construction and operation of:
- an intermodal terminal for the loading and unloading of containers
- rail sidings, railway lines and associated works to connect to the existing freight line
- warehousing for the packing and unpacking of containers and the short-term storage of cargo
- empty container storage facilities, for the storage of empty containers to be later packed or transferred back to the port or regionally by rail
- light industrial/commercial area fronting Cosgrove Road
- access works including the construction of a road bridge over the new marshalling yards for access to Wentworth Street and an upgrade of the entrance to the site from Cosgrove Road
- internal roads, administration buildings, diesel and LPG storage and fuelling facilities, container washdown area, vehicle maintenance shed, and installation of site services (all utilities, stormwater and sewerage)
- Location: Lot 2, DP 1006861, Lot 3 DP 1006861, Lot 101 DP 1001498, Lot 14 DP1007302, Lot 15 DP 1007302, Lot 1 DP 950438, Railway land as denoted on sheets 2 and 4 of DP 242426, Cosgrove Road, South Strathfield
- Local government area: Strathfield
- Capital cost of development: $153,000,000
- F/T construction jobs: 170
- F/T post construction jobs: 510
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Project approval, Director-General's Assessment Report and Independent Hearing and Assessment Panel Report
- Additional information: View project documents
- MP 05_0192 MOD 40-5-2007
- Title: Pottsville North Holiday Park
- Approved: 3 September 2007
- Proponent: Tweed Coast Holiday Parks Reserve Trust
- Description: Alterations and additions to parts of the Pottsville North Holiday Park to provide 20 additional long term sites and the deletion of eight short term sites. Eighteen of the 20 long term sites will revert to short term sites once the initial tenants vacate the sites
- Location: Lots 1 and 2 DP 731761, Lot 7016 DP 1055269, Lot 522 DP 822808, Tweed Coast Road, Pottsville
- Local government area: Tweed
- Capital cost of development: $500,000
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of modification approval
- Additional information: Modification application, Environmental Assessment and plan of alterations and additions (5 May 2007)
- MP 06_0207 MOD 1
- Title: Mixed Use Retail and Commercial Development, Tweed Heads
- Approved: 3 September 2007
- Proponent: Masada Investments Pty Ltd
- Description: Modification to a Part 3A Major Project approval for a four-storey development comprising ground floor office and retail, three levels of commercial office space and two levels of basement car parking. The modification is to: amend condition B17 to reduce the number of bicycle spaces from 42 to 15 spaces; and delete Condition G2 to permit one loading bay on Frances Street
- Location: Lot A and B DP 373378, 75 and 77 Wharf Street, Tweed Heads
- Local government area: Tweed
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979 and State Environmental Planning Policy (Major Projects) 2005
- Details of approval: Director-General's Assessment Report and notice of modification approval
- Additional information: Application form; proposed modification and environmental assessment
- MP 06_0248 and MP 06_0249
- Title: Hume Highway Duplication - Project Applications (Yarra Yarra to Holbrook; Woomargama to Mullengandra)
- Approved: 29 August 2007
- Proponent: NSW Roads and Traffic Authority
- Description: Proposal to upgrade five segments of the Hume Highway to achieve four lanes of dual carriageway. On 20 July 2007, approval was granted to the overall Concept Plan (MP 06_0314) for the total 45 kilometres, and project approval for the specific works associated with the three northern segments: Sturt Highway to Tarcutta (MP 06_0245), Kyeamba Hill (MP 06_0246) and Little Billabong (MP 06_0247) – see determination notice 20 July 2007 below. On 29 August 2007, approval was granted for the remaining two southern segments:
- Yarra Yarra to Holbrook (MP 06_0248) approximately 98 to 110 kilometres south of Gundagai (approximately twelve kilometres)
- Woomargama to Mullengandra (MP 06_0249) approximately 131 to 141 kilometres south of Gundagai (approximately ten kilometres)
- Location: Hume Highway between the Sturt Highway junction and Mullengandra
- Local government area: Wagga Wagga and Greater Hume
- Capital cost of development: $338 million
- F/T construction jobs: F/T construction jobs: 400
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report; and project approvals (MP 06_0248 and MP 06_0249)
- Additional information: View project documents
- MP 06_0158
- Title: South West Rail Link
- Approved: 29 August 2007
- Proponent: Transport Infrastructure Development Corporation
- Description: The construction and operation of the South West Rail Link being: a heavy railway off the East Hills line generally between the Glenfield station area and East Rossmore; and, associated infrastructure including stations, train-stabling, roadways, car parks, bus interchanges, public amenities and intermodal facilities
- Location: Between Glenfield and East Rossmore
- Local government area: Liverpool, Camden, Campbelltown
- Capital cost of development: N/A
- F/T construction jobs: 600
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report, concept plan approval and project approval for the Stage A (Glenfield Rail Corridor) project
- Additional information: Declared a Part 3A project 9 April 2006; preparation of a Concept Plan authorised 3 July 2006; and Director General's requirements for environmental assessment issued 12 July 2006. The proponent’s Project Application and Preliminary Environmental Assessment (24 May 2006), Environmental Assessment (exhibited 22 November 2006 to 2 February 2007) and Submissions Report (8 May 2007) can be viewed online at http://www.tidc.nsw.gov.au/SectionIndex.aspx?PageID=932
- MP 06_0168
- Title: Snapper Mineral Sands Project
- Approved: 28 August 2007
- Proponent: BEMAX Resources NL
- Description: Establishing the Snapper Mineral Sands mine. This will involve: extracting approximately 8.2 million tonnes of ore a year for up to 16 years; onsite processing of up to 450,000 tonnes of mineral concentrate each year; transporting the concentrate to Broken Hill for further treatment; and, progressive rehabilitating the site
- Location: 170 kilometres south of Broken Hill and approximately kilometres southwest of Pooncarie
- Local government area: Wentworth
- Capital cost of development: $105 million
- F/T construction jobs: 250
- F/T post construction jobs: 110
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval and conditions
- Additional information: Project application and Preliminary Assessment (27 July 2006) and Director-General's requirements for Environmental Assessment. The Environmental Assessment (exhibited 23 March to 27 April 2007) can be viewed online at http://www.bemax.com.au/snapperenvirodocs.asp. Response to submissions
- MP 05_0039 MOD1
- Title: Modification to Residential and Retail Development, Rhodes
- Approved: Meriton Apartments Pty Ltd
- Proponent: 24 August 2007
- Description: Modification of a Part 3A major project for 179 residential units and retail facility in three buildings, basement car parking and associated landscaping, to increase the size of the basement car park levels to provide an additional 51 parking spaces
- Location: Lot 100, Precinct C, 42 Walker Street, Rhodes
- Local government area: City of Canada Bay
- Capital cost of development: $51,027,929
- F/T construction jobs: 100
- F/T post construction jobs: 10–30
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979 and State Environmental Planning Policy (Major Projects) 2005
- Details of approval: Director-General's Assessment Report, notice of approval and conditions
- Additional information: Modification application (received 25 July 2007); revised plans (deep soil, car park level 1, car park level 2)
- MP 06_0002
- Title: Coastal Grove Residential Subdivision, Survey Street, Lennox Head
- Approved: 23 August 2007
- Proponent: SAKE Development
- Description: A 42-lot subdivision comprising 39 residential lots, one residual lot for open space dedication and two residual lots for vegetation conservation
- Location: Lot 2 DP 622475: 1 Survey Street, Lennox Head
- Local government area: Ballina
- Capital cost of development: $3.15 million
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General’s Environmental Assessment Report, notice of approval and conditions
- Additional information: Project application lodged 16 March 2006; Environmental Assessment exhibited 19 October to 17 November 2006. Project documentation available: Preliminary Environmental Assessment; Director-General's requirements for Environmental Assessment (issued 15 May 2006); amended geotechnical report and amended geotechnical information; amended drainage letter and amended drainage information; Preferred Project Report (22 June 2007); amended Statement of Commitments (July 2007); landscape plan(revised 6 July 2007); revised conceptual stormwater management strategy plan (6 July 2007), subdivision plan plan (20 June 2007)
- MP 05_0050 MOD 2
- Title: St Vincent’s Research and Biotechnology Precinct - Bicycle Ramp
- Approved: 21 August 2007
- Proponent: Savills (Aust) Pty Ltd
- Description: Modification of a Part 3A major project for St Vincent’s Research and Biotechnology Precinct to include a bicycle ramp
- Location: Lot 29 in DP 881417 at 405-411 Liverpool Street, Darlinghurst
- Local government area: City of Sydney
- Capital cost of development: $55,574,000
- F/T construction jobs: 150
- F/T post construction jobs: 270
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979 and State Environmental Planning Policy (Major Projects) 2005
- Details of approval: Director-General's Assessment Report, notice of approval and conditions
- Additional information: Modification request
- MP 07_0033 MOD 1
- Title: Modification to F3 Freeway to Branxton Link Project
- Approved: 19 August 2007
- Proponent: NSW Roads and Traffic Authority
- Description: The modification involves altering the alignment of the project at the Sugarloaf Range, the configuration of the Kurri Kurri interchange and the alignment and configuration of the project between Tuckers Lane and Black Creek. Also the inclusion of road-related ancillary infrastructure in the approval, including boundary fencing and water quality controls
- Location: Between F3 Freeway at Seahampton and New England Highway west of Branxton
- Local government area: Cessnock, Lake Macquarie, Maitland and Singleton
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: section 75W of the Environmental Planning and Assessment Act 1979
- Details of approval: Modification approval and consolidated approval (as modified)
- Additional information: View project documents
- MP 07_0083 MOD1
- Proposal Title: Modification to Windsor Flood Evacuation Route
- Approved: 4 August 2007
- Proponent: Roads and Traffic Authority
- Description: Modification to the Minister’s condition of approval no. 34 (pedestrian and cyclists) to permit opening of the evacuation route prior to completion of the shared pedestrian and cycleway beside Windsor Road
- Location: A 2.6km road link between Day Street, Windsor and Railway Road, South Mulgrave as part of the Hawkesbury-Nepean Floodplain Management Strategy
- Local government area: Hawkesbury
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: A/Executive Director, Major Project Assessments as delegate of the Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Assessment Report and modification approval
- Additional information: Modification request
- MP 05_0179 MOD 1
- Title: Modification to the Capital Wind Farm Project
- Approved: 3 August 2007
- Proponent: Renewable Power Ventures
- Description: Modification to Condition No. 7 (Planning Agreement regarding Taylors Creek Road) - to make it consistent with Palerang Council's resolution and to amend the timeframe for the preparation of the Planning Agreement
- Location: On the Great Dividing Range approximately 40 kilometres north-east of Canberra and 10 kilometres south-west of Tarago, NSW
- LGAs: Palerang and Goulburn-Mulwaree
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and modification approval
- Additional information: Modification request received 16 July 2007
- MP 06_0031 MOD 1
- Title: Modification to Dan Lands Concept Plan and Project Approval
- Approved: 24 July 2007
- Proponent: Planning Workshop Australia
- Description: Amendment to the timing of release of subdivision stages (in project approval); removal of requirement for two cycle ways (Condition A.3.2 of the statement of commitments); incorporation of community recreation facilities comprising a swimming pool, tennis court, meeting rooms, change rooms and associated car parking facilities (in concept plan); and, allowing the issuing of construction certificates by an accredited certifier (Condition B4 of the project approval)
- Local government area: Newcastle
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Director-General of the Department of Planning as delegate of the Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Modification approval and consolidated approval (incorporating changes)
- Additional information: Modification request; request to modify Condition B4 of the project approval; Concept Plan; Statement of Commitments (revised); Landscape Master Plan; Vegetation Management Plan (amended); Staging Plan
- MP 07_0098 MOD 1
- Title: Modifications to Pacific Highway Upgrade - Karuah to Bulahdelah
- Approved: 23 July 2007
- Proponent: NSW Roads and Traffic Authority
- Description: Modification of the project approval (granted 21 February 2002) to permit deletion of pedestrian access requirements at the Whimbrel Drive interchange (noting that such access is no longer required)
- Location: Land between approximately 4 kilometres north of the Karuah Bridge, Karuah and approximately 4.1 kilometres south of the Myall River Bridge, Bulahdelah
- Local government area: Great Lakes
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: A/Executive Director, Major Project Assessments, as delegate of the Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Modification approval
- Additional information: Modification request
- MP 06_0044_MOD 1
- Title: Australian Museum Project Application Modification
- Approved: 23 July 2007
- Proponent: Reed Constructions on behalf of the Australian Museum
- Description: Reed Constructions (on behalf of the Australian Museum) is seeking approval to extend construction working hours on Saturdays between 1pm and 5pm, from the approved construction hours of 8am to 1pm
- Location: College Street, Sydney
- Local government area: City of Sydney
- Capital cost of development: NA
- F/T construction jobs: NA
- F/T post construction jobs: NA
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Modification approval and conditions
- Additional information: Application letter (Reed Constructions); confirmation of application (Australian Museum)
- MP 06_0314, MP 06_0245, MP 06_0246 and MP 06_0247
- Title: Hume Highway Duplication - Concept Plan and 3 of 5 Project Applications (Sturt Highway to Tarcutta, Kyeamba Hill and Little Billabong)
- Approved: 20 July 2007
- Proponent: NSW Roads and Traffic Authority
- Description: Proposal to upgrade five segments of the Hume Highway to achieve four lanes of dual carriageway. Approval has been granted to the overall Concept Plan (MP 06_0314) for the total 45 kilometres, and project approval for the specific works associated with the three northern segments:
- Sturt Highway to Tarcutta (MP 06_0245), from approximately 37 kilometres to approximately 43 kilometres south of Gundagai (approximately six kilometres)
- Kyeamba Hill (MP 06_0246), from approximately 67 kilometres to approximately 76 kilometres south of Gundagai (approximately nine kilometres)
- Little Billabong (MP 06_0247), from approximately 85 kilometres to approximately 93 kilometres south of Gundagai (approximately eight kilometres).
Note: The remaining two segments, Yarra Yarra to Holbrook (MP 06_0248) and Woomargama to Mullengandra (MP 06_0249) were approved 29 August 2007 - see determination notice above - Location: Hume Highway between the Sturt Highway junction and Mullengandra
- LGAs: Wagga Wagga and Greater Hume
- Capital cost of development: $338 million
- F/T construction jobs: 400 (for total project)
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report, concept plan approval (MP 06_0314) and project approvals (MP 06_0245, MP 06_0246 and MP 06_0247)
- Additional information: View project documents
- MP 06_0181
- Title: Southern Employment Lands - Greystanes Industrial and Commercial Development
- Approved: 20 July 2007
- Proponent: Boral
- Description: Concept approval for an industrial precinct, a 97,500 sq m business park, 6,500 sq m of retail space, and an urban design plan for the future development. Project approval for subdivision and construction of associated infrastructure
- Location: Southern Employment Lands – Greystanes Estate, Prospect (Lot 507 DP1042806, Lots 12-15 DP1031817, Lot 308 DP 1035614, Lot 8 DP 235064, Lot 140 DP1061621, Lot 2 DP1038293, Lot 1 DP 519182, Lot 12 DP1037650, Lot 2 DP 570973, Lot 143 DP 1061621, Lot 4 DP1066170 and Lots 12 and 13 DP 1059554)
- LGAs: Blacktown, Fairfield and Holroyd
- Capital cost of development: $348 million
- F/T construction jobs: 7,000 (approximately)
- F/T post construction jobs: 8,000 (approximately)
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979; list of environmental planning instruments and other relevant legislation
- Details of approval: Director-General's Environmental Assessment Report and project approval
- Additional information: Proposed Development of the Southern Employment Lands: Background Paper (ERM 2006); Director General's requirements for Environmental Assessment. Further information about the project, including the Environmental Assessment (exhibited 23 November to 22 December 2006) can be viewed online on the proponent's website
- MP 05_0120
- Title: Amcor Paper Mill, Matraville
- Approved: 20 July 2007
- Proponent: Amcor Packaging (Australia) Pty Ltd
- Description: Construct and operate a new paper mill at Botany Road, Matraville
- Location: 1891 Botany Road, Matraville
- Local government area: Randwick
- Capital cost of development: $150 million
- F/T construction jobs: 400
- F/T post construction jobs: 140
- Details of approval: Director-General's Assessment Report and project approval
- Additional information: Major Project application and form; Director-General's requirements for Environmental Assessment. The Preliminary Assessment and Environmental Assessment can be viewed online at http://amcor.skmconsulting.com
- MP 06_0303
- Title: Tooheys Brewery Upgrade
- Approved: 18 July 2007
- Proponent: Tooheys Pty Ltd
- Description: Upgrade and continued use of Tooheys Brewery, Lidcombe
- Location: 29 Nyrang Street, Lidcombe
- Local government area: Auburn
- Capital cost of development: $70 million
- F/T construction jobs: 120
- F/T post construction jobs: Nil
- Details of approval: Director-General's Assessment Report and project approval and conditions
- Additional information: Major Project Application and Preliminary Assessment; Director-General's requirements for Environmental Assessment. The Environmental Assessment report can be viewed online at http://www.arup.com.au/tooheys_lidcombe
- MP 05_0089 MOD 1
- Title: Modifications to Southern Sydney Freight Line Project
- Approved: 18 July 2007
- Proponent: Australian Rail Track Corporation Ltd (ARTC)
- Description: Modification to the Minister's Condition of Approval No. 24 to allow the Urban Design and Landscape Plan to be submitted in stages; modification to Minister’s Condition of Approval No. 29 (Cabramatta Station Precinct Parking Plan) to amend the preparation time frame; modification to Minister's Condition of Approval No. 51 to allow the Director-General to request, if necessary, an independent expert to verify the adequacy of noise and vibration control measures identified in the Operation Noise and Vibration Management Plan; and correction of minor errors and misdescriptions
- Location: The line would comprise a single dedicated rail freight track, extending from south of Macarthur to the east of Sefton Park Junction
- LGAs: Liverpool, Campbelltown, Bankstown and Fairfield
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: A/Executive Director, Major Project Assessments, as delegate to the Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Modification of approval
- Additional information: Modification request (8 May 2007)
- Further inquiries: Glenn Snow on (02) 9228 6352
- MP 06_0171 MOD 1
- Title: Modification of concept plan approval for Carlton United Brewery (CUB) Site, Broadway
- Approved: 18 July 2007
- Proponent: Frasers Broadway Pty Ltd
- Description: Clarification of future environmental assessment requirements (identified in Part A of Schedule 2 of the concept approval)
- Location: 26 Broadway, Chippendale
- Local government area: City of Sydney
- Capital cost of development: $800 million
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Details of approval: Director-General's Assessment Report, modification approval and consolidated approval
- Additional information: Modification request (9 July 2007)
- MP 06_0327
- Title: Modifications to Liddell Colliery
- Approved: 18 July 2007
- Proponent: Liddell Coal Operations Pty Limited
- Description: Approval to increase the run-of-mine coal production rate from 4.5 to 8 Mtpa; replace the Liddell coal handling and preparation plant; change the mine's water management system; and, construct ancillary infrastructure. Also for a minor increase in extraction of old coal tailings and an increase in the run-of-mine coal delivered to and received from Cumnock No. 1 Colliery
- Location: Liddell Colliery, 25 kilometres north-west of Singleton
- LGAs: Singleton and Muswellbrook
- Capital cost of development: $91 million
- F/T construction jobs: 150 temporary jobs
- F/T post construction jobs: 90 additional employees (making a total of 240 employees)
- Details of approval: Assessment report and modification approval
- Additional information: Modification application and Director-General's requirements for Environmental Assessment. The Environmental Assessment report exhibited 22 December 2006 to 2 February 2007 is available online at http://www.umwelt.com.au/liddell-coal/. Note this is a modification of development consent (DA 305-11-01) granted November 2002.
- MP 06_0290-1
- Title: M5 East Modification
- Approved: 18 July 2007
- Proponent: NSW Roads and Traffic Authority (RTA)
- Description: A modification to the Minister's approval for the M5 East Motorway, dated 9 December 1997. The Minister's approval of the modification only relates to the proposed construction of a filtration plant at the former Bexley Road M5 East construction compound site, with associated infrastructure. The modification approval does not give approval to the proposed trial of a partial portal emissions procedure for the management of in-tunnel air or the proposed revised community involvement strategy. These elements were removed from the modification following an amendment to the application by the RTA on 25 June 2007
- Location: Between King Georges Road, Beverly Hills and General Holmes Drive, Arncliffe
- Local government area: Rockdale and Canterbury
- Capital cost of development: $50 million
- F/T construction jobs: NA
- F/T post construction jobs: NA
- Details of approval: Modification approval
- Additional information: View project documents
- MP 05_0044
- Title: Pacific Highway Upgrading Program - Bulahdelah
- Approved: 9 July 2007
- Proponent: NSW Roads and Traffic Authority
- Description: A dual carriageway highway to be built to the east of Bulahdelah to replace the existing Pacific Highway, which passes through the town. Includes interchanges to the south and north of the town, allowing easy access to Bulahdelah
- Location: The upgrade starts approximately 4.5 kilometres south of Bulahdelah and joins the already upgraded section of the highway approximately 4 kilometres to the north of the town
- Local government area: Great Lakes
- Capital cost of development: $122.75 million (2005 dollar value)
- F/T construction jobs: NA
- F/T post construction jobs: NA
- Details of approval: Director-General's Assessment Report, project approval and conditions
- Additional information: View project documents
- MP 06_0270
- Title: New Bull Elephant Facility, Taronga Zoo
- Approved: 6 July 2007
- Proponent: Zoological Parks Board of NSW
- Description: Construction of a new bull elephant facility, comprising a new barn, paddock, yard and associated landscaping
- Location: Lot 22 DP 843294, Bradleys Head Road, Mosman
- Local government area: Mosman
- Capital cost of development: $6 million
- F/T construction jobs: NA
- F/T post construction jobs: NA
- Details of approval: Director General's Assessment Report and project approval and conditions
- Additional information: Preliminary Assessment; Director General's requirements for Environmental Assessment; Statement of Environmental Effects ( main report, Appendix 1, Appendix 2 part 1, Appendix 2 part 2, Appendix 3, Appendix 4)
- MP 06_0287
- Title: Appin Underground Coal Mine – Douglas North Substation
- Approved: 6 July 2007
- Proponent: BHP Billiton Illawarra Coal Holdings Pty Limited
- Description: Construction and use of an electricity-supply substation and associated mine infrastructure
- Location: Moreton Park Road, Douglas Park
- Local government area: Wollondilly
- Capital cost of development: $3,600,000
- F/T construction jobs: Up to 20 for a period of 5 months
- F/T post construction jobs: N/A
- Details of approval: Director-General's Assessment Report and project approval and conditions
- Additional information: Application and Preliminary Assessment. Director-General's requirements for Environmental Assessment. The Environmental Assessment (exhibited 13 March to 13 April 2007) is available online at http://illawarracoal.bhpbilliton.com/operations_and_projects/development_applications.asp#dnss . Proponent's response to submissions
- MP 06_0138 MOD 1
- Title: Camden Gas Project
- Approved: 6 July 2007
- Proponent: AGL Gas Production (Camden) Pty Ltd
- Description: Construct one additional directional well at an existing well, change an approved but not yet constructed well to a directional well, connect the wells to the existing gas-gathering system and produce coal seam methane gas
- Location: Elizabeth Macarthur Agricultural Institute, Woodbridge Road, Menangle -Lot 1 DP 130288
- Local government area: Wollondilly
- Capital cost of development: NA
- F/T construction jobs: NA
- F/T post construction jobs: NA
- Details of approval: Director-General's Assessment Report, modification approval and consolidated approval
- Additional information: Modification application (21 March 2007), Environmental Assessment exhibited (Main Report, Appendix 1 Description of works, Appendix 2 Environmental assessment, Appendix 3 Noise assessment, Appendix 4 Flora and fauna assessment, Appendix 5 Revised statement of commitments)
- MP 06_0133
- Title: Blue Dolphin Redevelopment
- Approved: 6 July 2007
- Proponent: Blue Dolphin Development Joint Venture
- Description: A three-stage residential and tourist development. Concept approval - for use, building envelopes and community title subdivision. Project approval - for Stage 1, including construction of 55 residential apartments, basement car parking, ancillary infrastructure, landscaping and strata subdivision
- Location: Lots 1 and 2 in DP 706628, Blue Dolphin Holiday Resort, Yamba Road, Yamba
- Local government area: Clarence Valley
- Capital cost of development: $175 million
- F/T construction jobs: 228
- F/T post construction jobs: 40
- Details of approval: Director-General's Assessment Report and supplement, concept approval and conditions, project approval and conditions
- Additional information: View project documents
- MP 06_0095 MOD 1
- Title: Chemsal – chemical waste storage and treatment facility, St Marys
- Approved: 6 July 2007
- Applicant: Chemsal Pty Ltd
- Description: Construction and operation of a chemical waste storage and treatment facility at 40 Christie Street, St Marys. The modification involves changes to the site layout, gas detection systems and types of dangerous goods stored on site.
- Location: Lot 431 DP 854814, 40 Christie Street, St Marys
- Local government area: Penrith
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Details of approval: Modification approval
- MP05_0099
- Title: Extension of the Gerroa Quarry
- Approved: 4 July 2007
- Proponent: Cleary Bros (Bombo) Pty Ltd
- Description: Extension of the Gerroa Quarry
- Location: Crooked River Road, about 3 kilometres south-west of Gerroa
- LGAs: Shoalhaven and Kiama
- Capital cost of development: $75,000
- F/T construction jobs: Nil
- F/T Operational Jobs: 15
- Details of approval: Director-General's Assessment Report and project approval and conditions
- Additional information: View project documents
- MP 06_0229
- Title: Ore Preparation Area Upgrade, Port Kembla Steelworks
- Approved: 3 July 2007
- Proponent: BlueScope Steel (AIS) Pty Ltd
- Description: Upgrade and increase in the production capacity of the Sinter Plant from 5.5 million tonnes to 6.6 million tonnes per annum
- Location: Five Island Road, Port Kembla
- Local government area: Wollongong
- Capital cost of development: $100 million
- F/T construction jobs: 200
- F/T post construction jobs: Nil
- Details of approval: Director-General's Assessment Report and project approval and conditions
- Additional information: Major projects application, Director-General's requirements for Environmental Assessment, Environmental Assessment exhibited 5 March to 5 April 2007 ( Main report, Appendix A, Appendix B, Appendix C, Appendix D, Appendix E, Appendix F, Appendix G), proponent's response to submissions
- MP 05_0164 MOD2
- Title: University of Sydney - Central Building
- Approved: 28 June 2007
- Proponent: Capital Insight Pty Limited
- Description: The modification involves deleting the requirements for a green wall and soft landscaping within the plaza
- Location: USYD Central Building, Darlington Campus, University Of Sydney
- Local government area: City of Sydney
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: section 75W of the Environmental Planning and Assessment Act 1979
- Details of approval: Modification approval and consolidated conditions of consent (as modified)
- MP 06_0127
- Title: Site 3 development at Sydney Olympic Park
- Approved: 21 June 2007
- Proponent: Site 3 Development Corporation Pty Ltd
- Description: Construction of a mixed use residential apartment building (partly 24 and partly 16 storeys) with 3 basement levels, comprising: 208 apartments, including a mix of studios, 1, 2 and 3 bedroom apartments and 1 live/work unit; 4 commercial/retail units; a child care centre; and 283 car-parking spaces over 3 basement levels, including access and spaces for visitors
- Location: Site 3 at Sydney Olympic Park on the corner of Parkview Drive and Australia Avenue (Lot 79 DP 875562 and Lot 813 DP 1030022)
- Local government area: Auburn
- Capital cost of development: $63.54 million
- F/T construction jobs: 350
- F/T post construction jobs: 18-20
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and project approval and conditions
- Additional information: View project documents
- MP 05_0009
- Title: Ballina Gateway Mixed-Use Development
- Approved: 20 June 2007
- Proponent: Sundowner Developments (NSW) Pty Ltd
- Description: Staged mixed-use development, including an 84 room hotel, 85 residential apartments distributed over four buildings, an amenities building, 1,204sqm of retail including a waterfront café, 2 level basement car park and landscaping
- Location: 256-274 River Street, Ballina - Lot 6-8 DP 23897, Lot A DP 397985, Lot 4A & 4B DP 398716, Lots 6, 11 & 12 Section, 4A DP 758047, Lots 8 & 9 DP 251206, Lot 10 DP 244352, Lot 1 DP 499510, Lot I DP 781715
- Local government area: Ballina
- Capital cost of development: $75 million
- F/T construction jobs: 50
- F/T post construction jobs: 20
- Details of approval: Director-General's Assessment Report and project approval and conditions
- Additional information: View project documents
- MP 05_0018
- Title: Seascape Grove Residential Subdivision, South West Rocks
- Approved: 20 June 2007
- Proponent: WB & ME Walls
- Description: 108 lot residential subdivision of Lot 124 DP 1097510 with associated bushfire protection measures, stormwater measures and access on Lot 22 DP 1071657
- Location: Lot 124 DP 1097510 and Lot 22 DP 1071657, Belle O’Connor Street, South West Rocks
- Local government area: Kempsey
- Capital cost of development: $3.24 million
- F/T construction jobs: 25
- F/T post construction jobs: 5
- Details of approval: Director-General's Assessment Report and Project approval and conditions
- Additional information: Area Dimensions Plan; Overall Plan (revision B); Overall Plan (revision D); Submissions Report; Environmental Assessment report exhibited 14 September to 13 October 2006. Project information is also available on the proponent’s website at: http://www.erm.com/ERM/Loc/erm_australia.nsf/(Page_Name_Web)/Projects_SeascapeGrove
- MP 06_0190
- Title: Western Sydney Recycled Water Initiative - Replacement Flows Project
- Approved: 20 June 2007
- Proponent: Sydney Water Corporation
- Description: The Western Sydney Recycled Water Initiative, outlined in the 2006 Metropolitan Water Plan , is part of the NSW Government's aim to maximise the beneficial use of recycled water. The Minister granted project approval to a new advanced water treatment plant to be constructed at St Marys sewage treatment plant and associated infrastructure, drawing on the available effluent from the Penrith, St Marys and Quakers Hill plants. The recycled water would replace water currently sourced from Warragamba Dam
- LGA's: Penrith, Blacktown, Parramatta and Baulkham Hills
- Capital cost of development: $265 million
- F/T construction jobs: 130
- F/T post construction jobs: 12
- Details of approval: Director-General's Assessment Report and Project approval and conditions
- Additional information: View project documents
- MP 06_0281
- Title: University of NSW - C25 Cancer Research Facility
- Approved: 20 June 2007
- Applicant: University of New South Wales
- Description: Construction of a new cancer research facility on the upper area of the Kensington campus, adjacent to the existing UNSW biomedical research facilities and close to the Prince of Wales and Sydney Children's hospitals; and associated servicing, landscaping and public domain works
- Location: University of New South Wales, High Street, Kensington
- Local government area: Randwick
- Capital cost of development: $100 million
- F/T construction jobs: NA
- F/T post construction jobs: 380 research jobs
- Approval authority: Minister for Planning. In accordance with the instrument of delegation dated 13 October 2006 certain functions in relation to the public consultation and assessment of the application were delegated to Randwick Council
- Details of approval: Director-General's Assessment Report and project approval and conditions. (Note Appendix F - Environmental Assessment of the Director-General’s report can be viewed online at http://www.randwick.nsw.gov.au/default.php?id=975.
- Additional information: View project documents
- MP 05_0121 MOD 1
- Title: Upgrade of Coca-Cola Amatil Facility
- Approved: 19 June 2007
- Applicant: Coca-Cola Amatil (Aust) Pty Ltd
- Description: Construction of a high-bay automated bulk distribution facility and expansion of manufacturing operations at its existing site at Northmead. The existing warehouse area at the site would be demolished. The modification involves minor design and layout changes and amendments to address fire safety measures under the Building code of Australia
- Location: Lots 110 and 111 DP 800504, Lot 21 DP 632950 (Briens Road, Northmead)
- Local government area: Parramatta
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Details of approval: Modification approval
- MP 05_0039
- Title: Residential Flat Development, Lot 100, Precinct C, 42 Walker Street, Rhodes
- Approved: 12 June 2007
- Applicant: Meriton Apartments Pty Ltd
- Description: Construction of a residential flat development varying in height between 5 and 10 storeys and containing 179 apartments, 1 retail space, basement car parking for 203 vehicles and strata subdivision
- Location: Lot 100 DP 1049649, Precinct C, 42 Walker Street, Rhodes
- Local government area: City of Canada Bay
- Capital cost of development: $51,027,929
- F/T construction jobs: 100
- F/T post construction jobs: 10-30
- Approval authority: Minister for Planning
- Details of approval: Director-General's Assessment Report and project approval and conditions
- Additional information: View project documents
- MP 05_0136
- Title: Abel Underground Coal Mine
- Approved: 7 June 2007
- Applicant: Donaldson Coal Pty Ltd
- Description: Establishment of an underground coal mine south of the existing Donaldson open cut mine, involving the construction and operation of new mine surface facilities within the existing Donaldson open cut and the construction and operation of a new underground mine off the existing highwall
- Location: John Renshaw Drive, 23 km northwest of Newcastle
- Local government area: Primarily Cessnock, but also partly within Newcastle and Maitland
- Capital cost of development: $83.5 million
- F/T construction jobs: 70
- F/T post construction jobs: 375
- Details of approval: Director-General's Assessment Report and Project approval and conditions
- Additional information: View project documents
- MP 06_0014
- Title: Anvil Hill Coal Project
- Approved: 7 June 2007
- Applicant: Centennial Hunter Pty Limited
- Description: The project involves construction and operation of a new open cut coal mine and associated infrastructure, including: extraction of approximately 10.5 million tonnes of coal a year for a period of 21 years; a coal-handling and preparation plant capable of processing up to 10.5 million tonnes of coal a year; rail and train loading infrastructure; transportation of product coal to market via rail; and rehabilitation and revegetation of the site
- Location: Wybong, approximately 20km west of Muswellbrook
- Local government area: Muswellbrook
- Capital cost of development: $240 million
- F/T construction jobs: 200
- F/T post construction jobs: 240
- Details of approval: Director-General's Assessment Report and Project approval and conditions
- Additional information: View project documents
- MP 06_0207
- Title: Mixed Use Retail and Commercial Development, Corner of Wharf and Frances Streets, Tweed Heads
- Approved: 4 June 2007
- Proponent: Masada Investments Pty Ltd
- Description: Four-storey retail and commercial development comprising gross floor area of 4,732m2, ground floor office and retail, 3 levels of commercial office space and 2 levels of basement car parking for 86 vehicles and bicycle storage
- Location: 75-77 Wharf Street, Tweed Heads (Lots A and B DP 373378)
- Local government area: Tweed
- Capital cost of development: $5.15 million
- F/T construction jobs: 20
- F/T post construction jobs: 150
- Details of approval: Director-General's Assessment Report and Project approval and conditions
- Additional information: Director-General's requirements for Environmental Assessment issued 6 October 2006; Environmental Assessment (Parts 1, 2, 3, 4, 5, 6, 7, 8, 9, 10) exhibited 22 November to 22 December 2006
- 05_0065_MOD 1
- Title: Invincible Open Cut Coal Mine Extension – Coal Processing
- Approved: 4 June 2007
- Applicant: Coalpac Pty Limited
- Description: The modification involves processing of coal from open cut coal mining operations at the on-site coal preparation plant
- Location: Invincible Colliery, off the Castlereagh Highway, about 24 kilometres northwest of Lithgow
- Local government area: Lithgow
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Details of approval: Assessment report, modification approval and consolidated approval
- MP 05_0078
- Title: Nepean River Pump and Pipeline
- Approved: 4 June 2007
- Applicant: Penrith Lakes Development Corporation
- Description: Construction and operation of a pump and 4.3 kilometre pipeline to extract water from the Nepean River to facilitate the initial filling and long term water supply of Penrith Lakes. The intake structure will be installed on the bed of the Nepean River, 110 metres upstream of Penrith Weir, and will connect to a submerged pump station on the eastern riverbank. An associated control building will be sited on the high riverbank area within Weir Reserve. The pumping system will operate according to the following rules: pumps can start when flow over Penrith weir reaches 500 megalitres per day; and pumps will automatically stop when flow over Penrith weir drops to 350 megalitres per day
- Location: within and outside the Penrith Lakes Scheme area
- Local government area: Penrith
- Capital cost of development: $10 million
- F/T construction jobs: 80-100
- F/T post construction jobs: 2
- Details of approval: Director General's Assessment Report and Project Approval
- Additional information: View project documents
- MP 05_0170
- Title: Conroy's Gap Wind Farm
- Approved: 31 May 2007
- Applicant: Epuron Pty Ltd
- Description: Construction and operation of up to 15 wind turbines with a total generating capacity of up to 30 megawatts and associated infrastructure, including a substation and control room, electrical connections between the turbines and substation, connection to the existing 132kV transmission line which crosses the site and construction of internal access roads and minor upgrades to local roads
- Location: approximately 17 km west of Yass off Black Range Road, on the NSW Southern Tablelands
- Local government area: Yass Valley
- Capital cost of development: $50 million
- F/T construction jobs: 50
- F/T post construction jobs: 5
- Details of approval: Director-General's assessment report and Project approval and conditions
- Additional information: Project application and form lodged 27 February 2006. Minister's Opinion issued on 7 December 2005. Director-General's requirements for Environmental Assessment. Environmental Assessment exhibited 9 August to 22 September 2006 (available on proponent’s website). Submissions Report
- MP 06_0259
- Title: Bayswater Water Pumping Station Upgrade
- Approved: 23 May 2007
- Proponent: Macquarie Generation
- Description: Macquarie Generation seeks to upgrade the existing Bayswater power station, installing a new low-pressure water pumping station, transfer pipeline and associated infrastructure to access 1,200 megalitres of water per day during high flow periods. The existing water extraction system accesses 400 megalitres of water per day, which is used to service both the Bayswater and Liddell power stations. The current Macquarie Generation water licence permits the extraction of up to 1,200 megalitres of water per day
- Location: Lot 91 DP 234544, Lot 1 DP 616024, Lot 110 DP 625973; Hunter River and adjacent land to Plashett Dam
- Local government area: Singleton
- Capital cost of development: $50 million
- F/T construction jobs: 30
- F/T post construction jobs: Nil
- Details of approval: Project approval and Director-General's Assessment Report
- Additional information: Major Project Application and Preliminary Assessment (received 15 September 2006); Director-General's Requirements for Environmental Assessment (issued 22 October 2006). The Environmental Assessment (exhibited 16 February to 20 March 2007) can be viewed on the proponent’s website
- MP 06_0056
- Title: Bray Park Water Treatment Plant Augmentation
- Approved: 23 May 2007
- Proponent: Tweed Shire Council
- Description: Augmentation of existing water treatment plant, increasing output from 50Ml/day to 100Ml/day with potential to increase to 150Ml/day; construction of a water treatment, chemical store and poly-aluminium chloride building; installation of equipment for the purposes of operating a membrane ultrafiltration plant; and, improvements to existing infrastructure including upgrade of internal roadways, parking and services
- Location: Lot 1, DP 44572, Lot 92 DP 621515 and Lot 103, DP 616049, Durroon Avenue, Bray Park
- Local government area: Tweed
- Capital cost of development: $60 million
- F/T construction jobs: 50
- F/T post construction jobs: Existing staff
- Details of approval: Director-General's Assessment Report and Instrument of Approval
- Additional information: View project documents
- 05_0193 - MOD 1
- Title: Modification to Hexham Swamp Rehabilitation Project
- Approved: 23 May 2007
- Proponent: Minister for the Environment and Climate Change
- Description: Proposed modification to Hexham Swamp Rehabilitation Project to allow a small section of the bund to be constructed using concrete rather than Virgin Excavated Natural material (VENM)
- Location: Hexham
- Local government area: Newcastle
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Details of approval: Modification approval and Director General's planning report
- Additional information: Modification request (parts 1 2 3)
- MP 06_0210
- Title: Dry boat storage and marine facility, Rozelle Bay
- Approved: 21 May 2007
- Applicant: Rozelle Bay Pty Ltd
- Description: Proposal for: a dry boat storage facility accommodating up to 670 boats within two buildings; a two-level commercial maritime building; a multi-storey car park building and at grade parking areas for 272 vehicles; four 25,000 litre underground fuel storage tanks; a marina comprising 36 layover berths, and 24 layover brokerage berths; and a boat in/out feed system used for moving boats between the dry boat stores and the water
- Location: Lots 29 and 30, James Craig Road, Rozelle and Part of Lot 33 being the water of Rozelle Bay
- Local government area: Sydney City
- Capital cost of development: $63.6 million
- F/T construction jobs: 182
- F/T post construction jobs: 52
- Details of approval: Project documents, including the Assessment Report prepared by Sydney Harbour Foreshore Authority and the Minister’s Instrument of Approval are available on the Authority’s website at http://www.shfa.nsw.gov.au/sydney-For_Business-Development_Applications-Dry_Boat_Store_Application.htm
- MP 05_0037 MOD 1
- Title: Waste Oil Recovery and Recycling Facility
- Approved: 16 May 2007
- Applicant: Transpacific Industries Group Pty Ltd
- Description: Waste oil recovery and recycling facility to produce 36,000 tonnes of refinery grade base lubricant oil a year from 40,000 tonnes of waste oils. The project includes a lube oil hydrogenation plant, industrial cleaning services depot, environmental recovery services depot, truck wash, fuel depot and an onsite laboratory. The modification includes construction of additional plant, including a flash point correction column, fired heater, cooling tower and six additional storage tanks
- Location: 11 Kyle Street, Rutherford within the Rutherford Industrial Precinct approximately 7km northwest of Maitland (Lot 223 DP 1037300)
- Local government area: Maitland
- Capital cost of development: $10 million
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Details of approval: Modification approval
- MP 06_0172
- Title: Macquarie University Private Hospital
- Approved: 13 May 2007
- Applicant: Macquarie University/Dalcross Private Hospital
- Description: Major project approval is granted for:
- demolition of all buildings, structures and landscaping at No. 3 Technology Place
- staged construction of an 18,709sqm, 208-bed, 6 storey private hospital at No. 3 Technology Place including basement car parking for 218 vehicles, associated site landscaping and infrastructure works and a pedestrian bridge across Technology Place (connecting to No. 2 Technology Place)
- amendments to the basement, internal layout and facade of the building approved on No. 2 Technology Place
- use of the proposed building at No. 2 Technology as specialist consulting rooms and the like in conjunction with the private hospital constructed at No. 3 Technology Place
- Location: Nos 2 and 3 Technology Place, Lot 18 DP 1058168 andd Lot 20 DP 1015626
- Local government area: Ryde
- Capital cost of development: $86 million
- F/T construction jobs: 100
- F/T post construction jobs: 400
- Approval authority: Minister for Planning
- Details of approval: Project approval, Director-General's Assessment Report
- Additional information: View project documents
- Further inquiries: Anthony Witherdin 02 9228 6173
- MP 06_0148
- Title: Sapphire tourist/residential development
- Approved: 9 May 2007
- Proponent: Sapphire Beach Development Pty Ltd
- Description: Tourist and/or residential development consisting of apartments, townhouses and villa style housing.
- Location: 740-742 Pacific Highway, Sapphire Beach, Lots 100 and 101 DP 629555, and Lot 2 DP 800836
- Local government area: Coffs Harbour
- Capital cost of development: $90 million
- F/T construction jobs: 225
- F/T post construction jobs: Between 3 and 20
- Details of approval: Instrument and conditions of approval, Director-General’s Assessment Report, Concept Plan
- Additional information: View project documents
- MP 05_0056 MOD 1
- Title: Modification - Sofitel Hotel, Sydney Olympic Park
- Approved: 1 May 2007
- Applicant: TAHL Homebush Pty Ltd
- Description: Application to Modify the Minister's Approval for the construction of a new 18 storey five star hotel at Site 4A, Sydney Olympic Park. Modifications involve a number of minor internal and external alterations to the approved building including the materials and finishes.
- Location: Site 4A, Olympic Boulevard within the Town Centre Precinct of Sydney Olympic Park
- Local government area: Auburn
- Capital cost of development: NA
- F/T construction jobs: NA
- F/T post construction jobs: NA
- Details of approval: Modification approval; Director-General’s Assessment Report
- Additional information:
Modification Application - Appendix 1, Appendix 2, Appendix 3 - MP 06_0159
- Title: Proposed expansion of Visy Tumut Mill
- Approved: 1 May 2007
- Applicant: Visy Pulp and Paper Pty Ltd
- Description: Proposal to expand the existing Visy Tumut paper manufacturing facilities from a manufacturing capacity of 300,000 tonnes per year to a manufacturing capacity of 700,000 tonnes per year.
- Location: 436 Gadara Road, Tumut
- Local government area: Tumut
- Capital cost of development: $455 million
- F/T construction jobs: up to 500 at peak
- F/T post construction jobs: 50 at mill, up to 350 in supply and service industries associated with the mill.
- Details of approval: Director-General's Assessment Report, Submissions Report, Concept Approval, Project Approval
- Additional information: View project documents
- MP 07_0022-MOD 1
- Title: Modification to North-West T-way Network Project
- Approved: 29 April 2007
- Applicant: Roads and Traffic Authority and Ministry of Transport
- Description: Proposed modification to North-West T-way rapid bus network from Parramatta to Rouse Hill and Blacktown to Parklea Links, involving changes to the bus priority system technology
- Location: North-West Sydney
- Local government area: Blacktown, Baulkham Hills, Parramatta and Holroyd
- Details of approval: Modification approval and Planning Report
- Additional information: Environmental Assessment: Main report, Appendix B, Appendix B, Appendix C
- MP 07_0050 MOD 1
- Title: Modification to Albury Wodonga National Highway (Hume Highway) Upgrade
- Approved: 20 April 2007
- Proponent: Roads and Traffic Authority
- Description: Proposed section 75W modification to Condition 40 (Urban Design and Landscaping Plans) of the Minister's approval which was granted on 23 January 1998
- Location: Table Top to Mullengandra
- Local government area: Albury City
- Capital cost of development: NA
- F/T construction jobs: NA
- F/T post construction jobs: NA
- Details of approval: Signed Instrument of Approval and Modification Report
- Additional information: Modification Request (received 3 April 2007)
- MP 06_0178
- Title: Formule 1 Hotel, Sydney Olympic Park
- Approved: 19 April 2007
- Applicant: TAHL Homebush Pty Ltd
- Description: A seven-storey, 156 room budget style hotel, comprised of:
- a hotel reception lobby, breakfast area, hotel administration, retail outlets and parking for 6 cars at ground level
- guest car parking for 51 cars at levels one and two
- 156 guest rooms (76 family rooms, 72 standard rooms and 8 accessible rooms) at levels three to six.
- Location: Part Lot 6002, DP 1063407 on the corner of Edwin Flak Avenue and Uhrig Road, Sydney Olympic Park
- Local government area: Auburn
- Capital cost of development: $14 million
- F/T construction jobs: 80
- F/T post construction jobs: 6
- Details: Conditions for Approval and Director General's Report
- Additional information: View project documents
- MP 06_0129
- Title: Auburn Hospital (Concept Plan)
- Approved: 13 April 2007
- Proponent: NSW Health
- Description: Proposal includes:
- redevelopment of the existing Auburn Hospital to provide a new 204-bed predominantly five-storey hospital
- onsite hospital car parking for over 270 cars
- new site access arrangements
- site infrastructure and landscaping
- relocation of the 82-bed St Josephs Hospital to the Auburn Hospital site
- 17,000m2 of residential floor space accommodated in two residential towers on the main hospital site and one four-storey
- residential development on the Arthur stone site
- multi-level car parking
- Location: Auburn Hospital - Norval Street, and Hevington and Hargrave roads, Auburn (specifically Lots 1-16 in DP 873, Lot A in DP 102993, Lot B in DP 102993, Lot C in DP 420405 and Lot X 102994)
- Local government area: Auburn
- Capital cost of development: $170 million
- F/T construction jobs: 215
- F/T post construction jobs: 100
- Details of approval: Instrument of Approval, Director General's Assessment Report, Summary of public submissions
- Additional information: Documentation for both the Concept Application and Project Application for this project can be viewed online at http://www.swahs.health.nsw.gov.au/capitalprojects/CapitalProjectsAuburn.htm
- MP 06_0231
- Title: St Vincent’s Hospital (O’Brien Building) and Caritas site redevelopment (MP 06_0231)
- Approved: 13 April 2007
- Applicant: St Vincent’s and Mater Health
- Description: Concept plan approval granted to demolish:
- existing O’Brien Building and construct a new 8 storey building, 228 car parking spaces and ancillary facilities
- Caritas Rehabilitation Centre. Also excavation for new basement car parking, creation of new mixed use development on the Caritas site, retention and change of use of the heritage items (Caritas House and Caritas Cottage) from institutional to residential/commercial use
- Location: O’Brien Building, Burton Street, Darlinghurst and Caritas site, 299 Forbes Street, Darlinghurst
- Local government area: City of Sydney
- Capital cost of development: $41 million
- F/T construction jobs: 125
- F/T post construction jobs: 200
- Details of approval: Signed instrument of approval
Director-General’s Assessment Report
- 1. Executive summary
- 2. Background - part 1, part 2
- 3. Proposed development - part 1, part 2
- 4. Statutory context
- 5. Consultation and issues raised
- 6. Assessment - part 1, part 2, part 3, part 4
- 7. Conclusion
- Additional information: NA
- MP 06_0051
- Title: Royal North Shore Hospital Concept Plan
- Approved: 13 April 2007
- Proponent: NSW Health and Northern Sydney and Central Coast Area Health Service
- Description: Redevelopment of Royal North Shore Hospital consistant with Part C of the approval
- Location: Royal North Shore Hospital - corner of Westbourne Street and Reserve Road, St Leonards
- Local government area: Willoughby
- Capital cost of development: $890 million
- F/T construction jobs: NA
- F/T post construction jobs: 3250
- Details of approval:
Signed instrument of approval
Director-General's Assessment Report: pp 1-16; pp 17-22; pp 23-28; pp 29-51
Appendix A - Approval and conditions
Appendix B - Statement of commitments
Appendixes C to F (Preferred Project Report, responses to submissions, submissions from public authorities and Environmental Assessment) are available on the consultant's site at www.elton.com.au/talkRNSH - Additional information: Preferred Project Report (November 2006), Concept Plan (July 2006), including the Environmental Assessment, responses to submissions, and Director-General's requirements for Environmental Assessment can be viewed online at www.elton.com.au/talkRNSH
- MP 05_0079 MOD 1 and MP 06_0310
- Title: Emirates Luxury Tourist Resort
- Approved: 13 April 2007
- Applicant: Emirates Hotels (Australia) Pty Ltd
- Description: Construction and operation of a luxury tourist resort and associated infrastructure.
- Location: Wolgan Road, Wolgan Valley
- Local government area: Lithgow
- Capital cost of development: $60 million
- F/T construction jobs: 150
- F/T post construction jobs: 100
- Details of approval: Modified Concept Plan Approval, Project Approval Part 1, Project Approval Part 2, Director-General's Report, Statement of Commitments
- Additional information: View project documents
- 06_0189
- Title: Expansion of the Kooragang Coal Terminal
- Approved: 13 April 2007
- Applicant: Port Waratah Coal Services Limited
- Description: Port Waratah Coal Services proposes to increase the capacity throughput of its Kooragang Coal Terminal to 120 million tonnes per annum (current approved capacity 77 million tonnes per annum - DA No 35/96). The proposed increase in capacity does not require any change to the size of the approved footprint or operational area but will be achieved through operational efficiencies and upgrades to plant and equipment. The operational improvements include increase in the throughput capacity of: the three receival and four stacking streams; the coal reclaim system and the shiploading system. Upgrades to plant and equipment include:
- Installing new low noise drives of higher power and increased speed;
- Increasing the coal profile on the belt; and
- Changing to higher capacity chutes and introducing soft flow design for more efficient movement of coal.
- Location: Curlew Street, Kooragang Island at the north of Newcastle Harbour and including land in Lots 5,7 & 9 DP775774; Lot 1 DP775775; Lot 1 DP869662; Lot 11 DP841542; Lots 2,6,7,8 & 9 DP775772; Lots 11,13,14,17,18,19,20, 22 & 23 DP775773; Lots 10, 29, 31, 34 & 41 DP775776; Lots 48, 49, 51, 53 & 55 DP 775777; Lot 1 DP 1015754; Lots 101, 102, 103, 104, 105, 106, 107, 109 & 111 DP1018591; Lot 131 DP 1018592; Lots 201, 202, 203, 204, 205, 206, 208 & 210 DP 1017038; Lot 211 DP 1018949 and Lot 521 DP1018950
- Local government area: Newcastle local government area
- Capital cost of development: $78 million
- F/T construction jobs: 0
- F/T post construction jobs: 0
- Details: DG's assessment report, Project approval, Response to submissions Part A, Response to submissions Part B
- Documents available: Major Project Application, Preliminary Environmental Assessment, Director-General's Requirements, Environmental Assessment
- Further inquiries: Scott Jeffries (02) 9228 6426
- 06_0009
- Title: Newcastle Coal Infrastructure Group Coal Export Terminal, Kooragang Island
- Approved: 13 April 2007
- Applicant: Newcastle Coal Infrastructure Group
- Description: Construction and operation of a 66 million tonnes per annum (Mtpa) capacity coal export terminal on Kooragang Island in Newcastle, New South Wales. The main activities comprising the development will be carried out on and adjacent to Kooragang Island and include foundation preparation/capping of a rail corridor traversing the existing Kooragang Island Waste Emplacement Facility for the development of the rail spurs, rail sidings and rail loops; construction of rail spurs, rail sidings and rail loops, rail overpass, train unloading stations and connecting conveyors; reuse of dredged materials from the south arm of the Hunter River as preload and engineering fill for construction of the coal storage area, rail corridor and wharf; construction of a coal storage area including coal stockpiles, conveyors, transfer points and combined stacker/reclaimers; construction of wharf facilities, shiploaders, conveyors and buffer bins; development of water management infrastructure including site drainage works, stormwater settlement ponds, primary and secondary settling ponds, site water pond, water tanks and stockpile spray system; installation of electricity reticulation and control systems; development of access roads and internal roads; construction of administration and workshop buildings; associated minor infrastructure, plant, equipment and activities; and operation of the coal export terminal up to a capacity of 66 Mtpa, including the unloading of coal trains, the stockpiling of coal, and the loading of coal to ships via the wharf facilities and shiploaders..
- Location: Cormorant Road, Kooragang Island at the north of Newcastle Harbour and including land in Lot 122 DP 874949, Lot 7 DP 1015754, Lot 6 DP 1015754, Lot 20 DP 262325 and Lot 2 DP 581473
- Local government area: Newcastle local government area
- Capital cost of development: $922 million
- F/T construction jobs: 500
- F/T post construction jobs: 100
- Details: DG's assessment report, Project approval, Panel report
- Documents available: Project Application and Preliminary Assessment, EA requirements, Envrionmental assessment, Panel's terms of reference, Responses to submissions
- MP05_0052
- Title: Tipfast Construction Material Recycling Facility
- Approved: 12 April 2007
- Applicant: Tipfast Pty Ltd
- Description: A construction materials recycling facility, which is to be relocated from St Peters (Marrickville LGA) to 16/19A Baker Street, Banksmeadow (Botany Bay LGA). The facility would receive up to 100,000 tonnes per year of construction and demolition materials including asphalt, masonry and soil. These materials would be recycled into road base or hard fill, with a small amount (5-10%) of residual waste disposed to a licensed landfill. The proposal includes storage, sorting and processing facilities, as well as an administration building and parking facilities.
- Location: Lot 5, DP1048677
- Local government area: Botany Bay
- Capital cost of development: $1.7 million
- F/T construction jobs: 25
- F/T post construction jobs: 10
- Details: Project Approval, Director-General's Report
- Documents available: View project documents
- MP 05_0103
- Title: Ivanhoe North Rehabilitation Project
- Approved: 11 April 2007
- Applicant: Ivanhoe Coal Pty Limited
- Description: Rehabilitation of the former Cullen Main West open cut coal mine, and recovery, crushing and transport of 550,000 tonnes of coal
- Location: 22 kilometres northwest of Lithgow
- Local government area: Lithgow
- Capital cost of development: $2.25 million
- F/T construction jobs: 6 (for 2 months)
- F/T post construction jobs: 12
- Details: Director-General's Assessment Report , Response to Submissions Report, Revised Statement of Commitments, Project Approval
- Additional information: View project record
- 06_0317
- Title: Proposed installation of Stormwater Treatment Unit, P&O Shipping Terminal. Port Botany
- Approved: 7 April 2007
- Applicant: P&O Ports Limited
- Description: P&O proposes to install an in-ground stormwater treatment unit for the removal of contaminants captured in surface water run-off
- Location: 42 Friendship Road, Matraville (Lots 1-13, DP 260692)
- Local government area: Randwick local government area
- Capital cost of development: $150,000
- F/T construction jobs: 1
- F/T post construction jobs: 0
- Further inquiries: Ingrid Ilias (02) 9228 6411 or ingrid.ilias@planning.nsw.gov.au
- Details: Project Approval and Environmental Assessment Report
- Documents available:
- MP 06_0186
- Title: Six-storey mixed-use residential, motel and retail development
- Approved: 1 March 2007
- Applicant: KAS Developments Pty Ltd
- Description: Demolition of all existing buildings and structures on site; and construction of a six-storey building including: 22 motel suites/studios, 28 residential apartments, 3 retail tenancies at ground level, 2 levels of basement car parking for 78 cars, recreational amenities (gym, lap pool, spa etc), landscaping; and servicing.
- Location: Lots 1 and 2 Section E DP 17053, 85-87 Ocean Parade, Coffs Harbour
- Local government area: Coffs Harbour
- Capital cost of development: $9.5 million
- F/T construction jobs: 50
- F/T post construction jobs: 5
- Details: Project Approval, Director-General’s Report
- MP 06_0333
- Title: Proposed commercial office building for Sydney Water at Civic Place Precinct, Parramatta
- Approved: 1 March 2007
- Applicant: Multiplex Constructions Pty Ltd on behalf of Sydney Water Corporation
- Description: Construction of a 17 storey commercial office building for Sydney Water with ancillary retail /café and associated basement carparking and public domain works.
- Location: 1 Smith Street, Parramatta comprises the following lots:
- Lot 1 DP 209425.
- Lot 1 DP 128540.
- Lots 1 & 2 DP 511141.
- Lot 3 DP 207682.
- Lot A DP 324342.
- Lot A DP 323787.
- Lot 2 DP 207682.
- Local government area: City of Parramatta
- Capital cost of development: $129,000,000
- F/T construction jobs: 500
- F/T post construction jobs: 1500
- Details: View project documents
- 06_0253
- Title: 06_0253 Proposed Woolworths distribution and storage facility, Erskine Park, Penrith Local Government Area
- Approved: 1 March 2007
- Applicant: Macquarie Goodman Management Limited
- Description: Construction and operation of a Woolworths distribution and storage facility.
- Location: Lot 141 DP 843899 Mamre Road, Erskine Park
- Local government area: Penrith
- Capital cost of development: $41.2 million
- F/T construction jobs: N/A
- F/T post construction jobs: 190
- Details: Instrument of Approval; Director-General's Assessment Report
- Documents available: Project Application Form, Director-General's Environmental Assessment Requirements, Preliminary Environmental Assessment, Environmental Assessment
- 06_0254
- Title: Proposed Kimberly-Clark distribution and storage facility, Erskine Park, Penrith Local Government Area
- Approved: 1 March 2007
- Applicant: Macquarie Goodman Management Limited
- Description: Construction and operation of a Kimberly-Clark distribution and storage facility.
- Location: Lot 141 DP 843899 Mamre Road, Erskine Park
- Local government area: Penrith
- Capital cost of development: $43.2 million
- F/T construction jobs: N/A
- F/T post construction jobs: 140
- Details: Instrument of Approval; Director-General's Assessment Report
- Documents available: Director-General's Environmental Assessment Requirements, Preliminary Environmental Assessment, Project Application Form, Environmental Assessment
- 06_0208 and 06_0216
- Title: Warehouse and Distribution Centre, Lenore Lane, Erskine Park
- Approved: 1 March 2007
- Applicant:
- Description: Construction and operation of a warehouse and distribution centre complex, including concept plan for the creation of up to six warehouse/industrial buildings along with associated subdivision and infrastructure works including the relocation of a creek; and Stage 1 works including bulk earthworks, subdivision of the site and construction of a new storage and distribution facility
- Location: Lenore Lane, Erskine Park
- Local government area: Penrith
- Capital cost of development: $200,000,000
- F/T construction jobs: NA
- F/T Operational Jobs: 3000
- Details: View project documents
- 05_0072
- Title: Parkes Intermodal Terminal
- Approved: 1 March 2007
- Applicant:
- Description: A Concept Plan for an intermodal terminal on a 365 hectare site approximately 5 kilometres west of Parkes, providing a facility for the large scale transport and warehousing/storage of freight and the transfer of freight containers between trucks and trains. The proposed terminal would be located at the confluence of the Main Western and Parkes - Narromine railway lines, and developed in two stages, with the initial stage (Years 1-5) being capable of handling up to 240,000 Twenty Foot Equivalent Units (TEUs) of freight, and the ultimate stage up to 530,000 TEUs.
- Location: Brolgan Road, Parkes
- Local government area: Parkes
- Capital cost of development: $135 Million
- F/T construction jobs: 600
- F/T post construction jobs: 600
- Details: View project documents
- 06_0074
- Title: Proposed Marulan South Quarry, Marulan South Road, Marulan South, Goulburn Mulwaree Local Government Area
- Approved: 28 February 2007
- Applicant: Boral Resources (NSW) Pty Ltd
- Description: Development of a hard rock quarry and associated infrastructure
- Location: Marulan South Road, Marulan South - about 10km south-east of Marulan
- Local government area: Goulburn Mulwaree
- Capital cost of development: $150 million
- F/T construction jobs: 20
- F/T post construction jobs: 30
- Details: Instrument of Approval; Director-General's Assessment Report
- Documents available: Major Project Application and Preliminary Assessment, Director-General's Requirements , Environmental Assessment
- 06_0026
- Title: Northparkes Mine - E48 Project PA Number 06_0026
- Approved: 28th February 2007
- Applicant: North Mining Limited
- Description: North Mining Limited proposes to extend its underground gold/copper mine at the Northparkes mining complex. The project includes the:
- establishment of a new underground mine to extract up to 34 million tonnes of ore over 10 years;
- continued use of existing infrastructure at the mine; and
- construction and use of additional infrastructure, including an above-ground conveyor and two tailings dams.
- Location: 20 km north west of Parkes, central west NSW
- Local Government Area: Parkes Shire Council
- Capital cost of development:
- F/T construction jobs:
- F/T post construction jobs:
- Details: NP DG's Environmental Assessment Report, Signed instrument of approval
- Documents available: Major Projects Application; Background Document; Director-General's requirements; Executive Summary; EA; Submissions Report
- 06_0089
- Title: 06_0089 Vopak Site B3 Bulk Liquids Storage Expansion, Randwick LGA
- Approved: 28 February 2007
- Applicant: Vopak Terminals Sydney Pty Limited
- Description: An expansion of the Vopak Bulk Liquids Storage Facility to increase storage capacity by approximately 158,000 cubic metres.
- Location: Lot 21 DP 1045323 known as 1-9 Friendship Road, Port Botany
- Local government area: Randwick
- Capital cost of development: $80 million
- F/T construction jobs: 100
- F/T post construction jobs: 5
- Details: Instrument of Approval; Director-General's Assessment Report
- Documents available: Preliminary Assessment; Director-General's Requirements, Project Application, View more documents available
- MP 06_0150
- Title: 9 storey multi unit housing development
- Approved: 28 February 2007
- Applicant: Coffs Beach Partnership
- Description: 9-storey multi unit housing development comprising 3 x 1 bedroom dwellings, 16 x 2 bedroom dwellings and 17 x 3 bedroom dwellings, and basement and on ground car parking for 54 cars.
- Location: Lot 19 DP 611010 & Lot 1 DP 41616
111 Ocean Parade, Coffs Harbour. - Local government area: Coffs Harbour
- Capital cost of development: $15,300,000
- F/T construction jobs: 60
- F/T post construction jobs: N/A
- Documents available: View project documents
- MP 06_0184
- Title: Pasminco Cockle Creek Smelter Remediation Project
- Approved: 27 February 2007
- Applicant: Pasminco Cockle Creek Smelter Pty Ltd (subject to Deed of Company Arrangement)
- Description: The project involves the remediation of the former Pasminco lead and zinc smelter site at Boolaroo, located approximately 13 km south west of Newcastle. The remediation will principally involve the excavation of contaminated material from the various parcels of the site and the placing of these materials in a capped containment cell to be located around the existing on-site eastern slag stockpile. Where necessary, the excavation will be preceded by the removal of some concrete slabs on the Main Site and by the removal of underground services. After the excavation of any particular area is complete, and the site validated and signed off by the Site Auditor as being fit for its purpose, the remediated area will be re-filled and or regraded to achieve expected future development levels with imported fill as necessary. Other project components include temporary storage, treatment and possibly mixing of excavated material as required, the provision of environmental controls to manage impacts during construction, an effluent treatment plant to treat potential future leachate and groundwater that may be emitted from the cell, the continued approval of the operation of the existing jig on the site to extract lead from lead slag stockpiles, the crushing of recovered concrete, some off-site disposal of contaminated material and the possible acceptance of some materials from nominated properties which had been contaminated by lead dust.
- Location: 13a Main Road, Boolaroo, NSW 2284. Lot 201 DP 805914, Lot 21 DP 253122, Lot 1 DP 523781 and Lot 23 DP 251322
- Local government area: Lake Macquarie Local Government Area
- Capital cost of development: $45 m
- F/T construction jobs: 20
- F/T post construction jobs: 2
- Details: View project documents
- Further Enquiries: Ricardo Prieto-Curiel (02) 9228 6112 or ricardo.prieto-curiel@planning.nsw.gov.au
- 06_0052
- Title: Materials Recycling Facility
- Approved: 27 February 2007
- Applicant:
- Description: Construction and operation of a materials recycling facility and associated infrastructure for the processing of ferrous and non-ferrous metals.
- Location: 191 Miller Road, Chester Hill
- Local government area: Bankstown
- Capital cost of development: $2,000,000
- F/T construction jobs: NA
- F/T post construction jobs: 40
- Details: View project documents
- MP 06_0163
- Title: Luna Park Site C - Restaurant
- Approved: 27 February 2007
- Applicant: Luna Park Sydney Pty Ltd
- Description: Project Application for a restaurant and subdivision of land into 3 lots
- Location: Luna Park Lot 1 DP 1066900, including 'Site C'
- Local government area: North Sydney
- Capital cost of development: $5,547,304.00
- F/T construction jobs: 20
- F/T post construction jobs: 25
- Documents available: View project documents
- 06_0029
- Title: Bamarang Gas Fired power Station
- Approved: 27 February 2007
- Applicant:
- Description: Concept approval and project approval for Delta Electricity to construct and operate Stage 1 of a 300 megawatt gas fired power station and associated infrastructure on Yalwal Road, Bamarang and concept approval for Stage 2 of the project which involves the conversion of the power station to a closed cycle configuration to address base load and intermediate load requirements and conversion to a 400 megawatt facility.
- Location: Lot 1 DP 127482
- Local government area: Shoalhaven City Council
- Capital cost of development: $156 million for Stage 1
$400 million for Stage 2 - F/T construction jobs: 100-150 in Stage 1 and 200-300 in Stage 2
- F/T Operation Jobs: 8 jobs in Stage 1 and 18 jobs in Stage 2
- Details: DG's Report, Concept approval, Project approval
- Documents available: Submissions Report, Submissions Report Appendix B, Submissions Report Appendix C, Submissions Report Appendix D, Major Project Application, Preliminary Assessment, Director General's Requirements (RTF)
- 06_0268 MOD 2
- Title: Lane Cove Tunnel Modification - Epping Road Surface Changes
- Approved: 21 February 2007
- Applicant: NSW Roads and Traffic Authority
- Description: Proposed modification to the Lane Cove Tunnel Approval to:
- defer surface changes on Epping Road for 5 months after opening of the Tunnel, except for pedestrian bridge and bus interchange;
- ensure bus lanes on Epping Road are operational by 10 months after opening;
- complete all approved surface changes on Epping Road by 11 months after opening of the Tunnel;
- permit the Tunnel, Falcon Street ramps and Gore Hill Freeway widening to be opened to traffic within a one-month period rather than concurrently; and
- investigate the location and design of a bus bay in Military Road east of Merlin Street north to the satisfaction of the Public Transport Committee.
- Location: Along the alignment of Epping Road and the Gore Hill Freeway, between the Lane Cove River and Naremburn, Sydney.
- Local government area: Lane Cove, North Sydney, Willoughby, Ryde
- Documents available:
- Director-General's Report
- Appendix A (Application letter, Environmental Assessment, Transition options diagrams, Traffic Assessment of options, Traffic Assessment of proposal, Proposed modifications to Conditions of Approval)
- Appendix B - Submissions
- Appendix C - Further information
- Instrument of Modification
- Consolidated Approval
- 05_0178
- Title: City West Cable Tunnel
- Approved: 21st February 2007
- Applicant: EnergyAustralia
- Description: Construction and operation of a 1.8km electricity transmission cable tunnel comprising of five transmission feeders to link the Haymarket bulk supply point in Thomas Street, Ultimo to the new City North substation at the corner of Sussex and Erskine Streets, Sydney.
- Location: From Haymarket Substation at Thomas St, Ultimo through Darling Harbour to the corner of Sussex and Erskine Streets, Sydney
- Local government area: City of Sydney
- Capital cost of development: $60 Million
- F/T construction jobs: 20
- F/T post construction jobs: 0 ( Existing Staff)
- Details: Director General's Report and Instrument of Approval
- Documents available: Project Application and Application Form, Director General's requirements (RTF), Environmental Assessment (RTF), Newspaper Advertisement (RTF), Proponent's response to submissions
- 06_0141
- Title: Turf Farm, Tumbulgum
- Approved: 21 February 2007
- Applicant:
- Description: Construction and operation of a turf farm and associated infrastructure including a water storage dam.
- Location: Lot 1 DP 783886, Tweed Valley Way, Tumbulgum
- Local government area: Tweed
- Capital cost of development: $100,000
- F/T construction jobs: NA
- F/T post construction jobs: 2
- Details: View project documents
- 06_0022
- Title: Used Oil Transfer Station, St Marys
- Approved: 21 February 2007
- Applicant: Klekies Pty Ltd
- Description: Construction and operation of a used oil transfer station and associated infrastructure.
- Location: Lot 132, DP31912, 85 Christie Street, St Marys
- Local government area: Penrith
- Capital cost of development: $500,000
- F/T construction jobs:
- F/T post construction jobs: 6
- Details: Project Approval, Director-General's Report
- Documents available:
- 05_0167
- Title: Cullerin Range Wind Farm
- Approved: 21 February 2007
- Applicant: Epuron Pty Ltd (formerly Taurus Energy Pty Ltd)
- Description: Construction and operation of up to 15 wind turbines on tubular steel towers up to 80 m high at the hub, including associated infrastructure (substation and transmission connection to the existing Country Energy 132kV system on the site, control room and equipment storage facilities, etc).
- Location: Cullerin Range, Southern Tablelands of NSW
- Local government area: Upper Lachlan Shire Council
- Capital cost of development: $50 Million
- F/T construction jobs: 50
- F/T post construction jobs: 5
- Details: Director General's Report and Instrument of Approval
- Documents available: Project Application, Application form, Director-General's Requirements (RTF), Environmental Assessment, Submissions Report
- 05_0195 Mod 1
- Title: Modification to the Instrument of Approval for the Munmorah Gas Fired Power Station, Munmorah
- Approved: 15 February 2007
- Applicant:
- Description: The modification application seeks to increase the noise limits to practical levels that account for the potential for low frequency noise impacts to occur.
- Location: Part Lot 61 DP 1065038, Mumorah Power Station, Munmorah
- Local government area: Wyong
- Capital cost of development:
- F/T construction jobs:
- F/T post construction jobs:
- Details: Instrument of Approval
- Documents available:
- MP 06_0171
- Title: State Significant Site Listing and Concept Plan for redevelopment of Carlton United Breweries Site, Chippendale
- Approved: 9 February 2007
- Proponent: Carlton & United Breweries (NSW) Pty Ltd
- Description: A Concept Plan for the proposed redevelopment of the Carlton United Breweries site in Chippendale under the provisions of Part 3A of the Environmental Planning and Assessment Act, 1979. The Proponent is also seeking to rezone and list the site as a State Significant Site in Schedule 3 of State Environmental Planning Policy (Major Projects 2005) to facilitate the redevelopment for mixed uses and public open space.
- Location: Carlton United Breweries Site, Chippendale
- Local government area: City of Sydney Council
- Capital cost of development: $800,000,000
- Documents available:
- Director-General's Report
- Instrument of Approval
- Conditions of Approval
- Part 3A major projects request
- Scoping Paper (Schedule 2 - Land Titles, CUB Site Rezoning Chronolog)
- Solar Access Clarification Statement
- CUB Expert Advisory Panel Report to Minister
- Director-General's Requirements (DGRs)
- State significant site study, Concept Plan, Environmental Assessment Documentation, and planning agreements
- MP 06_0162
- Title: State Significant Site and Major Project (concept plan) application for redevelopment of East Darling Harbour (EDH) (MP 06_0162)
- Approved: 9 February 2007
- Applicant: JBA Urban Planning Consultants (on behalf of Sydney Harbour Foreshore Authority)
- Description: The approval involves:
- A mixed use development of commercial, residential, tourist, retail and community uses;
- Building envelopes with a distribution of GFA between the development blocks within the mixed use zone;
- New public open space / public domain, with a range of formal and informal open spaces serving separate recreational functions and including a 1.4km public foreshore promenade;
- A passenger terminal and a maximum of 3000m2 GFA for active uses that support the public domain within the public recreation zone;
- Public domain landscape concept, including parks, streets and pedestrian connections;
- Creation of a partial new shoreline to the harbour and alteration of the existing sea walls; and
- Retention of the existing Sydney Ports Corporation Port Safety Operations and Harbour Tower Control Operations including employee parking.
- Location: East Darling Harbour, Lots 1-6 in DP 876514 (wharves 3,4,5,7 & 8)
- Local government area: City of Sydney
- Capital cost of development: $1.5 billion
- Details: 15,000 operational jobs
- Documents available: Instrument of Approval, Environmental Assessment Report
East Darling Harbour, Request Letter
Preliminary Environmental Assessment Scoping Paper
Director Generals Requirements
Preferred Project Report
Statement of Commitments
Environmental Planning Instruments and Other Legislation - MP 06_0116
- Title: Liverpool Hospital Concept Plan
- Approved: 2 February 2007
- Applicant: Health Administration Corporation (NSW Health
- Description:
- Concept Plan approval granted for:
- Land use distribution addressing hospital expansion, consolidation, and rationalisation; new hospital building footprints and heights; expanded research and educational facilities; provision of accommodation for students and nursing and medical staff; and accommodation for patient's relatives;
- Vehicular access and car parking arrangements with links to all hospital facilities; grade separated pedestrian access across north-south railway to the eastern campus; new car parking facilities and new hierarchy and layout of internal and external access roads and bridges, including road bridge across the rail line; and new and enhanced hospital entry points;
- Landscaping including new pedestrian links and the introduction of a major east-west pedestrian mall;
- Early works to facilitate construction of a new eight storey core hospital development, associated site infrastructure and the east campus car park;
- Early site preparatory works including utility services divisions, demolition, in-ground engineering services, bulk excavation and temporary accommodations for the construction period; and
- Detailed excavation works and structural works up to ground level for the new eight storey core hospital building.
- Project Application approval is granted for:
- Identification, diversion, relocation and reconnection of existing reticulated services (in-ground and above ground) that may be affected by the proposed demolition of existing buildings and / or earthworks excavation;
- Archaeological assessment and investigations, preparation and implementation of a heritage management plan for monitoring, removal, archiving and protection of materials as required for building demolitions and / or excavation;
- Demolition of South Wing, B Wing, D Wing, Workshops and Linen (corporate services linen and associated workshops), Engineering (engineering offices, workshops and sheds), interconnecting corridors and Ron Dunbier - East Wing;
- Construction of new facades / service wall for the western wing of the existing Ron Dunbier accommodation building;
- Internal adaptation of existing buildings to accommodate dislocated services (as a result of demolitions);
- Bulk excavation;
- Identification, monitoring and removal of hazardous materials following further detailed hazardous material and soil contamination investigations; and
- Structural works to ground level including piling, piers, slabs and columns.
- Concept Plan approval granted for:
- Location: Lots 1-3 DP 827031, Lot 1-3 DP 596770, Lot 101 DP 793557, Lot 2 DP 805696, Lot 1 DP 863491, Lot 1 DP 581947, Lot A DP 432628, Lots A & B 404723, Lot 1 DP 724026, and Lots 2-13 DP 758620.
- Local government area: Liverpool City
- Capital cost of development: Concept Plan - $390 million
Project Application - $13.5 million - F/T construction jobs: 1, 000
- F/T post construction jobs: 1, 900
- Documents available:
Director General's Environmental Assessment Report Chapter 1
Director General's Environmental Assessment Report Chapter 2
Director General's Environmental Assessment Report Chapter 3
Director General's Environmental Assessment Report Chapter 4
Director General's Environmental Assessment Report Chapter 5
Director General's Environmental Assessment Report Chapter 6
Director General's Environmental Assessment Report Chapter 7
Director General's Environmental Assessment Report Appendices
Instrument of Approval
Liverpool Application Letter - Page 1
Liverpool Application Letter - Page 2
Liverpool Application Letter - Page 3
Preliminary Environmental Assessment
The Director General's Environmental Assessment Requirements and the exhibited Environmental Assessment are available at:
http://www.health.nsw.gov.au/assets/part3adocument.html The Preferred Project Report can be viewed at:
http://www.health.nsw.gov.au/assets/part3adocument.html - MP 06_0136
- Title: Sydney Cricket Ground (SCG) (MP 06_0136)
- Approved: 2 February 2007
- Applicant: Sydney Cricket & Sports Ground Trust (SC&SGT)
- Description: Project approval is granted to the carrying out of the following:
- Construction activities on adjoining lands owned by Centennial Parkland and Moore Park Trust (CPMPT) and occupied by Fox Studios including the erection of an ivy wall support in John Hargreaves Avenue, safety fencing, roof protection and the erection of a hoarding over John Hargreaves Avenue.
- Relocation of the video scoreboard and tri-vision advertising panels to the top of the Dally Messenger Stand (will partly project over adjoining lands owned by CPMPT and occupied by Fox Studios).
- Demolition and removal of Yabba's Hill, the Doug Walters stand and other miscellaneous structures, including those located at the rear of the Clive Churchill Stand adjacent the boundary wall and the old scoreboard and preparatory excavation activities.
- Construction of a new grandstand to provide seating for approximately 12,400 spectators including ancillary facilities and provision of associated ingress and egress including penetrations to the ivy wall adjacent John Hargreaves Avenue (will partly project over adjoining lands owned by CPMPT and occupied by Fox Studios).
- Carrying out of associated grandstand construction activities on adjoining lands owned by CPMPT and occupied by Fox Studios).
- Relocation of existing floodlighting tower (No. 3) to the top of the proposed new lift shafts within the new grandstand and upgrading of all 6 existing floodlighting tower luminaries.
- Location: Sydney Cricket Ground, Moore Park
- Local government area: City of Sydney Council
- Capital cost of development: $63 million
- Approval authority: Minister for Planning
- Relevant Legislation: Part 3A of the Environmental Planning and Assessment Act 1979.
State Environmental Planning Policy (Major Projects) 2005 - Further Enquiries: By phone: 1300 305 695
By email: information@planning.nsw.gov.au
By post: Director, Strategic Assessments, Department of Planning, GPO Box 39, Sydney, NSW 2001 - Documents available:
Director-General's Environmental Assessment Requirements
Environmental Assessment and Preferred Project Report (including accompanying application drawings) are available for viewing at http://www.sydneycricketground.com.au/SCG-Hill-Grandstand.html
Director-Generals Environmental Assessment Report- Director-Generals Environmental Assessment Report Cover- Section 1
- Director-Generals Environmental Assessment Report Section 2
- Director-Generals Environmental Assessment Report Section 3
- Director-Generals Environmental Assessment Report Section 4-5
- Director-Generals Environmental Assessment Report Section 6-7
Signed Instrument of Approval
Conditions of Approval
Application Letter
Application Form
Preliminary Assessment
- 06_0057
- Title: Glennies Creek Colliery Surface Facilities
- Approved: 31 January 2007
- Applicant: Glennies Creek Coal Management Pty Limited
- Description: The project involves the:
- continued use of existing mine-related surface facilities and infrastructure at the Glennies Creek Coal Mine; and
- construction and operation of additional surface facilities, including various demountable buildings, sealed extension of the car park, coal handling system, stores compound, additional underground water supply tanks, extension of the existing electrical substation, extension to coal stockpile areas, ballast delivery and stockpile area at the Forest Road Ventilation Shaft, and additional gas drainage boreholes.
- Location: Glennies Creek Coal Mine, approximately 12km north of Singleton.
- Local government area: Singleton
- Capital cost of development: $8,100,000
- F/T construction jobs: 10
- F/T post construction jobs: 150
- Documents available: Assessment Report; Project Approval; Major Projects Application,Preliminary Assessment Report, Maps (Figure 1, Figure 2, Figure 3, Figure 4, Figure 5, Figure 6, Figure 7), Director-General's requirements, Proponent's Response to Submissions - Part A, Proponent's Response to Submissions - Part B
Environmental Assessment documents as follows:
GCCM_EA_Summary, GCCM_EA_Text(Part A), GCCM_EA_Text(Part B), GCCM_EA_Appendix 1(Part A), GCCM_EA_Appendix 1(Part B), GCCM_EA_Appendix 1(Part C), GCCM_EA_Appendix 2, GCCM_EA_Appendix 3, GCCM_EA_Appendix 4, GCCM_EA_Appendix 5, Figure 1.1, Figure 1.2, Figure 1.3, Figure 1.4, Figure 1.5, Figure 2.1, Figure 2.2, Figure 2.3, Figure 2.4, Figure 2.5, Figure 3.1, Figure 3.2, Figure 3.3, Figure 4.1, Figure 4.2, Figure 5.1, Figure 5.2, Plate 1.1. - 06_0192
- Title: Royal North Shore Hospital (RNSH) Research and Education Building (MP 06_0192)
- Approved: 29 January 2007
- Applicant: NSW Health and Northern Sydney and Central Coast Area Health Service (NSCCAHS)
- Description: Project approval is granted to the carrying out of the following:
- Erection of an 11 storey building for use as a medical research and education facility, ancillary laboratory space and associated administration comprising 24,000m2 gross floorspace.
- Implementation of soft and hard landscaping measures, pedestrian and servicing access arrangements and utility services and associated infrastructure and plant.
- Location: Royal North Shore Hospital - Corner of Westbourne Street and Reserve Road, St Leonards
- Local government area: Willoughby City Council
- Capital cost of development: $110 million
- Approval authority: Minister for Planning
- Relevant Legislation: Part 3A of the Environmental Planning and Assessment Act 1979.
State Environmental Planning Policy (Major Projects) 2005 - Further Enquiries: By phone: 1300 305 695
By email: information@planning.nsw.gov.au
By post: Director, Strategic Assessments, Department of Planning, GPO Box 39, Sydney, NSW 2001 - Documents available:
- NSW Health Request Letter
- NSW Health Request Letter Appendices
- NSW Health Preliminary Environmental Assessment
- Minister's Clause 6 Opinion
- Director General's Environmental Assessment Requirements
- The Environmental Assessment and Appendices Available at www.elton.com.au/talkRNSH
- Conditions of Approval
- Director Generals Environmental Assessment Report
- Signed Instrument of Approval
- MP 06_0129
- Title: Auburn Hospital (Project Application)
- Approved: 26 January 2007
- Proponent: NSW Health
- Description: The project involves the:
- Staged demolition of existing structures and removal of site vegetation;
- Site preparation including excavation and decontamination;
- Construction of a new 23,000m2 (approx) 184-bed five (5) storey hospital accommodating an emergency department, medical and surgical in-patients, and paediatric, maternity, new born care and high dependency patients;
- Associated site infrastructure including a total of 150 temporary car parking spaces on the Arthur Stone Annexe and Main Hospital Site;
- Retention of the existing single storey Geriatric / Aged Day Care Service Building on the Arthur Stone Annexe;
- Establishment of new site access and cross over locations; and
- Implementation of soft and hard landscaping.
- Location: Auburn Hospital - Norval Street and Hevington and Hargrave Roads, Auburn. Lots 1-16 in DP 873, Lot A in DP 102993, Lot B in DP 102993, Lot C in DP 420405 and Lot X 102994.
- Local government area: Auburn
- Capital cost of development: $139 million
- FT construction jobs: NA
- FT operational jobs: NA
- Further inquiries Anthony Witherdin on (02) 9228 6173
- Details of approval: Project approval and conditions and Director-General's Assessment Report
- Additional information: Director General's requirements for Environmental Assessment (issued 16 June 2006)
The Project Application (including the Environmental Assessment) as well as other documentation prepared by the proponent for this project can be viewed online at http://www.swahs.health.nsw.gov.au/capitalprojects/CapitalProjectsAuburn.htm - MP 05_0085
- Title: New faculty of law building, the University of Sydney, Camperdown Campus.
- Approved: 26 January 2007
- Applicant: Adam Pollack, Capital Insight Pty Ltd
C/- University of Sydney, Campus Property and Services - Description: Construction of a building for the Faculty of Law within the Camperdown Campus including library, lecture theatres, moot court facilities, 5 storey teaching building, 7 storey faculty building, light tower and basement car parking.
- Location: 3000 Parramatta Road, Camperdown
- Local government area: City of Sydney
- Capital cost of development: $95,000,000
- F/T construction jobs: 150 full-time equivalent construction
- F/T post construction jobs: N/A
- Documents available: Preliminary Assessment - Faculty of Law; Appendix A - Plans, Sections and Elevations; Appendix B - Building Envelope; Director-General’s Environmental Assessment Requirements; Final Conditions for Approval; Final DG's Report
- MP 06_0262
- Title: Determination of Major Project
- Approved: 25 January 2007
- Applicant: Landcom, on behalf of the NSW Department of Health
- Description: The demolition of buildings and structures located in the former Royal Newcastle Hospital site in two stages.
- Location: Lots 1 & 4 DP 1029006, Lot 11 & 12 DP 635003, Pacific Street Newcastle.
- Local government area: Newcastle
- Capital cost of development: $10,000
- F/T construction jobs: 50
- F/T post construction jobs: N/A
- Details: Determination, DG Report, Environmental Assessment Report, Appendix A, Appendix B, Appendix C, Appendix D, Appendix E
- MP 06_0263
- Title: Determination of Project Application
- Approved: 25 January 2007
- Applicant: Landcom, on behalf of the NSW Department of Health (Health Administration Corporation as landowning entity)
- Description: 2 Lot Torrens title subdivision
- Location: Lots 1 DP 1029006 Pacific Street, Newcastle.
- Local government area: Newcastle
- Capital cost of development: $777,000
- Details: Determination, DG Report, Environmental Assessment Report, Appendix A - Ministers Letters, Appendix B - Subdivision Plan, Appendix C - Services Diversion Report, Appendix D - Fire Separation Report, Appendix E - Parking and Traffic Report, Appendix F - Letter from DMB - Car Parking
- MP 06_0078
- Title: Lismore Base Hospital (LBH) (MP 06_0078)
- Approved: 25 January 2007
- Approval authority: Minister for Planning
- Relevant Legislation: Part 3A of the Environmental Planning and Assessment Act 1979. State Environmental Planning Policy (Major Projects) 2005
- Description: Project approval is granted to the carrying out of the following:
- Erection of three single storey buildings for use as a mental health facility for adult and child and adolescent in-patient facilities, ambulatory care facilities and associated administration and research comprising a total gross floor area of 4,966m2.
- Construction of vehicular access points off Laurel Avenue and Weaver Street and the development of a pedestrian link from the existing hospital building (Block A) into the new mental health facility.
- Provision of at-grade and underground off street car parking for 232 vehicles and on street car parking immediately fronting the hospital property for 89 vehicles totalling 416 car parking spaces.
- Implementation of soft and hard landscaping measures and utility services and associated infrastructure and plant.
- Location: Lismore Base Hospital - Hunter St and Uralba St, Lismore
- Local government area: Lismore City Council
- Further Enquiries: By phone: 1300 305 695
By email: information@planning.nsw.gov.au
By post: Director, Strategic Assessments, Department of Planning, GPO Box 39, Sydney, NSW 2001 - Capital cost of development: $38.5 million
- Documents available:
Director-General's Environmental Assessment Requirements
Director Generals Environmental Assessment Report Signed Instrument of Approval
Conditions of Approval
Request Letter (RTF)
Preliminary Environmental Assessment (scoping document)
Preferred Project Report
The Environmental Assessment and accompanying application drawings are available for viewing at http://www.ncahs.nsw.gov.au - MP 06_0077
- Title: Queanbeyan Hospital (MP 06_0077)
- Approved: 25/1/2007
- Applicant: NSW Health
- Description: The project involves the:
- Demolition of existing single and two storey main hospital building.
- Construction of a new 60 bed hospital building over 4 levels to accommodate ambulatory care, emergency services, operating suites, patient accommodation, office/ storage accommodation, catering facilities, and a mortuary.
- Construction of associated vehicular accesses and on street and at grade car parking provision for 166 vehicles.
- Provision of soft and hard landscaping measures and utility services and associated infrastructure
- Location: Queanbeyan Hospital, land bounded by Anthill, Collett, Erin and Crawford Street, Queanbeyan
- Local government area: Queanbeyan City Council
- Capital cost of development: $36 million
- EFT jobs: 34
- Approval authority: Minister for Planning
- Relevant Legislation: Part 3A of the Environmental Planning and Assessment Act 1979.
State Environmental Planning Policy (Major Projects) 2005 - Further Enquiries: Anthony Witherdin (9228 6173)
- Documents available: View project documents
- MP 06_058 and 06_060
- Title: Proposal title: Vincentia Coastal Village - Residential and Commercial Development (06_0058 and 06_0060)
- Approved: 25 January 2007
- Applicant: Stockland Developments Pty Ltd
- Description: Concept approval is granted (subject to modifications) for:
- a residential development involving:
- up to 604 residential lots;
- open space area, comprising water sensitive urban design /asset protection zones and urban parks;
- at least 48 hectares of environmental conservation areas;
- an internal road network;
- three access points to Naval College Road;
- construction works related to providing physical infrastructure (both on and off site) and services including some vegetation clearing;
- water sensitive urban design measures and landscaping of public space in streets and parks;
- closure of unformed roads;
- for an adaptable housing area adjacent to the Bay and Basin Leisure Centre involving:
- no more than 136 dwellings;
- an internal road network;
- access to The Wool Road, and
- WSUD measures.
- the commercial development being a district town centre identifying:
- indicative building footprints;
- a total floor area of no more than 32,000 square metres;
- a range of uses, including a discount department store, supermarket, medical centre, child care centre, restaurants, potential housing and specialty retail;
- a site (Stage 3) for future retail development; and
- an indicative road network that includes a main street, access to The Wool Road and access to a proposed road in the subdivision.
- a 604 residential lot subdivision;
- an open space area of at least 60 hectares, comprising:
- water sensitive urban design /asset protection zones and urban parks, and
- at least 48 hectares of environmental conservation areas,
- an internal road network,
- three access points to Naval College Road;
- construction works related to providing physical infrastructure (both on and off site) and services including some vegetation clearing;
- water sensitive urban design measures and landscaping of public space in streets and parks; and
- closure of unformed roads.
- a residential development involving:
- Location: Lot 801 DP 1022286, Lot 802 DP 1022286, Lot 72 DP 874040, Lot 73 DP 874040, Lot 74 DP 874040 and Lot 75 DP 874040
- Local government area: Shoalhaven City Council
- Capital cost of development: $150 million
- F/T construction jobs: 220
- F/T post construction jobs: 490
- Details: Instrument of Approval, Preferred Project Report including Statment of Commitments, Response to Submissions, Environmental Planning Instruments and other Relevant Legislation, Director Generals Environmental Assessment Report
- Documents available:
- Further inquiries: Antony Pedroza on (02) 9228 6545
- 05_0166
- Title: Commercial Office Building, 20 & 22 Honeysuckle Drive, Newcastle
- Approved: 25 January 2007
- Applicant: Honeysuckle 231 Pty Ltd
- Description: Seven (7) storey mixed use commercial office development comprising of two towers, basement parking, ground floor retail space, a childcare centre and commercial offices and a 2 Lot Torrens Title subdivision.
- Location: Part Lot 231, DP 1072217, 20 & 22 Honeysuckle Drive, Newcastle
- Local government area: Newcastle
- Capital cost of development: $40,052,100
- Details: Final Schedule 2 Conditions, DG Report Jan 2007
- Documents available:
- Ground floor plan
- Level 2 plan
- Level 3 floor plan
- North and south elevations
- Project application
- Section
- MOD 1
- Twelve (12) storey including office space and plant room.
- Four (4) large studios and associated warehousing.
- 41,800m2 of gross floor space
- Two levels of semi-basement car parking (697 spaces), one which is for use by the occupants of the building (347 spaces) and the remaining level is for use by the landowner including visitor/public spaces (350 spaces).
- A landscaped open plaza at the south-eastern end of the building adjacent to a café, retails shops and entry foyers as well as various storage and utility rooms all at ground floor level.
- A landscaped park at the western end of Central Avenue, to the south of the building.
- General office area in levels 1 to 10 of the building.
Stage 1:
- Site establishment (including removal of vegetation).
- Demolition (several temporary buildings and sheds, retaining wall).
- Temporary diversion of a stormwater pipe.
- Shoring works.
- Bulk excavation works.
- Decontamination/remediation works.
- Rock anchoring.
- Dewatering.
- Detailed excavation.
- Install detention tank.
- Install box culvert.
- Piling and pile capping.
- Basement slab and lift pits.