Exempt development

The construction or installation of hot water heaters or hot water storage tanks may be exempt development under clause 2.46A of the State Policy.

The following standards apply to hot water systems:

  • If the system is installed externally and on or in a heritage item, draft heritage item, heritage conservation area or draft heritage conservation area, it must:
    • be in the rear yard
    • not be on a roof.
  • If the system uses a heat pump water heater, it must be designed to operate at the following noise levels:
    • no more than 5 dB(A) above the background noise level in the surrounding area, measured at the property boundary between 8 am and 10 pm Saturday, Sunday and public holidays, and between 7 am and 10 pm any other day
    • people in rooms of adjoining homes must not be able to hear the system at any other time.

Solar energy systems

Solar energy systems may be installed as exempt or complying development under the State Environmental Planning Policy (Transport and Infrastructure) 2021 (the ISEPP).

A solar energy system means any of the following systems:

  • photovoltaic electricity generating system,
  • solar hot water system,
  • solar air heating system.

Certain land restrictions may apply. You must make sure that you meet all the requirements for solar hot water systems in the Infrastructure SEPP before you begin any works. Solar hot water systems cannot be exempt development on a lot with a state or local heritage item, unless the system is not visible from any road. Restrictions apply to the permitted size, location and installation of ground-mounted and non-ground mounted systems

Complying development

Solar energy systems

Solar hot water systems cannot be complying development when the lot is within a heritage conservation area. Systems must comply with the requirements of clause 37(2) of the Infrastructure SEPP.

Other considerations

  • If you propose to remove or prune any existing trees or vegetation, you should contact your council first to make sure you don’t need approval for this.
  • Works must be structurally adequate, installed in accordance with manufacturer’s specifications and comply with the Building Code of Australia (BCA).
  • Any structures that would be located on public land, or on or over a public road (including temporary structures), must have separate approval from the relevant council, or Roads and Maritime Services under the Roads Act 1993 and the Local Government Act 1993.
  • Generally, exempt development cannot be carried out on:

More information

For more information, email the Codes team at [email protected]