Planning
Submitted by Ximena Dignam on

A report, unlike a BASIX certificate, can be generated at any stage whilst answering questions within the BASIX tool. There is no certificate fee payable to generate a report.

To generate a report within the BASIX Tool:

  1. Log into the NSW Planning Portal. Note: You will require a NSW Planning Portal account. For step-by-step instructions on how to create an account, please refer to the step-by-step guide How to register for a NSW Planning Portal account (PDF, 639 KB).
  2. Select “BASIX certificate” from the new application drop-down list on your dashboard, alternatively select BASIX from the “New” menu at the top left-hand corner of the screen.
  3. Input all of the required information to complete the application and calculate your scores.
  4. Proceed through the application to the summary screen.
  5. Once in the summary screen, select the Generate BASIX Report button to obtain the report.
Submitted by Ximena Dignam on

To edit an ‘in progress’ BASIX application, you must be the applicant (owner of the project):

  1. Log into the NSW Planning Portal
  2. Select the relevant BASIX application reference number from the Active Work tab on your dashboard.
  3. The application will open in edit mode. Navigate to the relevant section of the application and amend the information as needed.

Note: If you are not the applicant, the current owner and yourself will need to complete and submit the Authorisation to transfer BASIX project (PDF, 138 KB) files form.

Submitted by Ximena Dignam on

The BASIX service now has address verification for the project. To enter a project address:

  1. Enter the site address or the lot number/section number/plan number. As you type, the system will auto-suggest an address or lot/section/plan number based on the information entered. 
  2. Select the correct address or lot/section/plan number from the list.
    Note: For unregistered addresses, there is no auto-populate feature.  Select the “address did not display?” tick-box and enter the address, the lot/section/plan number and the local government area name manually.
  3. Click the tick-boxes to indicate the primary address for this application, the lot/section/plan number, and if there is proposed work to be carried out on the land adjacent to the selected lot(s).
    You can delete the address by clicking on the ‘bin’ icon.  

Note: You must select both boxes or you will be unable to calculate BASIX scores or create a BASIX certificate.

Submitted by Ximena Dignam on

The BASIX standards still apply if you have access to your own off-grid water, electricity or gas supply.

If the proposed building does not have mains water supply, it is expected to have sufficient alternative water sources (such as rainwater tanks) connected to satisfy demand. BASIX assesses if these water sources will satisfy the demand without needing excessive top-up of water from off-site. Depending on the location of the building, the BASIX score in the water section needs to achieve a required standard (e.g. 40 in coastal NSW).

If the proposed building is not connected to the electricity grid, other alternative energy sources (such as bottled gas) are required to satisfy domestic demand.

Submitted by Ximena Dignam on

No. A BASIX certificate is not required for a manufactured home.

When you select “Manufactured Home” as the development type for a Complying Development Certificate or development application, it will not trigger a requirement for a BASIX certificate.

For more information about a BASIX certificate not being required for a manufactured home, please refer to Planning Circular PS21-016 (PDF, 167 KB)

Submitted by Ximena Dignam on

Applications with a status of "In progress" are cancelled after 28 days of inactivity. A reminder notification is sent after 21 days of inactivity.  If you would like to retain your application, please edit or submit the application to keep it active.

Alternatively, you can let the application expire. When you are ready to proceed, you can open the cancelled application within the Completed Work tab of your dashboard and select the ‘Copy to new application’ button in the top right of the application screen. This will copy the information you had previously entered into a new application with a new application number.

Submitted by Ximena Dignam on

If you need to change / replace your appointed Principal Certifier, you will need to complete a new application within the Post-consent Certificate digital service on the NSW Planning Portal. This will ensure that the new Principal Certifier has access to the relevant applications.

When doing so, please ensure you select “Yes” to the question “Is this application to track transfer of Principal Certifier?”. Once you submit this new application, the newly nominated Principal Certifier will receive a notification to advise that you wish to appoint them as the Principal Certifier for your building works. If the nomination is accepted, the relevant consent authority will be advised, meeting the requirement under Section 57 of the Environmental Planning and Assessment (Development Certification and Fire Safety) Regulation 2021.

Please view the Quick Reference Guide, How to appoint a Principal Certifier (PDF, 12.86 MB) for more information.

Submitted by Ximena Dignam on

To revise a BASIX certificate:

  1. Log into the NSW Planning Portal.
  2. Select the relevant BASIX application reference number from your dashboard.
  3. Select the “Revision” button on the application banner.
  4. A new reference number and application will be generated. Complete the required information and calculate your scores.

For further instructions, please refer to the Revise a BASIX certificate (PDF, 176 KB) step-by-step guide.

Note: To revise a BASIX certificate created within the NSW Planning Portal, you must be the applicant. If you are not the applicant, the current owner and yourself will need to complete and submit the Authorisation to transfer BASIX project files (PDF, 138 KB) form.

Submitted by Ximena Dignam on

When the BASIX service was transferred to the NSW Planning Portal, some “in progress” and completed projects were also migrated across.

You can access your “in progress” projects last accessed on or after 1 January 2021 from the Active work tab on the NSW Planning Portal. Note: Any projects last accessed before 1 January 2021 were not migrated to the NSW Planning Portal and are unable to be accessed. Please start a new BASIX application for your proposed development.

All completed BASIX certificates (projects), including those you have archived, are located in your BASIX historical work folder, accessed via the top left-hand navigation menu.

Subscribe to Applicant